<br /> BASIC SOIL AMENDMENT NOTES
<br /> 0
<br /> 4 - SOIL RETENTION. RETAIN, IN AN UNDISTURBED STATE, THE DUFF LAYER AND NATIVE TOPSOIL TO THE MAXIMUM EXTENT
<br /> 34 PRACTICABLE. IN
<br /> �. ANY AREAS REQUIRING GRADING REMOVE AND STOCKPILE THE DUFF LAYER AND TOPSOIL ON SITE IN A DESIGNATED CONTROLLED AREA,
<br /> NOT ADJACENT 0 PUBLIC RESOURCES AND CRITICAL ARE 0 BE REAPPLIED TO 0 0 NS OF THE SITE WHERE FEASIBLE.
<br /> _ AS T OTHER P RTIO E FE
<br /> _ NTT RESO S TT
<br /> SOIL QUALITY. ALL AREAS SUBJECT TO CLEARING AND GRADING THAT HAVE NOT BEEN COVERED BY IMPERVIOUS SURFACE, INCORPORATE
<br /> INTO A DRAINAGE FACILITY OR ENGINEERED AS.STRUCTURAL FILL OR SLOPE SHALL, AT PROJECT COMPLETION, DEMONSTRATE THE
<br /> \ --------�4`� _ l\ a aaa
<br /> FOLLOWING:
<br /> 4
<br /> f76' �\ ` �"� y\ 1. A TOPSOIL LAYER WITH A MINIMUM ORGANIC MATTER CONTENT C 10%DRY WEIGHT IN PLANTING BEDS, AND E ORGANIC MATTER
<br /> CONTENT IN TURF AREAS, AND A PH FROM 6.0 TO 8.0 OR MATCHING THE PH OF THE UNDISTURBED SOIL. THE TOPSOIL LAYER SHALL
<br /> HAVE A MINIMUM DEPTH OF EIGHT INCHES EXCEPT WHERE TREE ROOTS LIMIT THE DEPTH OF INCORPORATION OF AMENDMENTS NEEDED .Y M
<br /> TO MEET THE CRITERIA. SUBSOILS BELOW THE TOPSOIL LAYER SHOULD BE SCARIFIED AT LEAST 4 INCHES WITH SOME INCORPORATION y4.e:1 8.0���
<br /> OF THE UPPER MATERIAL TO AVOID STRATIFIED LAYERS, WHERE FEASIBLE.
<br /> '--' -2. MULCH PLANTING BEDS WITH 2 INCHES OF.ORGANIC MATERIAL`,-._- - ~� 3. USE COMPOST AND OTHER MATERIALS THAT MEET THESE ORGANIC CO REQUIREMENTS:
<br /> COMPOST MEETING THE COMPOST
<br /> O. THE ORGANIC CONTENT FOR 'PRE-APPROVED" RATES CAN BE MET ONLY USING p,••:;_,
<br /> SPECIFICATION FOR BMP T7.30: BIORETENTION CELLS, SWALES, AND PLANTER BOXES (P.959), WITH THE EXCEPTION THAT THE OR MANURE. THE COMPOST dS0 Plsp
<br /> COMPOST MAY HAVE UP TO 35%BIOSOLIDS MUST ALSO HAVE AN ORGANIC MATTER CONTENT OF 40%TO
<br /> Ek.FLOW \ \ \ BMP T101: PRE�VING \ -i` 657, AND A CARBON TO NITROGEN RATIO BELOW 25:1. THE CARBON TO NITROGEN RATIO MAY BE AS HIGH AS 35:1 FOR PLANTINGS
<br /> gyp)\ \\ \NATURAL VEGETATI -o\ -
<br /> i COMPOSED ENTIRELY OF PLANTS NATIVE TO THE PUGET SOUND LOWLANDS REGION.
<br /> `� \ I+ b. CALCULATED AMENDMENT RATES MAY 8E MET THROUGH USE OF COMPOSTED MATERIAL MEETING (A.) ABOVE; OR OTHER ORGANIC
<br /> \ \\ \ \\ MATERIALS AMENDED TO MEET THE CARBON TO NITROGEN RATIO REQUIREMENTS, AND NOT EXCEEDING THE CONTAMINANT LIMITS
<br /> \ PROP.SPR \ \ \
<br /> \ (2.014-.SF), \ \ \ �,r� �� - IDENTIFIED IN TABLE 220—B, TESTING PARAMETERS, IN WAC 173-350-220.
<br /> SPLASH
<br /> \ \ THE RESULTING SOIL SHOULD BE CONDUCIVE TO THE TYPE OF VEGETATION TO BE ESTABLISHED.
<br /> t \\ BLOCKS(TYP.) \ \ \\ \ , \' \ - rn
<br /> IMPLEMENTATION OPTIONS: THE SOIL QUALITY DESIGN GUIDELINES LISTED ABOVE CAN BE MET BY USING ONE OF THE METHODS LISTED V
<br /> BELOW: 7
<br /> 1. LEAVE UNDISTURBED NATIVE VEGETATION AND SOIL, AND PROTECT FROM COMPACTION DURING CONSTRUCTION. Q Z
<br /> 2. AMEND EXISTING SITE TOPSOIL OR SUBSOIL EITHER AT DEFAULT 'PRE-APPROVED°RATES, OR AT CUSTOM CALCULATED RATES BASED Z
<br /> J \ \\ \ ON TESTS OF THE SOIL AND AMENDMENT.
<br /> \ 1 AND REPLACE PRIOR TO PLANTING. STOCKPILED TOPSOIL MUST ALSO AMENDED
<br /> AREA �, j IF NEEDED TO MEET.THE ORGANIC MATTER OR 3. STOCKPILE EXISTING TOPSOIL DURING GRADING,DEPTH REQUIREMENTS,
<br /> AENTS, EITHER AT A DEFAULT 'PRE-APPROVED°RATE OR AT A CUSTOM
<br /> J \ \ \5.013 13 SIF sF ;V� 1 CALCULATED RATE.
