Laserfiche WebLink
GENERAL NOTES: ACCIDENTS CAUSING DEATH, INJURES, OR DAMAGE MUST BE REPORTED IMMEDIATELY TO THE OWNER BY TELEPHONE THE CONTRACTOR'S SITE SAFETY AND HEALTH OFFICER SHALL BE DELEGATED THE AUTHORITY TO ORDER ANY PERSON <br /> OR WORKER ON THE LANDFILL SITE TO FOLLOW THE SAFETY RULES. FAILURE TO OBSERVE THESE RULES IS SUFFICIENT <br /> SPECIAL LANDFILL SITE REQUIREMENTS: OR MESSENGER. IN ADDITION, PROMPTLY REPORT IN WRITING TO THE OWNER ALL ACCIDENTS WHATSOEVER ARISING CAUSE FOR REMOVAL OF THE PERSON OR WORKER(S) FROM THE PROJECT. <br /> OUT OF, OR IN CONNECTION WITH, THE PERFORMANCE OF THE WORK WHETHER ON, OR ADJACENT TO, THE SITE, GIVING <br /> A PORTION OF THE PROJECT IS LOCATED ON THE EVERETT LANDFILL SITE. THE EVERETT LANDFILL SITE IS SUBJECT TO A FULL DETAILS AND STATEMENTS OF WITNESSES. THE SITE SAFETY AND HEALTH OFFICER SHALL HAVE TAKEN A COURSE SATISFYING THE TRAINING REQUIREMENTS OF 29 <br /> CONSENT DECREE BETWEEN THE CITY, RIVERFRONT COMMERCIAL INVESTMENT, LLC, AND THE STATE DEPARTMENT OF ECOLOGY CFR 1910.120 FOR HAZARDOUS WASTE SITE OPERATIONS. A COPY OF THE SITE SAFETY AND HEALTH OFFICER'S 40 <br /> THAT INCLUDES SPECIAL REQUIREMENTS FOR WORK ON THE LANDFILL SITE AS DESCRIBED BELOW. ALL CONSTRUCTION WORK CONTACT INFORMATION: RIVERFRONT COMMERCIAL INVESTMENT LLC, HOUR OSHA HAZMAT CERTIFICATE SHALL BE KEPT AVAILABLE ON SITE. <br /> SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONSENT DECREE AND THE ENVIRONMENTAL REQUIREMENTS OF ATTENTION: RIVERFRONTCOMMERCIALOSHELTERHOLDINGS.COM <br /> THE CLEANUP ACTION PLAN. PHONE: 425.559.2300 ADDRESS: 11624 SE 5TH STREET, SUITE 210, BELLEVUE, WA 98005 THE SITE SAFETY AND HEALTH OFFICER IS RESPONSIBLE FOR DETERMINING THE EXTENT TO WHICH ANY SAFETY <br /> TO RESTRICT PUBLIC ACCESS TO THE LANDFILL SITE DURING CONSTRUCTION, FENCING AND LOCKING GATES SHALL BE IF A CLAIM IS MADE BY ANYONE AGAINST THE CONTRACTOR OR ANY SUBCONTRACTOR ON ACCOUNT OF ANY ACCIDENT, EQUIPMENT MUST BE UTILIZED, DEPENDING ON CONDITIONS ENCOUNTERED AT THE SITE. <br /> 6 MAINTAINED DURING CONSTRUCTION AND SECURED DAILY. THE CONTRACTOR SHALL PROMPTLY REPORT THE FACTS IN WRITING WITHIN 24 HOURS AFTER OCCURRENCE, TO THE WET WEATHER HANDING AND PLACEMENT OF EXISTING ON-SITE SOIL: <br /> OWNER, GIVING FULL DETAILS OF THE CLAIM. <br /> z° CONTRACTOR MUST DEVELOP, SUBMIT FOR OWNER APPROVAL, AND MAINTAIN, A SITE SAFETY AND HEALTH PLAN AT ALL TIMES. SITE SAFETY AND HEALTH PLAN: 1. DUE TO HIGH FINES CONTENT, THE EXISTING ON-SITE SOIL SPECIFIED HEREIN WILL BE MOISTURE SENSITIVE AND VERY THE SITE HEALTH AND SAFETY PLAN SHALL MEET THE REQUIREMENTS OF CFR 1910.120 AND THE CONSENT DECREE, AND BE DIFFICULT TO IMPOSSIBLE