My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3800 RIVERFRONT BLVD 2025-07-23
>
Address Records
>
RIVERFRONT BLVD
>
3800
>
3800 RIVERFRONT BLVD 2025-07-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2025 3:49:01 PM
Creation date
6/18/2025 10:18:28 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3800
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSENT DECREE EXHIBIT D <br />EVERETT LANDFILL/TIRE FIRE SITE <br />Development Components <br />Environmental Requirements <br />City Review Comments <br />and submittal reference <br />ie page, sheet # <br />Ecology Review <br />Comments <br />Construction Disruption <br />Site re -grading including cut <br />Dust and odor controls during construction - During Site <br />O Approved as submitted <br />and fill magnitudes typical for <br />construction activities, dust and odor controls would be required to <br />0 Resubmit as noted <br />an urban redevelopment site. <br />prevent migration of materials outside the construction zone at <br />Assume regrading could <br />levels of concern. These measures will include daily cover of any <br />encounter refuse, and perched <br />exposed waste, and could include localized wetting, application of' <br />groundwater. <br />suppressant foams, or use of temporary cover materials. <br />Stormwater management - Erosion controls using best management <br />practices, as necessary, in accordance with the City of l:verett's <br />Subsurface excavation for <br />Stormwater Management Manual and provisions of a NPDES permit <br />utilities and structures. <br />for construction sites greater than five acres, as applicable. Run-on <br />controls to prevent run-on of surface water onto exposed landfilled <br />materials. <br />import and export ofsoils. <br />potential localized refuse <br />Direct contact controls - Health and safety requirements for <br />construction crews, to be triggered if construction occurs below the <br />removal, and stockpiling. <br />elevation of -the clean soil cap. <br />Construction dewatering procedures - Excavation construction for <br />future potential development will likely encounter perched <br />groundwater in portions of the waste. This water must be assumed <br />contaminated and handled accordingly. Pumped dewatering water <br />could be discharged into the Icachatc collection system provided it is <br />approved by City Industrial Pretreatment Program. Or, the water <br />could be stored in mobile tanks, tested for contaminants and <br />disposed of accordingly. <br />Construction performance monitoring and inspection -- During Site <br />construction activities, inspections for adequate perimeter dust <br />controls, erosion controls, and dewatering and odor controls are <br />required. On -site construction oversight by a health and safely <br />prolessional or inspector is required of all applicable development <br />activities as described in the CMCP. <br />Controlled on -site relocation and re -capping of excavated refuse <br />during construction activities is allowed. Location and quantities <br />will be approved prior to excavation. As necessary, excavated <br />refuse could also be disposed off -site in an active municipal landfill. <br />CONTINUED <br />City / Ecology Development Review Checklist Exhibit D Page 8 of 13 <br />�■ r r r �■ r r ■� r r r r r r� ■■r ■■� r� <br />
The URL can be used to link to this page
Your browser does not support the video tag.