Laserfiche WebLink
PUBLIC WORKS PERMIT <br />City of Everett Permit Services <br />E V E R E T T 3200EveCedar <br />rett, WA 98201 Floor <br />WAS H I N GTO N everettwa.gov/permits <br />PermitServices@everettwa.gov <br />OWNER NAME AND ADDRESS: <br />COMMUNITY TRANSIT <br />7100 HARDESON RD <br />EVERETT, WA 98203 <br />PHONE: 4253671972 <br />SITE ADDRESS: 2501 W CASINO RD <br />Date Applied: 8/30/2022 <br />Public Works Permit #: PW2208-019 <br />Associated Bldg Permit #: B2207-004 <br />Planning Reference #: REV122-100 <br />Public Works Fee: $765.00 <br />Schedule Inspections at: onlinepermits.everettwa.gov <br />APPLICANT NAME AND ADDRESS: <br />MATT COVERT <br />PHONE: 4258929574 <br />TAX PARCEL ID #:28041400201800 <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />DESCRIPTION: EARLY CLEARING AND GRADING FOR PROPOSED VEHICLE STORAGE & TR <br />PERMIT CONDITIONS: <br />1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov. Available inspection dates are shown in the dropdown menu. <br />2. All work shall be performed in accordance with the permit and current City of Everett `Design and Construction Standards and Specifications for <br />Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site Civil Work to be done per plans and drainage report approved by the City of Everett Public Works Department dated 08/30/2022. Approved <br />plans must remain on job -site at all times. <br />5. It is the applicant/contractor's responsibility to ensure coverage under Ecology's Construction Stormwater General Permit is obtained and <br />maintained throughout the entire construction duration. <br />6. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br />required inspections. An Inspection Handout is provided at permit issuance with instructions on how to request an inspection online. <br />7. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector and the approved <br />SWPPP/TESC Plan. Remove upon completion of the project prior to final approval of the permit. <br />8. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br />9. Protect all existing underground utilities (to remain) during construction. <br />10. All excavated material shall be hauled to an approved, permitted site. <br />11. Prior to any interruption to the public right-of-way (roadways, parking lanes, or sidewalks) a haul route will be required to be submitted to the <br />City of Everett prior to permit issuance. Contact the Traffic Engineering Department for Street Use Permits and any required Oversize Load Permits <br />at 425-257-8810 (press Option 7 for Traffic). <br />12. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by selecting PW <br />25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests when all items have been completed for this permit. <br />Public Works Permit Fee Breakdown: <br />Erosion Control .................................................. $200.00 <br />Grade/Fill/Excavate(20150CY)...........................$525.00 <br />PW Plan Review....................................................$20.00 <br />PW Site Inspection...............................................$20.00 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />By purchasing this permit and commencing work, the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and all <br />claims for damages, costs, expenses, or causes of action that may arise because of installation and maintenance of the improvement or other right- <br />of-way use here to applied for and further agrees to remove same upon notice from the City and to replace public property damaged thereby. <br />VALIDITY/EXPIRATION: <br />Work authorized by this permit must be started within 180 days of date permit is issued and thereafter is to be diligently pursued to completion. This <br />permit may be cancelled by the city upon any stoppage of work on this project over 180-day duration. Each inspection extends the expiration date <br />180 days to keep the permit open while work is active <br />Page 1 of 1 <br />APPLICANT/JOB SITE COPY ___TREASURER __ADDRESS FILE <br />