My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3800 RIVERFRONT BLVD 2025-07-23
>
Address Records
>
RIVERFRONT BLVD
>
3800
>
3800 RIVERFRONT BLVD 2025-07-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2025 3:49:01 PM
Creation date
6/18/2025 10:18:28 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3800
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUMMARY OF PERMIT REPORT SUBMITTALS <br />Refer to the Special and General Conditions within this permit for additional submittal <br />requirements. Appendix A provides a list of definitions. Appendix B provides a list of acronyms. <br />Table 1: Summary of Required Submittals <br />Permit <br />Submittal <br />Frequency <br />First Submittal Date <br />Section <br />S5.A and <br />High Turbidity/Transparency Phone <br />As Necessary <br />Within 24 hours <br />S8 <br />Reporting <br />S5.B <br />Discharge Monitoring Report <br />Monthly* <br />Within 15 days following <br />the end of each month <br />S5.F and <br />Noncompliance Notification — <br />As necessary <br />Within 24-hours <br />S8 <br />Telephone Notification <br />S5.F <br />Noncompliance Notification — <br />As necessary <br />Within 5 Days of non - <br />Written Report <br />compliance <br />S9.0 <br />Request for Chemical Treatment <br />As necessary <br />Written approval from <br />Form <br />Ecology is required prior to <br />using chemical treatment <br />(with the exception of dry <br />ice or CO2 to adjust pH) <br />G2 <br />Notice of Change in Authorization <br />As necessary <br />G6 <br />Permit Application for Substantive <br />As necessary <br />Changes to the Discharge <br />G8 <br />Application for Permit Renewal <br />1/permit cycle <br />No later than 180 days <br />before expiration <br />G9 <br />Notice of Permit Transfer <br />As necessary <br />G20 <br />Notice of Planned Changes <br />As necessary <br />G22 <br />Reporting Anticipated Non- <br />As necessary <br />compliance <br />SPECIAL NOTE: *Permittees must submit electronic Discharge Monitoring Reports (DMRs) to the Washington <br />State Department of Ecology monthly, regardless of site discharge, for the full duration of permit coverage. Refer to <br />Section S5.13 of this General Permit for more specific information regarding DMRs. <br />Table 2: Summary of Required On -site Documentation <br />Document Title <br />Permit Conditions <br />Permit Coverage Letter <br />See Conditions S2, S5 <br />Construction Stormwater General Permit <br />See Conditions S2, S5 <br />Site Log Book <br />See Conditions S4, S5 <br />Stormwater Pollution Prevention Plan (SWPPP) <br />See Conditions S9, S5 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />J <br />1 <br />1 <br />1 <br />L <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.