My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4101-25
>
Ordinances
>
Ordinance 4101-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 3:28:15 PM
Creation date
6/24/2025 3:16:06 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4101-25
Date
6/18/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EVERETT 2044 <br />COMPREHENSIVE PLAN <br /> <br /> <br /> <br /> 6/17/2025 <br />COMPREHENSIVE PLAN <br />TRANSPORTATION ELEMENT <br /> Page 134 <br />TR-6 Consider maintenance, life cycle, and operational costs when designing transportation <br />facilities. <br />TR-7 Integrate land use and transportation planning and decisions to support the Comprehensive <br />Plan. <br />TR-8 Incorporate transportation demand management strategies and transit-supportive and <br />pedestrian-oriented design features in new development through development review. <br />TR-9 Reassess and revise if necessary, the transportation element and comprehensive plan if an <br />assessment indicates that probable funding will fall short of meeting level-of-service standards <br />for transportation. <br />Transportation Demand Management <br />TR-10 Assist large employers in implementing commute trip reduction programs for employees, as <br />mandated by the state’s Commute Trip Reduction law, and evaluate the programs for <br />effectiveness and compliance. <br />TR-11 Maintain a comprehensive transportation demand management program for city employees as <br />an example to other local employers. <br />Transportation and Technology <br />TR-12 Employ intelligent transportation system technology and infrastructure to support the efficient <br />movement of people and vehicles throughout the city. <br />TR-13 Employ a citywide multimodal level-of-service concurrency standard that provides a network of <br />transportation facilities that meets the demand from new development. <br />Transit <br />TR-14 Everett proactively partners with other jurisdictions, transit agencies, and regional planning <br />agencies in the development of an efficient and effective regional multimodal transportation <br />system. <br />TR-15 Maintain transit service as a viable mode-of-travel to and from downtown and other activity <br />centers within the city and region and grow transit into a well-integrated network of fast, <br />frequent, and reliable service for most people. Prioritize transit and other transportation <br />services to trip generating sites in Everett. <br />TR-16 Integrate high-capacity transit systems with transportation modes and facilities serving the city <br />including inter-city and local transit, rideshare, and park & rides, as well as pedestrian and <br />bicycle facilities. <br />TR-17 Implement dedicated transit pathways to enable reliable, safe, and affordable connections <br />around and through the city. <br />Streets <br />TR-18 Design and manage arterials to support regional mobility while discouraging regional traffic <br />from using arterials in Everett to avoid freeway congestion or pricing. Support regional
The URL can be used to link to this page
Your browser does not support the video tag.