My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3702 W MUKILTEO BLVD B 2023 HARBORS EDGE TOWNHOMES Plans 2025-07-02
>
Address Records
>
W MUKILTEO BLVD
>
3702
>
HARBORS EDGE TOWNHOMES
>
Plans
>
3702 W MUKILTEO BLVD B 2023 HARBORS EDGE TOWNHOMES Plans 2025-07-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2025 7:47:47 AM
Creation date
6/23/2025 11:53:28 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
3702
Unit
B
Tenant Name
HARBORS EDGE TOWNHOMES
Permit
B2304-047
Year
2023
Notes
NEW "HARBOR'S EDGE" TOWNHOMES, UNIT B
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I-a U <br /> O o� <br /> U z <br /> UNIT 21 ul UNIT 20 UNIT 19 UNIT 18 <br /> I � <br /> I <br /> I <br /> I <br /> S08 4/S M, M SOB 7WER <br /> qs ON'g, M SOB w PER4/606 BTL <br /> __ _ _ _ - <br /> uiaKGLBB Wj.1e)$GLB 6Yz1fl>4 cLe� - - 5);x1s'4 cl.e HINGINEERIN"G P.S. <br /> .USH-EMEND EXTEND SHEAR WALL 8MTG (TOP FLUSH-EXTEND EXTEND SHEAR WALL SHTG (TOP FLUSH-EXTEND EXTEND SHEAR WALL SHTG (TOP FLUSH-EKTEND WALL SHTO oxea,.ua,. vxwnw <br /> :NGTH OF UNIT) WALL THRU CONT.THRU FULL LENGTH OF UNIT) WALL THRU CONT.THRU FULL LENGTH OF UNIT) WALLTHRU CONT.THRU FULL LENGTH OF UNIT) CONT.THRU <br /> DEMISING 9PACE CORNER DEMISING SPACE CORNER DEMISING SPACE CORNER CORNER <br /> T. <br /> I <br /> 4° <br /> p 4 4 <br /> SOB S08 SOB <br /> ZZY� <br /> eanno' <br /> RMtlon BCatlule <br /> p p d d d D• Dr DESCRIPTION pATE <br /> J1-18 J1-18 J1-18 J1-18 J PERMITSET s o w6Y102 <br /> —SIrEi2 <br /> C7 19 Ifc—omosT1�� <br /> SOB <br /> 5 5 <br /> B3(F) 5 5 B3 L — _ B3(F) _B3(F) <br /> 2 2 5 3: 5 2 2 TO HD 5 <br /> 2 13 '15/308 < y-15/SOB ease 2 soe 15/SOB s '-15IS06 slie 2 rY 15/S08 s 15806 s ------ a > 15/806 ��J 0 •t a L.LL Z <br /> S08 0 Q <br /> 2 2x4 2 2%4 q 2 2X4 B2IB2.5� _ _ 82IB2. B2/B2.5(�F • _ B2/82.5(F) <br /> B1 F —81 F B1(F) 81(F) L.L. <br /> () HGR PER HGR PER () HGR PER HGR PER r R <br /> SCHD 8CH0 pi-6 P1-6 SCHD SCHD <br /> HDR-a ?HDR CONT.Bi(F) - CONT.B1(F) HDR-a —HDR - CONT.Bt(F) z c— <br /> ry� O G <br /> S08 SOB S08 /, r< <br /> ''LU L1 <br /> B2l B2/ 62/ B21 V/ <br /> -. B2.5(F) B2.5(F) _ B2.5(F) <br /> .2 B1(F) Bi(F) J1-19.2 J1-19.2 81(F) B1(F) J1.19.2 X <br /> HGR PER HGR PER - <br /> L /HIEa - --- zZ+6 FLOOR FRAMING PLANNOTES: <br /> _ SCHD aCHD i. Floor Sheathing snail be.' is (Panel pan Rating 48 4).Glue Sheathing toe roming Members end o Ing below <br /> with adho onfonning to A.PA.Speciflwtion AFG-01.Fasten Sheathing to Fmming with 0.131"O x 2Y2"Nails as fellows: <br /> • B2/B2.5(F) a B2/B2.5(F) _ _ _• B2/B2.5 IF)—b 8-82/B2.5(F) •,,= Framing,Edges U Oc <br /> ry 1r ry p Framing,Field 10"oc <br /> 1 1 1 1 Boundaries,Blocking,Salts 8'Wc <br /> a BOe soa e s 8pe 8oS B At areas indicated as Blocked Diaphragm,provide 2x Flat Blocking(per General Structural Notes)at all Unframed Sheathing <br /> ads 308 Boa SOB O g N <br /> Panel Edges Fasten Sheathing b Framing and Blocking with 0.131"0 x 2 z'Nails as follows: <br /> i <br /> '1� - Framing Ed ea 4"oc � <br /> q 2'-0"SETBACK q A 2.0'SETBACK 4 p' A 3 X �� Framing,Fie d 10"oc E C N <br /> L12y6 _ 4 4'4 A �'6 J kD B— 'l Bountlarles,Blockin <br /> Pt �" B3(F 8/SOB B3(F) a L Pttyp _ B3(F) �11 9,Strata 4"oc Q L <br /> PT2x1q k, N pT gyp L PT2x10 �° LA PT 2x1p - See Drawings for other Sheathing Nailing requirements. 