My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10621 ROSEWOOD AVE 2025-06-26
>
Address Records
>
ROSEWOOD AVE
>
10621
>
10621 ROSEWOOD AVE 2025-06-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2025 11:44:11 AM
Creation date
6/18/2025 2:52:16 PM
Metadata
Fields
Template:
Address Document
Street Name
ROSEWOOD AVE
Street Number
10621
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IIIIIII� <br />EVERETT <br />WASHINGTON <br />OWNER NAME AND ADDRESS: <br />DEMYANCHUK LARISA <br />11003 6TH AVE W <br />EVERETT, WA 98204-3843 <br />PHONE: <br />PUBS � WORKS PERMIT I Date Applied: 8/17/2023 <br />City of Everett Permit Services Public Works Permit#: PW2308-020 <br />3200 Cedar Street, 20' Floor Associated Bldg Permit #: B2308-032 <br />Everett, WA 98201 Planning Reference #: <br />everettwa.gov/permits Public Works Fee: $863.00 <br />PermitServices(o)everettwa.eov Schedule Inspections at: onlinepermits.everettwa.zov <br />APPLICANT NAME AND ADDRESS: <br />PAUL KAKHOTSKIY <br />PHONE: 4253990333 <br />SITE ADDRESS: 10621 ROSEWOOD AVE TAX PARCEL ID #: 00552300301705 <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />DESCRIPTION: SITEWORK FOR 2-STORY SFR WITH ATTACHED GARAGE <br />NOTES: <br />PERMIT CONDITIONS: <br />1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov. Available inspection dates are shown in the <br />dropdown menu. <br />2. All work shall be performed in accordance with the permit and current City of Everett 'Design and Construction Standards and <br />Specifications for Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department. Approved plans must remain on job -site <br />at all times. <br />5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at onlinepermits.everettwa.govto <br />formally request all required inspections. <br />6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector and the approved <br />SWPPP/TESC Plan. Remove upon completion of the project prior to final approval of the permit. <br />7. Keep City streets clean at all times. No dirt, mud, rocks, or debr+s to be tracked onto roadway. <br />8. Protect all existing underground utilities during construction. <br />9. Any damage to City improvements (sidewalk, curb, roadway, etc.) shall be replaced per City Standards and/or as directed by the City PW <br />Inspector. <br />10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed on - <br />site in a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or easements and the <br />improvements located therein. <br />11. Prior to any interruption to the public right-of-way (roadways, parking lanes, or sidewalks) a Traffic Street Use permit shall be obtained <br />from the City's Traffic Engineering Division. This permit can be applied for online at onlinepermits.everettwa.gov and requires a traffic <br />control plan to be submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of <br />application. <br />12. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br />selecting PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have <br />been completed. <br />13. All work constructed within the public right-of-way must be removed or relocated at the owner's expense if the City ever requires use of <br />the right-of-way for municipal purposes. <br />PERMIT FEE BREAKDOWN: <br />ErosionControl......................................................................$50.00 <br />Grade/Fill/Excavate (10 CY)...................................................$25.00 <br />Paving (1772 SF)....................................................................$45.00 <br />Misc. Minor Permits (Drainage Work)...................................$25.00 <br />PWPlan Review.....................................................................$20.00 <br />PW Site Inspection................................................................$20.00 <br />Stormwater System Development Fee (1772 SF)................$678.00 <br />DNOV 21 2023 <br />CITX OF EVEPETT <br />Permit Services <br />Page 1 of 2 <br />APPLICANT/JOB SITE COPY ✓ADDRESS FILE _TREASURER <br />
The URL can be used to link to this page
Your browser does not support the video tag.