Laserfiche WebLink
�D I G I L I T E Project Name: <br /> Fixture Schedule: <br /> Q 2.Conduit mounting: <br /> B <br /> 9 <br /> • ® • <br /> B B <br /> Step 1:Loosen screws and remove the front lens set carefully from Step 2:Drill out the holes(B)to secure it on the wall by choosing <br /> the back plate.Then remove 1/2"plug from where you proper screws. <br /> intend to feed conduit. <br /> ® o Tv <br /> • <br /> 0 <br /> �4 <br /> OC <br /> ® 11 <br /> O as O T <br /> • <br /> Black Line <br /> White Neutral <br /> Green Ground <br /> Step 3:Finish wiring(Black for Line,White for Neutral and Green wire Step 4:Replace the lens set on the hinge and finish connection,close <br /> for Ground). the lens set and tighten the screws to fasten the lens set to the <br /> back plate. <br /> DIGILITE :11info@DigiLiteLED.com <br />