5 C C <br /> PT 2x70 LEDGER P4 2x10 G S+@ 2s 2k10 LEOG t F 200 LEDGER 6 T-0" 2. Floor joists shall beam and spacing shown on plan.Joist layout shown is a visual representation and shall be adjusted for C L 'Z <br /> HDR HDR SETBACK t ationa as required. <br /> 1012tl®17. I' W/(2)12tl®12"oc a y, -. HDR •• W/(2)12tl®12'ac W/(2)12d®1Yoc - pener _(NC <br /> PT—(DROPPED) T 7PDROPPID � — — — A PT4xS(DROPPED) PT 4x0(DROPPED) .r — •• ry d" WALL FRAMING PLAN NOTES: Q26(F) 2 T V N •y B2/B26(F) 3. xteror Walls shall be Shear Wall Type 1-6 With 2x8 tuds�l6"od,u.o.n.\ 3 rL 3 B7(F) Interiorwalis snail Da 2xa studs 1ebc,uoA, y 3 1T 1T 3 �S N ._ _ 6 3 1T g 3Oa- 3 3 a00 TO TO SOB3 Demising Walls shall be(2)walls with 1'Air Space.Each wall shell be 2x4 Studs®16"oc,u.o.n.Each wall shall be sheathed withTO I TO POST 19 19 POST TO TO POST of l layer of GWB in accordanwith Architectural Drawings.POBT�PoaT I POaT SOB TO TO 60BPOST - POST T SOB l0 Post SW800 P09T P03T 900 PT 4x4 DF#2 TOPPAlL SDe POST Where ad)acent Shear Walls arein contact,nail studs together per 3/SO6.See 1/SO6 for spacial stud requirements at Shear WallPT 4x GUAR TOP RAIL I T 4x4 DF#2 TOP PAIL V <br /> SAT PUCESDRAIL(NO AT GUARDRAIL(NO AT GUARDRAIL(NO ` types P1-3,P1-2,P2.4,P2-3,end P2-2. <br /> SPLICES),/A34 EA I SPLICES)w/A34 EA E•, SPLICES),/A30 EA <� <br /> UJ <br /> END TO POST I END TO POST END TO POST /' 4. Headers shall be 4x6 U.O.N.See Detail l&SO6. '^ <br /> I �•, !��'.. 5. Built-up Stud Groups in Walls supporting Beams,Posts or Girder Trusses above shall be(2)Studs,u.o.n.Sea General Structurel <br /> ZI Notes for fastening requirements. O <br /> �I <br /> �I <br /> CIO <br /> I <br /> LEGEND <br /> SX.X <br /> DETAIL CALI.- <br /> P1-X SHEAR WALL BELOW PER SCHEDULE OF 1/SOB SAG[.HOMES <br /> �No xTnw <br /> HORIZONTAL/DRAG STRAP SCHEDULE <br /> HOLD DOWM SCHEDULE C BEARING OR SHEAR WALL BELOW Sags Homo Northwest <br /> SIMPSON DETAIL PLAN SIMPSON DESCRIPTION <br /> PLAN SIMF ONANCHOR CALLOUT STRAP TYPE aso5lam Ave SE <br /> HOLDOWN REFERENCE/ C---L BEARING OR SHEAR WALL ABOVE Suite tie <br /> CALLOUT TYPE BOLT TYP NOTES Everett,WA <br /> JOIST/BEAM SCHEDULE � CS18x38" BEAM TO BEAM www.sageho .vim <br /> CS16x48" <br /> O STRAP — 14/SO6 U.O.N. <br /> PLAN TYPICAL SIMPSON �2 (2)CS16x36" BEAM TO BEAM POST BELOW <br /> TYPICAL SPACING JOIST/BEAM TYPE (2)CSl6x48" A <br /> CALLOUT FACE MOUNT HANGER 2 -- 14/SOB U.O.N. �' <br /> STRAPS BEAM TO JOB NO.: <br /> J1-19.2 19.2"ac — �3 C516x36" TOP PLATE \\e 22-447-02 <br /> J1-18 16"OC 11T/e"TJI 210 IUS2.08/11.88 u.o.n. O (3)CS78x48" 14/SOB U.O.N. BLOCKTHRU FLOOR FOR POST ABOVE(MATCH AREA) <br /> Jt-12 12"oc STRAP (2)CS18x3B' BEAM L PLOT DATE <br /> EA.TOP PLATE <br /> 2J1 — (2)1171C TJI 210 MIU4.28N1,u.o.n. O4 NOT USED HDR HEADER PER PLAN NOTE 4 09/02/2022 <br /> B1 — 13/4"x117/8"LSL HU11(MAX),u.o.n. ❑5 HTS30C TRUSSIB <br /> TO TOP PLATE <br /> ATE <br /> B2 — 3Y2"xl1T/a"LSL HUIHUC412(MAX),u.o.n. O VERTICAL — BEAM TO POST - DATE: 09/02/2022 <br /> o HTS30 TRUSS/BEAM (� FLUSH FRAMED(BOTT.FLUSH W/BOTT.OF FRAMING) <br /> 82.5 3Y2"x11T/e'GLB HU/HUC412(MAX),u.o.n. © DSC2R/L-SDS3 TO TOP PLATE SCALE: Y4'=1'-0" <br /> B3 — S 'xl1T/e"PSL HU/HUCS12(MAX),u.o.n. OB STH014 — 171807 U.O.N. � DRAWN: BIDS <br /> TRUSS/BEAM " HOLD-DOWN TO WALL ABOVE PER SCHEDULE ON PLAN <br /> B4 — 7"A 17%"PSL HHUS7.25/10,u.o.n. ❑7 DSC5R/L-SDS3 TO TOP PLATE CHCKD: RMH <br /> O7 HDUB-SDS2.5 SBT/e'>Q4 18/S07 U.O.N. <br /> �8 CS1Sx36" PLATE TO PLATE SHEET NO.: <br /> 0 1 2 ,4 8 B S03b <br />
The URL can be used to link to this page
Your browser does not support the video tag.