Laserfiche WebLink
Intake & Approval Sheet (FOR PERMIT STAFF ONL19 <br />PERMIT# LW P I t o-004 <br />BUILDING <br />Intake OK bys Date: O428 l <br />Intake Comments: <br />❑ Route to Commercial Building <br />Rout 'Iding <br />Make this a "W" Permit <br />4100. ,d00: 3/0 <br />Garage/ ct. Size <br />W,14 <br />Number of Stories <br />Z <br />Basement <br />❑No UYes, Fin / nfi <br />Type of Construction <br />VA <br />Occupancy Group <br />%[- <br />Occupancy Load <br />Fire Sprinklers: ❑Update EAsting ❑New System ®Not Req'd <br />Reason Sprinklers Required: <br />Fire Alarm: ❑ Update Existing ❑New System TO Not Req'd <br />Reason Fire Alarm Required: <br />RCW 64.55 MF worksheet req'd for permit? ❑Yes L9 No <br />Add1 RCW 64.55 dots required prior to final? ❑Yes FkNo <br />VALUATION CALCULATION: Total $ 5F ,rw, DV <br />toox SO = TV00 <br />3/O x 12 1 = 3 7 So 0 <br />421 S� <br />Additional Notes: <br />Approved By Date: pq Z'/LpZo <br />M <br />FIRE DEPARTMENT <br />Separate / Deferred Submittals Required:;- <br />❑ Fire Sprinklers ❑Fire Alarm ❑Other: <br />Additional Notes: <br />Fire Dept. Fees; <br />❑ Review of As-Buil/Plan- FIRE FEE <br />❑Minimal orNo FirFIREFEE <br />❑Review/ InspectioDD FIRE FEE <br />Approved By: Date: <br />ELECTRICAL <br />Additional Notes: <br />Approved By: Date: <br />PLANNING <br />Intake OK by: Assign To: Date: 10. Z,3 q <br />Intake Comments: <br />❑ Attach to Project No. <br />❑ Route to Historic Reviewer <br />OK to Route to Other Departments <br />❑ Hold in Planning File Drawer <br />Zone <br />Overlay/Agreement <br />Nonresidential Use <br />Residential Use <br />Proposed No. of Dwelling Units: <br />Total No. of Dwelling Units: <br />Planning/Landscape Inspection Required before Final? ❑Yes WNo <br />"In Lieu" Fee: Type: Amou <br />School Impact Fee: Total $ <br />Calculated: Cre <br />El Everett School Dist ❑Mukilt School Dist <br />Additional Notes: �J� 4 r� — M �* p� <br />`��/ .Qoflvw�— <br />Approved By: K,De-Awl Date: <br />PUBLIC WORKS <br />Intake OK by: �Ir Date: _ 0 _3 _ <br />Intake Comments: iz 2PIN Worksheet Needed if., <br />Da*Or �Ff '� 61'N�Sss�ev Eval ❑Traffic Mit Eval <br />S�yi,' SestSite Work or Drainage Proposed <br />I <br />took 04 .�1 IL P"r k 1 ElBackflow Prevention for high hazard: <br />81r r%jfy - :(dental, medical, animals, mortuary, hospital, <br />"� <br />,supportive housing) <br />Xoute this folder for PW Review at end — PW Review Worksheet <br />IatThiss,,//project also has a separate concurrent PW Review (Green Folder) <br />NI AND Create Green Folder ❑Submitted Previously ❑Deferred <br />PW­Ehis Permit is Approved by Public Works <br />❑ See PW Review Worksheet and associated attached items <br />❑ A Separate PW Permit is Required (Permit #: PW ) <br />AND ❑ Is located in this folder <br />❑ Is in a Separate Green Folder (loin with this folder for permit issuance) <br />❑ Will be issued separately (Separate Green Folder, PW issued ahead of Bldg) <br />❑ Public Works has no scope — PW Not Required <br />Additional Notes: Sc6gc �.EV•6H-v .o Kn L,"6,E.u_,4[Co <br />Approved <br />42, <br />