My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
202 ALDER ST 2025-08-25
>
Address Records
>
ALDER ST
>
202
>
202 ALDER ST 2025-08-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 7:58:10 AM
Creation date
6/18/2025 10:59:23 AM
Metadata
Fields
Template:
Address Document
Street Name
ALDER ST
Street Number
202
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed View Ridge Subsurface Exploration, Geologic Hazards, Infiltration Potential, <br /> Elementary School Replacement and Preliminary Geotechnical Engineering Report <br /> Everett, Washington Preliminary Design Recommendations <br /> soils and the recommended wall backfill materials, we recommend a seismic surcharge <br /> pressure of 5H and 10H psf, where H is the wall height in feet for the "active" and "at-rest" <br /> loading conditions, respectively. The seismic surcharge should be modeled as a rectangular <br /> distribution with the resultant applied at the midpoint of the walls. <br /> The lateral pressures presented above are based on the conditions of a uniform backfill <br /> consisting of excavated on-site soils, or imported structural fill compacted to 90 percent of <br /> ASTM:D 1557. A higher degree of compaction is not recommended, as this will increase the <br /> pressure acting on the walls. A lower compaction may result in settlement of the slab-on-grade <br /> or other structures supported above the walls. Thus, the compaction level is critical and must <br /> be tested by our firm during placement. Surcharges from adjacent footings or heavy <br /> construction equipment must be added to the above values. Perimeter footing drains should be <br /> provided for all retaining walls, as discussed under the "Drainage Considerations" section of <br /> this report. <br /> It is imperative that proper drainage be provided so that hydrostatic pressures do not develop <br /> against the walls. This would involve installation of a minimum 1-foot-wide blanket drain to <br /> within 1 foot of finish grade for the full wall height using imported, washed gravel against <br /> the walls. The blanket drain should be continuous with and freely communicate with the <br /> footing drain. <br /> 13.1 Passive Resistance and Friction Factors <br /> Lateral loads can be resisted by friction between the foundation and the natural glacial soils or <br /> supporting structural fill soils, and by passive earth pressure acting on the buried portions of <br /> the foundations. The foundations must be backfilled with structural fill and compacted to at <br /> least 95 percent of the maximum dry density to achieve the passive resistance provided below. <br /> We recommend the following allowable design parameters: <br /> • Passive equivalent fluid = 250 pcf <br /> • Coefficient of friction = 0.30 <br /> 14.0 PAVEMENT RECOMMENDATIONS <br /> Pavement areas should be prepared in accordance with the "Site Preparation" section of this <br /> report. If the stripped native soil or existing fill pavement subgrade can be compacted to <br /> 95 percent of ASTM:D 1557 and is firm and unyielding, no additional overexcavation is <br /> required. Soft or yielding areas should be overexcavated to provide a suitable subgrade and <br /> backfilled with structural fill. <br /> September 22, 2010 ASSOCIATED EARTH SCIENCES, INC. <br /> BWG/tb-KE100255A2-Projects1201002551KEIWP Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.