TO COMPACT DURING WET WEATHER OR WHEN ITS MOISTURE CONTENT INCREASES TO MORE THAN <br /> ABOUT 2 PERCENT OVER OPTIMUM. <br /> SUBMITTED TO THE CITY OF EVERETT AND THE STATE DEPARTMENT OF ECOLOGY FOR REVIEW. DEVELOP, IMPLEMENT AND MAINTAIN FOR THE DURATION OF THIS CONTRACT, A SITE SAFETY AND HEALTH PLAN <br /> PREPARED UNDER THE SUPERVISION OF AND SIGNED BY A CERTIFIED INDUSTRIAL HYGIENIST THAT WILL EFFECTIVELY 2. THE CONTRACTOR SHALL COVER AND PROTECT ALL STOCKPILES OF ON-SITE AND IMPORTED SOIL FROM BEING EXPOSED TO <br /> DUST AND ODOR CONTROL: INCORPORATE AND IMPLEMENT ALL REQUIRED CITY, COUNTY, STATE, AND FEDERAL SAFETY PROVISIONS. THE SITE RAIN. THE CONTRACTOR IS REQUIRED TO CONTROL THE MOISTURE CONTENT ON ALL EXISTING ON-SITE SOIL SUCH THAT IT <br /> SAFETY AND HEALTH PLAN SHALL BE CONSISTENT WITH ALL APPLICABLE LOCAL, STATE AND FEDERAL HEALTH <br /> CAN BE PLACED AND COMPACTED AS SPECIFIED HEREIN. IF IN THE OPINION OF THE ENGINEER, PORTIONS OF THE EXISTING <br /> THE SITE SHALL BE MONITORED FOR FUGITIVE DUST. IF FUGITIVE DUST DEVELOPS, CONTRACTOR IS TO WATER DOWN STANDARDS AND GUIDELINES, INCLUDING, BUT NOT LIMITED TO, THE OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA), SITE STOCKPILE OR ANY IMPORTED SOIL STOCKPILED ON THE LANDFILL SITE BECOME EXCESSIVELY WET DUE TO NOT BEING <br /> z THE WORK AREA UNTIL DUST IS CONTROLLED FROM MIGRATING OUTSIDE OF THE CONSTRUCTION ZONE. DUST CONTROL THE WASHINGTON INDUSTRIAL SAFETY AND HEALTH ACT (WISHA), THE NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY PROPERLY COVERED AND PROTECTED FROM RAIN, THOSE PORTIONS OF THE STOCKPILE SHALL BE DRIED/AMENDED/MOISTURE <br /> MEASURES SHOULD NOT RESULT IN SURFACE WATER RUNOFF. AND HEALTH (NIOSH), THE AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH), AND THE U.S. CONDITIONED AT THE CONTRACTOR'S SOLE EXPENSE. THE CONTRACTOR SHALL ENSURE THAT PONDING DOES NOT OCCUR ON <br /> o ENVIRONMENTAL PROTECTION AGENCY (EPA). WHERE THESE ARE IN CONFLICT, THE MORE STRINGENT REQUIREMENTS THE LANDFILL COVER. <br /> y ODOR EMISSIONS SHALL BE CONTROLLED TO ENSURE COMPLIANCE WITH STATE OF WASHINGTON AND PUGET SOUND AIR SHALL BE FOLLOWED. THE PLAN SHALL BE SUFFICIENT TO PROTECT ONSITE AND OFFSITE PERSONNEL FROM THE <br /> o AGENCY REGULATIONS. METHODS OF CONTROL SHALL INCLUDE BUT IS NOT LIMITED TO AIR MONITORING AT DOWNLOAD POTENTIAL PHYSICAL, CHEMICAL, AND/OR BIOLOGICAL HAZARDS PARTICULAR TO THE SITE. THE CONTRACTOR SHALL 3. ISOLATED OR EXTENDED PERIODS OF WET WEATHER MAY FORCE THE CONTRACTOR TO SUSPEND PLACEMENT AND COMPACTION <br /> PERIMETER WORK AREA LOCATIONS, POLYETHYLENE OR OTHER SHEETING, TAPPING, OR TEXTILE TO COVER EXPOSED SOIL AREAS ASSIGN AN