Permit#: PW1904-034
<br /> Site Address: 2122106TH ST SW
<br /> Owner: PAUUS REMODELING LLC
<br /> Tenant: [TenNamel
<br /> App.Date: 4/12/2019
<br /> Proposed Use:
<br /> CITY OF EVERETT
<br /> Description: SITE WORK FOR NEW SFR
<br /> STANDARD PLAN NOTES Reviewed By: - Date:
<br /> Required Notes for Erosion/ Sedimentation Control Plans Required Notes for Water Plans T�
<br /> The following standard notes shall be added to construction plan sets and edited as appropriate to the A. No connection to the existing mains will be allowed except by means of an approved Office Set �e site set Fire/Planning Set
<br /> project. backflow prevention device prior to satisfactory flushing, testing, disinfection, and receipt of
<br /> 1. Approval of this erosion/sedimentation control (ESC) plan does not constitute an approval of satisfactory bacteriological test results.
<br /> permanent road or drainage design (e.g. size and location of roads, pipes, restrictors, channels, B. Connections to and taps on existing mains will be made by the Public Works Department at
<br /> retention facilities, utilities). the developer's expense. The Public Works Department shall be given at least 5 business days notice
<br /> 2. The implementation of these ESC plans and the construction, maintenance, replacement, and for each connection. The Public Works Department shall thereafter determine the date and time at
<br /> upgrading of these ESC facilities is the responsibility of the applicant/contractor until all construction which the connection shall be made.
<br /> is completed and approved and vegetation/landscaping is established. C. All work and materials must conform to City of Everett Standards.
<br /> 3. The boundaries of the clearing limits shown on this plan shall be clearly flagged in the field D. A pre-construction meeting shall be held with the City prior to the start of construction. The
<br /> prior to construction. During the construction period, no disturbance beyond the flagged clearing City of Everett Public Works Construction Division must be notified at least 24 hours prior to
<br /> limits shall be permitted. The flagging shall be maintained by the applicant/contractor for the commencement of construction.
<br /> duration of construction. E. The developer or the developer's authorized agent shall notify the Public Works Department
<br /> 4. The ESC facilities shown on this plan must be constructed in conjunction with all clearing and of a person who can be contacted regarding problems during construction on a 24 hour basis.
<br /> grading activities, and in such a manner as to ensure that sediment and sediment laden water do not F. Maintain a minimum of 10 feet horizontal and 18 inches vertical separation between potable
<br /> enter the drainage system, roadways, or violate applicable water quality standards. fi T
<br /> and non-potable conveyance systems.
<br /> 5. The ESC facilities shown on this plan are the minimum requirements for anticipated site �` �__�' _ J;_ _ — SW
<br /> G. All City of Everett valves shall be operated by Public Works Department personnel only. All I�_ -- �� _ _
<br /> conditions. During the construction period, these ESC facilities shall be upgraded as needed for I (�� 11�`+ (— — — -- -
<br /> unexpected storm events and to ensure that sediment and sediment-laden water do not leave the site. valves, new and existing, shall be accessible at all times.
<br /> 6. The ESC facilities shall be inspected routinely and maintained by the applicant/contractor to ,
<br /> Required Notes for Sanitary Sewer Plans p
<br /> ensure their continued functioning, especially after storm events.
<br /> The following standard notes are required on all Sanitary Sewer Plans:
<br /> 7. The ESC facilities on inactive sites shall be inspected and maintained a minimum of once a
<br /> A. All work and materials shall conform to the City of Everett Standards and WSDOT/APWA �,
<br /> month or within the 48 hours following a major storm event. �04tb:St_ ; o�Standard Specifications. g
<br /> 8. At no time shall more than one foot of sediment be allowed to accumulate within a trapped sw
<br /> B. No part of the sanitary sewer system shall be covered, concealed or put into use until it has p
<br /> catch basin. All catch basins and conveyance lines shall be cleaned prior to paving. The cleaning been tested inspected, and approved b the city inspector. SI TA-
<br /> operation P PP Y �' p
<br /> operation shall not flush sediment laden water into the downstream system.
<br /> 9. Stabilized construction entrances shall be installed at the beginning of construction and C. Approximate locations of existing utilities have been obtained from available records and are L --q - o
<br /> shown for convenience. The contractor shall be responsible for verification of locations and to avoid \.
