Laserfiche WebLink
2022 Stormwater System Development Fee Calculations <br /> Permit#: B2307-058 Additional Notes: <br /> Project Address: 202 Alder ST Stormwater system development fees split on two separate permits:ground hard surfaces <br /> Project Name: Site Work for(3)NEW PORTABLES W/FOUNDATION,RAMP,&LANDING calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: Everett Prepared By: Thad Newport Date: 8/10/2023 <br /> Outside City Limits? No *Adds a 25%Surcharge <br /> Supportive Housing Credit? No *Reduces by 80% Reviewed By: Date: _ <br /> Fee Calculations: <br /> Stormwater System Development Fees: <br /> Permit#: B2307-058 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 2,660 SF <br /> Stormwater System Dev Fee: $712.35 Add this fee to the Building Permit for roof area hard surfaces. <br /> Stormwater System Development Fees: <br /> Permit#: PWXXXX-XXX Type of Construction: Existing Development Adding New+Replaced Hard Surfaces_ <br /> Square Feet of New Plus Replaced Hard Surfaces: - SF <br /> Stormwater System Dev Fee: $0.00 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />