Laserfiche WebLink
1 <br />Consent Decree Exhibit C <br />1 <br />1 <br />L� <br />1 <br />1 <br />iu <br />1 <br />1 <br />1 <br />L! <br />1 <br />1 <br />1 <br />1 <br />lJ <br />1 <br />8.0 References <br />Associated Earth Sciences, Inc. 2000. Site review of the outer (western) drainage ditch of the <br />eastern set of BNSF tracks and general review of wildlife habitat conditions in the <br />eastern project area. Prepared for City of Everett. March. <br />Black & Veatch. 1995. Final Interim Action Report, Everett Landfill and Tire Fire Site. Prepared <br />for City of Everett. December. <br />1996. Final Supplemental Remedial Investigation/Feasibility Study, Everett Landfill and <br />Tire Fire Site. Prepared for City of Everett. Seattle, Washington. <br />1997. Sediment Sampling / Ditch Survey Results, Everett Landfill and Tire Fire Site. <br />Prepared for City of Everett. Seattle, Washington. April. <br />City of Everett. 1997. Everett Comprehensive Land Use Plan. July. Everett, Washington. <br />Floyd & Snider Inc. (FSI). 2000. Brownfield Feasibility Study. Prepared for City of Everett. <br />Seattle, Washington. November. <br />Washington State Department of Ecology (Ecology). 1999. Draft Cleanup Action Plan, Toxics <br />Cleanup Program. Olympia, Washington. <br />ERM-Northwest Inc. 1993. Final Feasibility Study and Phase 11 Remedial Investigation, Everett <br />Landfill, Everett, Washington. September. <br />Environmental Partners. 1999. Limited Phase ll Investigation Report, Railroad Relocation Plan, <br />Everett, WA. Prepared for City of Everett. November. <br />FINAL March 2001 8-1 Everett Landfill Tire Fire Site <br />Cleanup Action Plan <br />1 <br />