Laserfiche WebLink
SEC. 2 , T.f' 29i N, R. 5 E, W.M. TR1 TR2 <br /> SEC. 3FI„ T. � 29! N, �. 5 E, W.M. <br /> N F- a P <br /> + U) a D D 0 0 <br /> M <br /> Q <br /> O <br /> Q II li 1- o <br /> 00 Q e Q, a o <br /> M o• 6 a <br /> N 30 00 <br /> E 31 o0 d <br /> z 40' o <br /> STA 29+32 (10.0' RT <br /> O AP 00 M p <br /> Z STA 33+93 22.6' T 4 <br /> J v PC D Q <br /> 3 STA 31+54 10.0' Rr N 33 00 I G <br /> AP 4p 40, I R-10 it KEY MAP <br /> Ld <br /> j NTS <br /> oLLJ EXISTING 1 40, <br /> (n CONSTRUCTION 8 STA 34+02 22.6' LT <br /> o ACCESS ROAD R=40' oo PG b CONSTRUCTION NOTES <br /> --- R-zs <br /> 2 D)--- --- YI-- ❑ Oj REMOVE EXISTING SETTLEMENT PLATE AND MONITOR ROD. <br /> o - --- M COORDINATE WITH GEOTECHNICAL ENGINEER AND OWNER. <br /> .. - + <br /> E _ _ ___ _ <br /> ---_, - O UTILITY RELOCATED BY OTHERS. <br /> m _ <br /> a -_ M1 <br /> PROPOSED APPROXIMATE ------ _ I. JI <br /> o' (A RIVERFRONT FUTURE CRANE STA 32+74 10.0' RT ---- O INSTALL CHAIN LINK FENCE. <br /> FOUNDATION N:356704.39 - _ <br /> BOULEVARD AP _ O INSTALL CHAIN LINK GATE. <br /> ® LOCATION E:1307510.09 4 3 I =}fs� <br /> Z MATCH TO EXISTING 1 s� <br /> a x_x ACCESSUROAD I` 0-4 �! G LEGEND <br /> XLION <br /> -X_X N:356753.59 TEMPORARY HAUL ROAD. 12" CSBC OVER LAYER <br /> E1307515.74 I OF MIRAFI® 50OX GEOTEXTILE FABRIC (OR <br /> q APPROVED EQUIVALENT. SEE SHEET TR1 FOR <br /> N TYPICAL SECTION. <br /> � X <br /> RIVERFRONT BO1jLEV <br /> � X <br /> ARD GENERAL NOTES <br /> 1. BUILDING LAYOUTS AND RIVERFRONT BOULEVARD ARE PRELIMINARY AND <br /> ARE SHOWN FOR INFORMATIONAL PURPOSES ONLY. <br /> - <br /> X <br /> TEMPORARY HAUL/ACCESS ROADS AND STAGING <br /> �X AREAS: <br /> 1. PRIOR TO CONSTRUCTION OF THESE TEMPORARY IMPROVEMENTS, THE <br /> o X X X SUBGRADE SOILS SHALL BE COMPACTED TO A FIRM AND UNYIELDING <br /> �x_X STATE, AS DETERMINED BY THE GEOTECHNICAL ENGINEER, THEN PROOF <br /> '� ROLLED USING A TANDEM AXEL DUMP TRUCK, OR OTHER GEOTECHNICAL <br /> ENGINEER APPROVED EQUIPMENT, UNDER THE OBSERVATION OF THE <br /> X�X GEOTECHNICAL ENGINEER. <br /> 2. SOFT SPOTS OBSERVED SHALL BE EXCAVATED TO FIRM SOIL <br /> APPROX. �+ I CONDITIONS OR TO A MAXIMUM DEPTH OF 24 INCHES AND HAVE <br /> EXISTING MIRAFI® 50OX GEOTEXTILE FABRIC (OR APPROVED EQUIVALENT) PLACED <br /> NEIGHBORHOOD �+ AT THE BASE OF THE EXCAVATION AND THEN BACKFILLED WITH <br /> ACCESS ROAD " STRUCTURAL