My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3800 RIVERFRONT BLVD 2025-07-23
>
Address Records
>
RIVERFRONT BLVD
>
3800
>
3800 RIVERFRONT BLVD 2025-07-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2025 3:49:01 PM
Creation date
6/18/2025 10:18:28 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3800
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />Consent Decree Exhibit C <br />1 <br />1 <br />J <br />1 <br />1 <br />I� <br />[l <br />fi <br />1 <br />1 <br />1 <br />u <br />C <br />1 <br />1 <br />1 <br />Table 2-1 <br />Regulatory History <br />Date <br />Action <br />Landfill Closure and Pre -Consent Order <br />1974 <br />Landfill stopped accepting waste <br />1975 <br />Landfill closed per WAC 173-301 <br />1983 <br />Tire Fire <br />1984 <br />Tire Fire <br />August 1985 <br />Preliminary Assessment, SAIC <br />October 1986 <br />RUFS and Chemical Fixation Studies, SAIC <br />1987 <br />Ecology and Environment Investigation <br />1989 <br />MTCA enacted by the State <br />January 1989 <br />Preliminary Assessment by Ecology <br />July 1989 <br />Potential Liable Parties notified by Ecology <br />Consent Order <br />February 1990 <br />Consent Order issued <br />March 1990 <br />Extended Ash Sampling Program, SAIC <br />March 1991 <br />Phase I Study, ERM <br />September 1993 <br />Phase II Study, ERM <br />December 1995 <br />Interim Action Report, Black & Veatch <br />January 1996 <br />Supplemental RI/FS, Black & Veatch <br />Enforcement Order <br />June 1994 <br />Enforcement Order issued <br />August 1995-May 1996 <br />Landfill Grading — Interim Action <br />June 1997-May 1998 <br />Leachate Collection System Construction — Interim Action <br />Draft Cleanup Action Plan and Brownfield Project <br />September 1998 <br />EPA Brownfield Grant application <br />March 1999 <br />Draft CAP received from Ecology <br />March 1999 <br />Geotechnical Investigation, Floyd & Snider <br />April 1999 <br />Draft Consent Decree <br />May 1999 <br />Existing Conditions Report, Floyd & Snider <br />August -September 1999 <br />Ambient Air Sampling & Evaluation, Floyd & Snider <br />October 1999 <br />Groundwater Cleanup Levels and Point of Compliance <br />Report, Floyd & Snider <br />October -November 1999 <br />Groundwater Baseline Sampling, HWA GeoSciences <br />December 1999 <br />Gas Management FFS, Floyd & Snider <br />September 2000 <br />Brownfield Feasibility Study, Floyd & Snider <br />FINAL - March 2001 <br />Table Everett Landfill Tire Fire Site <br />2-1 Cleanup Action Plan <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.