INDIVIDUAL TO SERVE AS A SITE SAFETY AND HEALTH OFFICER AT THE JOB SITE AT ALL TIMES DURING WORK, OF EXISTING ON-SITE SOIL. IT WILL BE THE CONTRACTOR'S IRRESPONSIBILITY TO COMPLETE THE SPECIFIED WORK IN THE <br /> AND WASTE CONTAINERS, AND USE OF WATER SPRAYS. WHO WILL BE QUALIFIED, RESPONSIBLE, AND AUTHORIZED TO SUPERVISE AND ENFORCE COMPLIANCE WITH THE SITE SPECIFIED SCHEDULE. <br /> SPECIAL SAFETY PROVISIONS: SAFETY AND HEALTH PLAN. <br /> THE CONTRACTOR'S WRITTEN SITE SAFETY AND 4. WET WEATHER HANDLING AND PLACEMENT OF EXISTING ON-SITE SOIL REQUIREMENTS NOTED ABOVE SHALL ALSO APPLY TO <br /> CONSTRUCTION OF THIS PROJECT IS BEING PERFORMED ON, AND ADJACENT TO BURIED WASTES AND REFUSE. AS LOW PERMEABILITY SOIL, AND OTHER MOISTURE SENSITIVE MATERIALS, SUCH AS BENTONITE AMENDED SOILS. <br /> S, THESE BURIED MATERIALS DECOMPOSE ANAEROBICALLY, THEY GENERATE LANDFILL GAS (LFG), WHICH NORMALLY HEALTH PLAN SHOULD INCLUDE, BUT NOT BE LIMITED TO: PLACING AND SPREADING EMBANKMENT OF STRUCTURAL FILL MATERIALS: <br /> CONSISTS OF CARBON DIOXIDE (CO2), METHANE (CH4), OCCASIONALLY HYDROGEN SULFIDE (H2S) AND OTHER GASES, <br /> DEPENDENT ON THE COMPOSITION OF THE BURIED MATERIALS. HAZARDOUS CONDITIONS DUE TO LANDFILL GASES 1. A LIST OF NAMES OF KEY PERSONNEL AND ALTERNATES RESPONSIBLE FOR SITE SAFETY AND HEALTH, INCLUDING THE SITE 1. DURING COMPACTION OPERATIONS, MAINTAIN MOISTURE CONTENT IN EACH LIFT OF STRUCTURAL FILL WITHIN THE SPECIFIED <br /> INCLUDE BUT ARE NOT LIMITED TO FIRES, EXPLOSIONS, OXYGEN DEFICIENCY, AND TOXIC ENVIRONMENTS. LEACHATE SAFETY AND HEALTH OFFICER. TARGET MOISTURE CONTENT RANGE. <br /> (I.E.,CONTAMINATED LIQUID THAT HAS COME IN CONTACT WITH REFUSE AND CONTAINS WASTE DEGRADATION <br /> PRODUCTS) MAY BE PRESENT IN EXCAVATIONS. 2. A LIST OF CHEMICAL AND PHYSICAL HAZARDS (SUCH AS METHANE EXPOSURE), ALLOWABLE OSHA EXPOSURE LEVELS, 2. THE STRUCTURAL FILL MATERIAL SHALL BE SPREAD EVENLY IN HORIZONTAL LIFTS NOT EXCEEDING 12 INCHES (UNCOMPACTED <br /> a THRESHOLD LIMIT VALUES, OTHER REGULATORY EXPOSURE LEVELS, AND THE EMERGENCY RESPONSE SHOULD AN EXPOSURE OR THICKNESS). COMPACT EACH LIFT TO AT LEAST 95 PERCENT OF MODIFIED PROCTOR MAXIMUM DRY DENSITY DETERMINED IN <br /> LANDFILL GASES HAVE THE POTENTIAL TO CREATE HAZARDOUS CONDITIONS IF NOT CONTROLLED OR RECOGNIZED. INJURY OCCUR. ACCORDANCE WITH ASTM D1557 AT A MOISTURE CONTENT WITHIN 3 PERCENT OF OPTIMUM MOISTURE CONTENT. THE <br /> SOME OF THE HAZARDS INCLUDE: CONTRACTOR SHALL DEVELOP AND USE COMPACTION METHODS THAT PRODUCE THE REQUIRED COMPACTION. <br /> 3. FREQUENCY AND TYPES OF AIR MONITORING, PERSONNEL MONITORING, AND ENVIRONMENTAL SAMPLING TECHNIQUES AND <br /> 1. FIRES THAT MAY