FILL. <br /> 3. UPON COMPLETION OF REPAIRS, PROOF ROLLS SHALL BE PERFORMED <br /> x I IN REPAIRED AREAS. <br /> �I <br /> " 4. A MINIMUM OF 12 INCHES OF CRUSHED ROCK APPROVED BY THE <br /> GEOTECHNICAL ENGINEER SHALL BE PLACED ABOVE THE PREPARED <br /> o .I SUBGRADES ABOVE A LAYER OF MIRAFI® 50OX GEOTEXTILE FABRIC (OR <br /> I APPROVED EQUIVALENT) UNLESS PREVIOUS SOFT SPOT REPAIR ALREADY <br /> 1 NECESSITATED THE EARLIER USE OF THE GEOTEXTILE. <br /> j III 5. STRUCTURAL FILL FOR TEMPORARY HAUL/ACCESS ROADS AND STAGING <br /> AREAS SHALL BE COMPACTED TO MINIMUM 95% MODIFIED PROCTOR. <br /> i I 6. EXISTING ACCESS ROAD AND GATE ACCESS SHALL BE MAINTAINED <br /> TEMPORARY HAUL ROAD CONSTRUCTION CENTERLINE DATA j I UNLESS AN ALTERNATIVE ACCESS IS APPROVED BY THE CITY, AND THE <br /> OWNER REPRESENTATIVE. <br /> SEGMENT NO. START END BEGIN BEGIN END END DELTA RADIUS TANGENT LENGTH <br /> STATION STATION NORTHING EASTING NORTHING EASTING I HORIZONTAL DATUM: <br /> I <br /> ' L7 28+09.91 30+33.23 35615Z39 1307345.49 356379.13 1307372.02 223.32' 1 i G HORIZONTAL DATUM FOR THIS SURVEY IS NAD 83/91 PER CITY OF <br /> EVERETT. CITY OF EVERETT CONTROL POINT NO. 703-58-04 WAS HELD <br /> L8 30+33.23 33+63.51 356379.13 1307372.02 356698.93 1307454.57 330.28' xFOR POSITION, AND A LINE BETWEEN SAID POINT NO. 703-58-04 AND <br /> CONTROL POINT NO. INCA-9 WAS HELD FOR ROTATION, BEING NORTH <br /> i C8 33+63.51 34+31.98 356698.93 1307454.57 356736.36 1307505.54 78' 27' 18" 50.00' 40.82' 68.47' I, II 00'28'11" EAST. <br /> 3 ® TEMPORARY I VERTICAL DATUM: <br /> TRAP DIMACCESS i s-: " ----------------------------------- NAVD88 <br /> ROAD> C)'111 <br /> x\ I 1l I s - <br /> N <br /> g<� I O Iss <br /> N <br /> % I / SCALE <br /> u <br /> a <br /> N� 0 D 40 80 <br /> W/� FEET <br /> 0 1 10/22/19 ADDENDUM #1 - SEWER LINE ADDITION AND SITE LAYOUT REVISION G�oF WASNdtiC D-ing N. <br /> Dro- By ❑ate SHELTER HOLDINGS, LLC <br /> �) PERTEET m P. HOLIGHTALING B ,5 ,9 TR3 <br /> Deei9ned By EVERETT RIVERFRONT DEVELOPMENT <br /> V.WEN 8 15 19 ShZf <br /> 2707 COLBY AVENUE,SUITE 900 s4968 `� Checked B <br /> o�RF o ADVANCED SITE WORK PERMIT <br /> o EVERETT,WA 98201 Know what's below. F�S�pNA�TEENG\� Approved By Project Numbe, <br /> No. Date Revision By Appr. <br /> 425.252.7700 800.615.9900 C811 before you dig C. DONNER e ,5 ,9 20180004.005 TEMPORARY HAUL ROAD PLAN tnl <br />