My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1802 LOMBARD AVE 2025-07-14
>
Address Records
>
LOMBARD AVE
>
1802
>
1802 LOMBARD AVE 2025-07-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2025 9:27:47 AM
Creation date
6/20/2025 2:37:28 PM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
1802
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2501-242 Description: RUN 100 AMP POWER TO 100 AMP PANEL IN GARAGE&4 <br /> BREAKERS <br /> Applied: 1/30/2025 Approved: 1/30/2025 Site Address: 1802 LOMBARD AVE <br /> Issued: 1/30/2025 Finaled: 2/5/2025 City,State Zip Code: EVERETT,WA 98201-2326 <br /> Status: FINALED Applicant: LICHNECKERT GREGORY&BARBARA <br /> Parent Permit: Owner: LICHNECKERT GREGORY&BARBARA <br /> Parent Project: Contractor: OWNER <br /> Details: <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 2/5/2025 MICHAEL APPRVD-PERMIT <br /> 2/5/2025 ELEC 05 SERVICE** WICKLANDER FINAL eTRAKiT Inspection Request <br /> Notes: <br /> 2/4/2025 8:47 AM Barbara Lichneckert <br /> Contact Name: Barbara Lichneckert <br /> Site Address:1802 LOMBARD AVE <br /> Phone:4259237208 <br /> e-Mail: blichneckert@gmail.com <br /> Approve some feed to new 100 amp panel in garage proper wire size GFCI protection on all receptacles and two ground rods were installed. <br /> I_ <br /> Printed: Friday, 20 June, 2025 1 of 1 F� <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.