START SPONTANEOUSLY FROM EXPOSED AND/OR DECOMPOSING REFUSE. INSTRUMENTATION TO BE USED, INCLUDING METHODS OF MAINTENANCE AND CALIBRATION OF MONITORING AND SAMPLING 3. DURING PLACEMENT AND SPREADING, CONTROL OF MOISTURE CONTENT AND COMPACTION OF STRUCTURAL FILL SHALL BE THE <br /> EQUIPMENT TO BE USED. CONTRACTOR'S RESPONSIBILITY. CEMENT-AMENDMENT IS ONE METHOD OF IMPROVING THE SOIL MOISTURE CONTENT SO THAT <br /> 2. FIRES AND EXPLOSIONS THAT MAY OCCUR FROM THE PRESENCE OF METHANE GAS. IT CAN BE COMPACTED. <br /> 4. PERSONAL PROTECTIVE EQUIPMENT TO BE USED BY EMPLOYEES FOR EACH OF THE SITE TASKS AND OPERATIONS AND CRITERIA <br /> 3. LANDFILL GASES AND OTHER TRACE GASES THAT MAY HAVE TOXIC EFFECTS OR CREATE AN OXYGEN DEFICIENCY IN FOR UPGRADING LEVEL OF WORKER PROTECTION FROM LEVEL D TO LEVELS C AND B. 4. PROVIDE A SMOOTH SOIL SURFACE ON THE FINAL LIFT PRIOR TO PLACEMENT OF OTHER MATERIALS. <br /> TRENCHES, VAULTS, CONDUITS, AND STRUCTURES. <br /> 5. A LIST OF SAFETY AND MONITORING EQUIPMENT AT THE JOB SITE AND LOCATIONS WHERE EQUIPMENT IS STORED OR GRADING: <br /> 4. HYDROGEN SULFIDE, A HIGHLY TOXIC AND FLAMMABLE GAS, WHICH MAY BE PRESENT. MAINTAINED. <br /> 3 1. CONTRACTOR SHALL MAINTAIN STOCKPILING ACTIVITIES BOTH DURING AND POST-GRADING TO PREVENT PONDING. <br /> 5. EXPOSURE TO LEACHATE IS POTENTIALLY HAZARDOUS TO HUMAN HEALTH BECAUSE OF TOXIC AND/OR CARCINOGENIC 6. AN EMERGENCY EVACUATION PLAN FOR IMMEDIATE REMOVAL TO A HOSPITAL OR A DOCTOR'S CARE ANY PERSON WHO MAY BE <br /> COMPOUNDS THAT MAY BE PRESENT IN THE LEACHATE. INJURED ON THE JOB SITE INCLUDING ROUTES TO MEDICAL TREATMENT, AND EMERGENCY TELEPHONE NUMBERS INCLUDING DISPOSAL OF GROUNDWATER: <br /> A. ALL IMPORTED SOILS WILL BE VISUALLY FIELD SCREENED FOR EVIDENCE OF CONTAMINANTS. ANY SUSPECT SOILS WILL HOSPITAL, AMBULANCE, FIRE, SHERIFF/POLICE, POISON CONTROL, THE ENGINEER, AND OTHERS AS DEEMED NECESSARY. <br /> °J BE SAMPLED FOR CHEMICAL ANALYSIS. ALL OTHER SOIL WILL BE SAMPLED FOR CHEMICAL ANALYSIS AT THE RATE OF 7. EMPLOYEE TRAINING ASSIGNMENTS. 1. S EXCAVATIONS OCCUR IN REFUSE, ALL WATER REMOVED FROM SAID EXCAVATIONS WILL BE CONSIDERED CONTAMINATED AND <br /> ONE COMPOSITE SAMPLE (COMPRISED OF FOUR DISCRETE GRAB SAMPLES) FOR EVERY 5,000 CUBIC YARDS IMPORTED. SHALL BE DISPOSED OF AT THE PRO WASTEWATER TREATMENT FACILITY (INEE DISCHARGE V THE WTF CAN BE VIA <br /> o ANALYSES WILL INCLUDE PETROLEUM HYDROCARBONS BY METHOD NWTPH-HCID (WITH FOLLOW UP AS NEEDED) AND 8. MEDICAL SURVEILLANCE REQUIREMENTS. DISCHARGE TO MANHOLES AT THE PROJECT SITE AS REVIEWED BY THE ENGINEER AND APPROVED BY THE CITY. ALL <br /> RCRA METALS BY METHOD EPA 601OD/602OB/200.7/200.8. ALL SOIL REMAINING ON SITE WILL MEET THE CRITERIA DISCHARGED WATER SHALL BE FREE OF SEDIMENT OR OTHER DEBRIS. CONTRACTOR TO COORDINATE DISCHARGE TO THE <br /> EXISTING LEACHATE SYSTEM OR SANITARY SEWER WITH THE CITY OF EVERETT. <br /> FOR LIMITED ACCESS PROPERTIES IN THE CURRENT DRAFT REVISIONS TO WAG 173-350 SOLID WASTE HANDLING 9. DECONTAMINATION PROCEDURES. <br /> o STANDARDS. 