My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 4102-25
>
Ordinances
>
Ordinance 4102-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 3:49:40 PM
Creation date
6/24/2025 3:42:46 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
4102-25
Date
6/18/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
303
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
EVERETT 2044 <br />DEVELOPMENT REGULATIONS <br /> <br /> <br />6/17/2025 <br />DEVELOPMENT REGULATIONS <br />Page 97 <br />C. Porch Projectfng. 1 <br />1. Descriptfon. The main façade of the building is set back from the front or side street lot line 2 <br />with a covered structure (the porch) encroaching into the front setback. The resultfng 3 <br />setback area may be defined by a fence or hedge to spatfally maintain the edge of the street. 4 <br />The Porch may be one or two stories, is open on three sides, with all habitable space located 5 <br />behind the building setback line. 6 <br />Table 8-1: Porch Projecting 7 <br /> <br />Size <br />Width, Clear 15 8’ min.1 {A} <br />Depth, Clear 8 6’ min. {B} <br />Height, Clear 8’ min. {C} <br />Stories 2 stories max. <br />Finish Level above grade 12” min.21 {D} <br />Pedestrian Access 3’ wide min. {E} <br />Notes: <br />1 Reduce to 8’ min. and maximum 1 story when applied to Cottage Housing building type. <br />21 Shared entries may be set at grade per local and federal accessibility standards. <br />Porch shall be open on three sides. Clear glass may be installed between the porch columns. <br />The porch is not required to be covered. <br />The Porch is allowed to encroach into the front and side street setbacks in compliance with this <br />Chapter. <br />Ramps are required to be integrated along the side of the building to connect with the Projecting <br />Porch.
The URL can be used to link to this page
Your browser does not support the video tag.