<br /> maintained for the duration of the project. Additional measures may be required to ensure that all r ��*
<br /> damage to any additional utilities not shown. If conflicts with existing utilities arise during
<br /> paved areas are kept clean for the duration of the project. x _
<br /> construction, the contractor shall notify the public works inspector and any changes required shall be —
<br /> 10. The Contractor shall provide periodic street cleaning to remove debris and sediment tracked approved by the City Engineer prior to commencement of related construction on the project. 3 �'� "" ` '"w'�
<br /> off the site. — --
<br /> 1) D. All sewer main extensions within the public right-of-way or in easements must be staked VIA ,�,a• ' `e�'� -
<br /> 11. Appropriate measures shall be taken to stop sediment from entering surface water bodies if the proposed BMPs fail. by survey for line and grade prior to starting construction. fi 4 p
<br /> 12. Bare and/or disturbed soils shall remain uncovered and/or unstabilized for no more than 2 days
<br /> Sample Construction Sequence: -117VT St SW - —-
<br /> from October 1 through April 30, and for no more than 7 days from May 1 through September 30. 1) P Call for any utility locates at least two days prior to scheduled preconstruction meeting.
<br /> 2) Before any construction or development activity, a preconstruction meeting must be held between the
<br /> Required Notes for Storm Drainage Plans Cityof Everett the applicant and applicant's construction representative.
<br /> SW
<br /> 1. No part of the drainage system shall be covered, concealed, or put into use until it has been 3) Flag clearing limits. pp p \io
<br /> ` i
<br /> inspected, tested, and accepted by the City of Everett. 4) Install stabilized construction entrance. , ,J
<br /> 2. All work and material shall conform to the City of Everett Design and Construction Standards 5) Install filter fabric fence as indicated on plan.
<br /> and Specifications and the WSDOT/APWA Standard Specifications for Road, Bridge, and Municipal 6) Install offsite catch basin protection.
<br /> Construction (Current Edition). 7) Construct sediment trap/pond if applicable. ,! / 1
<br /> 3. Approximate locations of existing utilities have been obtained from available records and are 8) Clear and grub areas of the site to be rough graded or filled.
<br /> shown for convenience. The contractor shall be responsible for verification of locations and to avoid 9) Install interceptor swales/berms and check dams if applicable. VICINITY MAP
<br /> damage to any additional utilities shown. If conflicts with existing utilities arise during construction, 10) Rough grade site and install storm conveyance system and retention/detention facilities. Provide inlet 1" = 1000,
<br /> the contractor shall notify the Public Works Inspector and any changes required shall be approved by protection where indicated.
<br /> the City Engineer prior to commencement of related construction on the project. 11) Install remaining utilities and building.
<br /> 4. All storm systems within the public right-of-way or in easements must be staked by survey for 12) Finish grade site and construct asphalt parking areas, access drives, sidewalks, curbs and gutters.
<br /> 13) Complete site stabilization in accordance with landscape plans.
<br /> line and grade prior to starting construction. 14) Clean storm drainage system, on and off site, of all sediment and debris.
<br /> 5. All catch basin grates must be stenciled or stamped "Dump No Waste, Drains to Stream, Lake, 15) Remove temporary erosion control facilities when site is completely stabilized.
<br /> River, Puget Sound, or Wetland." Choose appropriate feature for the project. APPROVED
<br /> PUBLIC WOR S DEPAR MENT
<br /> BY
<br /> DATE
<br /> CITY OF EVERETT IREVIEAD FOR PERMIT
<br /> P//9 e —C 3,
<br /> TABLE OF CONTENTS
<br /> C1 COVER SHEET/ NOTES
<br /> C2 TESC PLAN
<br /> C3 DRAINAGE SITE PLAN
<br /> Dov a I U k SFR -- Revisions:
<br /> ® Site Ad ress: 122106th St SW C—
<br /> Jurisdiction: Everett
<br /> Parcel No.: 00535400003600 Interlaken Engineering and Design, PLLC
<br /> Applicant: Paul's Remodeling LLC Seattle, WA 206 470-9572 Cover Sheet
<br /> Knowwhat"sbelOW. Permit No.: C1810-016 I
<br /> Call811 bdom You dlg Interlaken Project No.: SEA-19-011 www.interiakenengineering.com Scale: Not to Scale
<br />
|