2. A DISCHARGE AUTHORIZATION PERMIT IS REQUIRED TO BE OBTAINED THROUGH THE CITY OF EVERETT OPERATIONS. CONTACT <br /> 10. CONFINED SPACE ENTRY PROCEDURES. BRIAN DOOLAN AT 425-257-8828 OR BDOOLAN®EVERETTWA.GOV. <br /> B. POTENTIAL IMPACTS OF SOIL STOCKPILING ON LANDFILL GAS MIGRATION WILL BE ADDRESSED BY THE CITY'S ONGOING <br /> LANDFILL GAS MONITORING PROGRAM, WHICH INCLUDES QUARTERLY SOIL GAS MONITORING AT AROUND 40 LANDFILL 11. A SPILL CONTAINMENT PROGRAM FOR HANDLING CONTAMINATED LIQUIDS. 3. ANY GROUNDWATER ENCOUNTERED ON THE LANDFILL SHALL BE CONSIDERED LEACHATE. CONTRACTOR TO COORDINATE <br /> GAS PROBE LOCATIONS. WITH THE RECENT COMPLETION OF THE SOUTHERNMOST LEG OF GAS EXTRACTION TRENCH, DISCHARGE TO THE EXISTING LEACHATE SYSTEM OR SANITARY SEWER WITH THE CITY OF EVERETT. SEDIMENT LADEN LIQUIDS <br /> THE LANDFILL AT THIS POINT IS ALMOST ENTIRELY SURROUNDED BY AN ACTIVE LANDFILL GAS EXTRACTION SYSTEM, 12. COPIES OF INDIVIDUAL 40-HOUR HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE TRAINING (HAZWOPER) AND AND SOLIDS MAY NOT BE DISCHARGED TO THESE SYSTEMS. <br /> WITH THE SOIL FILL AREA SURROUNDED ON ALL SIDES. MULTIPLE PRIOR ROUNDS OF SITE PRELOADING RESULTED IN 8-HOUR ANNUAL HAZWOPER REFRESHER CERTIFICATES FOR EVERY EMPLOYEE THAT IS TO WORK IN CONTACT WITH LANDFILL <br /> A FEW TEMPORARY CHANGES IN THE GAS MONITORING RESULTS, BUT DID NOT CAUSE ANY LONG TERM OFF-SITE GAS MATERIAL. TEMPORARY HAUL/ACCESS ROADS AND STAGING AREAS: <br /> REGULATORY EXCEEDANCES. THE MONITORING AND PRESENCE OF A LANDFILL GAS EXTRACTION SYSTEM COMPLETELY <br /> SURROUNDING THE FILL AREA SHOULD ADEQUATELY ADDRESS ANY CONCERNS FOR EFFORTS OF THE PRELOAD ON 13. DOCUMENTATION OF PARTICIPATION IN ONGOING RESPIRATORY PROTECTION PROGRAM, AS PER PART E OF WAG 296-G2, 1. PRIOR TO CONSTRUCTION OF THESE TEMPORARY IMPROVEMENTS, THE SUBGRADE SOILS SHALL BE COMPACTED TO A FIRM AND <br /> LANDFILL GAS. INCLUDING RESULTS OF FIT-TESTING CONDUCTED WITHIN THE PAST 6 MONTHS. UNYIELDING STATE, AS DETERMINED BY THE GEOTECHNICAL ENGINEER, THEN PROOF ROLLED USING A TANDEM AXEL DUMP <br /> THE CONTRACTOR SHALL COMPLY WITH HEALTH AND SAFETY RULES, REGULATIONS, ORDINANCES PROMULGATED BY THE CONTRACTOR SHALL INFORM ALL WORKERS AND THE PUBLIC VISITING THE SITE OF THE POTENTIAL FOR THE TRUCK, OR OTHER GEOTECHNICAL ENGINEER APPROVED