<br /> 1j 1 ^ !1 \ \ \ 1 4. IMPORT TOPSOIL MIX OF SUFFICIENT ORGANIC CONTENT AND DEPTH TO MEET THE REQUIREMENTS.
<br /> TOOSOIL --.._- 1
<br /> _ MORE THAN ONE METHOD MAY REUSED ON DIFFERENT PORTIONS OF THE SAME SITE. SOIL THAT ALREADY MEETS THE DEPTH AND
<br /> t ORGANIC MATTER QUALITY STANDARDS, AND IS NOT COMPACTED, DOES NOT NEED TO BE AMENDED.
<br /> t
<br /> \ ❑ AREA B
<br /> AREA A UNCOMPACTED, UNGRADED,
<br /> STOCKPILE.AND
<br /> �``F>X.SFR '`r.. UNDISTURBED
<br /> ' I i A AMEND SOIL IF
<br /> 00
<br /> (TWO 1 NECESSARY"OPTION 3"
<br /> y��/ ti LLI o 0
<br /> 00 V
<br /> NOTES w rn M of
<br /> f 1 O o R N FcC JOF O j�N
<br /> tr c,1 cm
<br /> PWA 11 , A AAWIN6:01.R P FCA D [
<br /> JPROP.
<br /> UJI
<br /> CONE.D/W. WW
<br /> (11253 SF)�
<br /> �...w
<br /> \\ Ap15 3 STA'. :.AN LIL PFkSTRMDAHO. n0>.
<br /> j ! III � r•� l C \ V A \ - V .r�I umonnL Dw Nr,
<br /> AT AN.EPOINTs E.A aT I N W
<br /> N
<br /> rn As s u w FOR n� �a uses
<br /> It F,oNN>m
<br /> ti'MILY
<br /> GENERAL NOTES Q=
<br /> W-. ... -
<br /> l z AAPNLELD aCFn-A�Ns vaLucr w L PkR 1-1;
<br /> Rs1TW<,PE
<br /> _ —w _w—_ —w- —w w w N A �N I oAnr..n
<br /> =w w wt74W 7k AR AILS PQ, NT54N
<br /> __—ems -- e- s —s§ —ems ------SS ueALd w — w w w w w s WW
<br /> 2'WIDE
<br /> 74
<br /> TRANSITION ZONE
<br /> // \ ARFroR rll rLo.o OaaDF FIN PAYED =_
<br /> AR. 'ER ,1- RD kA4 6GW
<br /> w—._. --w -.-- ___\w .__w t—w w— w w--"__w__.—w w —w w t--w—.._mow-- W w-t—`x --w- f D _
<br /> \ \ \ \ \ 1 3 \\ c s r-Gir not PER—ENFPSIs, W
<br /> mlcu ' N uT a AunovAa Fe AAE z%tva lFTl
<br /> v v v v I ! v F L,.
<br /> XITfHNAT —.•• ECnaN m NPd Jm Zo a ! / T.BN
<br /> aN e Ni BE
<br /> s H �tiN +
<br /> \ F tt \�. 1 \ \ \ 4—1{ OC D VTi PPROVED-
<br /> 1 Z
<br /> 0 N
<br /> MAiu eE!1Y,NF :wa�
<br /> P PEF:Y Q.
<br /> t
<br /> \ 1 I - 1 I \ Fyn EjD FHl Nl WVOUTS AFF$HfiWN Z
<br /> 1 I I I tOa I.US{IWTIVEPVRPOSESONLV! N Z
<br /> 0 2
<br /> LU
<br /> BO
<br /> BASIC DRAINAGE NOTES CITY OF PUBLIC WORKSSDEP"EVERETT o
<br /> ARTM6NT F 0
<br /> 1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED, OR PUT INTO USE s,; „t'"' irimzms U LU
<br /> W W Q
<br /> UNTIL IT HAS BEEN INSPECTED, TESTED, AND ACCEPTED BY THE CITY OF EVERETT. - j\ §;, -
<br /> j). TYPICAL>IDE SCWER LAVUUTS �.6p1~ Q W a �
<br /> 2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT DESIGN AND I$ Q U.
<br /> CONSTRUCTION STANDARDS AND SPECIFICATIONS AND THE WSDOT/APWA STANDARD Z
<br /> O}
<br /> SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION (CURRENT EDITION).
<br /> 3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN.OBTAINED FROM AVAILABLE U O-
<br /> RECORDS AND ARE SHOWN FOR CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE 0 Y0 40
<br /> FOR VERIFICATION OF LOCATIONS AND TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES
<br /> SHOWN. IF CONFLICTS WITH EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE H RIzoNTAL SCALE ` City of Everett Permit Review -
<br /> CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AND ANY CHANGES REQUIRED Ho
<br /> SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO COMMENCEMENT OF RELATED EVERETT Status:Approved —
<br /> CONSTRUCTION ON THE PROJECT. - ° 11/17/2022 10:07:28 AM Call wo but'ssiness
<br /> inesslow 22-0607 P�+BJMS
<br /> 4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN EASEMENTS MUST BE Cali TWO bQ$iness TE 11/2/2022
<br /> STAKED BY SURVEY FOR LINE AND GRADE PRIOR TO STARTING CONSTRUCTION. - days before you dig.
<br /> 5. ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED 'DUMP NO WASTE, DRAINS TO 1"=20'
<br /> STREAM, LAKE, RIVER, PUGET SOUND, OR WETLAND." CHOOSE APPROPRIATE FEATURE FOR
<br /> THE PROJECT.