EQUIPMENT, UNDER THE OBSERVATION OF THE GEOTECHNICALENGINEER. <br /> THE LOCAL, STATE, AND FEDERAL GOVERNMENT, THE VARIOUS CONSTRUCTION PERMITS, AND OTHER SECTIONS OF THE PRESENCE OF METHANE AND OTHER LANDFILL GASSES EMANATING FROM THE NATURAL DECOMPOSITION OF REFUSE <br /> CONTRACT DOCUMENTS. IN ADDITION TO COMPLYING WITH HEALTH AND SAFETY RULES, REGULATIONS, AND BURIED AT OR NEAR THE JOB SITE AND THE IMPORTANCE OF SAFETY PRECAUTIONS TO ENSURE THE SAFETY OF <br /> ORDINANCES PROMULGATED BY THE LOCAL, STATE, AND FEDERAL GOVERNMENT, THE VARIOUS CONSTRUCTION WORKERS AND THE PUBLIC. THE CONTRACTOR SHALL INSTRUCT ALL WORKERS AND MAINTAIN THE STRICT CONTROL OF 2 SOFT SPOTS OBSERVED SHALL BE EXCAVATED TO FIRM SOIL CONDITIONS OR TO A MAXIMUM DEPTH OF 24 INCHES AND HAVE <br /> o PERMITS, AND OTHER SECTIONS OF THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL INFORM ITS EMPLOYEES CONSTRUCTION ACTIVITY TO PROTECT AND MAINTAIN THE INTEGRITY OF THE CLOSED PORTION OF THE LANDFILL. MIRAFI® SOOX GEOTEXTILE FABRIC (OR APPROVED EQUIVALENT), PLACED AT THE BASE OF THE EXCAVATION AND THEN <br /> o AND SUBCONTRACTORS AND THEIR EMPLOYEES OF THE POTENTIAL DANGER IN WORKING ON AND NEAR SOLID WASTE BACKFILLED WITH STRUCTURAL FILL. <br /> m LANDFILLS. FAILURE ON THE PART OF THE CONTRACTOR TO FOLLOW THE SITE SAFETY AND HEALTH PLAN OR TO CONTINUE ANY 3. UPON COMPLETION OF REPAIRS, PROOF ROLLS SHALL BE PERFORMED IN REPAIRED AREAS. <br /> WORK IN AN UNSAFE MANNER MAY RESULT IN SUSPENSION OF THE WORK BY THE OWNER OR THE CITY OF EVERETT. <br /> m THE CONTRACTOR SHALL BE FAMILIAR WITH THE HEALTH AND SAFETY SECTION OF THE LANDFILL GAS FIELD PRACTICES 4. A MINIMUM OF 12 INCHES OF CRUSHED ROCK APPROVED BY THE GEOTECHNICAL ENGINEER SHALL BE PLACED ABOVE THE <br /> AND PROCEDURES AS PREPARED BY THE SOLID WASTE ASSOCIATION OF NORTH AMERICA (SWANA) NATIONAL LANDFILL SITE SAFETY AND HEALTH OFFICER: PREPARED SUBGRADES ABOVE A LAYER OF MIRAFI® 50OX GEOTEXTILE FABRIC (OR APPROVED EQUIVALENT) UNLESS PREVIOUS <br /> GAS COMMITTEE. THE MOST CURRENT VERSION OF THIS DOCUMENT IS DATED 2011. COPIES MAY BE OBTAINED SOFT SPOT REPAIR ALREADY NECESSITATED THE EARLIER USE OF THE GEOTEXTILE. <br /> a BY WRITING SWANA, 1100 WAYNE AVE, SUITE 600, SILVER SPRINGS, MARYLAND 20910, TELEPHONE 1-800-467-9262. THE CONTRACTOR SHALL PROVIDE A PERSON DESIGNATED AS THE SITE SAFETY AND HEALTH OFFICER, WHO IS <br /> i CONTRACTOR SHALL PERFORM WHATEVER WORK IS NECESSARY FOR SAFETY AND BE SOLELY AND COMPLETELY THOROUGHLY TRAINED IN RESCUE PROCEDURES, THE USE OF SAFETY EQUIPMENT AND GAS DETECTORS, AND THE 5. ADJACENT RESIDENTS' USE OF EXISTING NEIGHBORHOOD ACCESS ROAD HAS BEEN COORDINATED BETWEEN OWNER <br /> RESPONSIBLE FOR CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS (INCLUDING EMPLOYEES OF THE POTENTIAL HAZARDS THAT MAY BE PRESENT AT MUNICIPAL SOLID WASTE LANDFILLS. THE PERSON MUST BE PRESENT REPRESENTATIVE AND THE CITY. CONTRACTOR SHALL ABIDE BY AGREEMENT'S TERMS DURING CONSTRUCTION, INCLUDING BUT <br /> CITY, ENGINEER, ANY SITE VISITORS, AND CONTRACTOR) AND PROPERTY DURING THE CONTRACT PERIOD. THIS AT ALL TIMES WHILE WORK IS BEING PERFORMED AND IMPLEMENT THE WRITTEN SITE SAFETY AND HEALTH PLAN AND NOT LIMITED TO MAXIMUM WAIT TIMES FOR RESIDENTS AND/OR EMERGENCY PERSONNEL. <br /> REQUIREMENT APPLIES CONTINUOUSLY AND IS NOT LIMITED TO NORMAL WORKING HOURS. CONDUCT TESTING. <br /> THE ENGINEER'S REVIEW OF THE CONTRACTOR'S PERFORMANCE IS NOT INTENDED TO INCLUDE A REVIEW OR <br /> APPROVAL OF THE ADEQUACY OF THE CONTRACTOR'S SAFETY SUPERVISOR, THE SAFETY PROGRAM OR ANY SAFETY <br /> MEASURES TAKEN IN, ON, OR NEAR THE CONSTRUCTION SITE. THE CONTRACTOR SHALL PROVIDE FOR THE PROTECTION <br /> OF EMPLOYEES AND ALL OTHERS FROM FIRE, EXPLOSION, OR ASPHYXIATION CAUSED BY ANY GASES ENCOUNTERED <br /> DURING CONSTRUCTION AND LANDFILL LEACHATE EMITTED FROM, AND PRESENT WITHIN, THE EXISTING SOLID WASTE <br /> o LANDFILL. THE CONTRACTOR SHALL PROVIDE AT ALL TIMES PROPER FACILITIES FOR SAFE ACCESS TO THE WORK BY <br /> AUTHORIZED GOVERNMENT OFFICIALS. <br /> FIELD TRAILERS SHALL HAVE OPEN OR NO SKIRTING TO PREVENT LEG FROM INFILTRATING INTO THE STRUCTURE AND FLOOR <br /> ELEVATION SHALL BE 18" ABOVE GRADE TO BE IN AN "UNCLASSIFIED ZONE". IN ADDITION, THE CLEANUP ACTION PLAN <br /> STATES, "TEMPORARY ENCLOSURES ERECTED OVER PAVEMENT OR OPEN SPACE AREAS WILL CONTAIN CONTINUOUS MONITORS <br /> THAT WOULD ACTIVATE AN ALARM IF TRIGGERED." A PORTABLE MONITOR SHALL BE PLACED IN EACH CONSTRUCTION TRAILER <br /> WITH AN ALARM ACTIVATION AT 1000 RPM OF ANY FLAMMABLE GAS CONCENTRATION. <br /> TO PREVENT THE MIGRATION OF LANDFILL GAS OFF SITE THROUGH UTILITY CORRIDORS, ALL UTILITY TRENCHES SHALL BE <br /> BACKFILLED WITH IMPERMEABLE BACKFILL MATERIAL AS SHOWN IN THE DETAIL ON SHEET LF1. <br /> E <br /> M <br /> N <br /> I <br /> • N <br /> o of wAsyd4GJ�;_ Drawing N. <br /> Draws By Date SHELTER HOLDINGS, LLC <br /> �) PERTEET w P. HOUGHTALING B 15 19 NT2 <br /> Des1gned By EVERETT RIVERFRONT DEVELOPMENT <br /> V.WEN 8 15 19 Sheet No. <br /> 2707COLBYAVENUE,SUITE900 s4968 `� Checked B <br /> 0 or RF E� � y ADVANCED SITE WORK PERMIT <br /> o EVERETT,WA 98201 Know what's below. FSS/0Nq`TEE�G�� Approved By Pro,ect N�meer 4 28 <br /> No. Date Revision By Appr. <br /> 425.252.7700 800.615.9900 Call before you dig C. DONNER 8 15 19 20180004.005 NOTES nr Tntal <br />