My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6424 BROADWAY ST VINCENT DE PAUL 2025-07-15
>
Address Records
>
BROADWAY
>
6424
>
ST VINCENT DE PAUL
>
6424 BROADWAY ST VINCENT DE PAUL 2025-07-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2025 8:31:24 AM
Creation date
6/25/2025 2:51:57 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
6424
Tenant Name
ST VINCENT DE PAUL
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intake &Approval Sheet (FOR PERMIT STAFF ONL)q PERMIT# <br /> BUILDING 1 MINING <br /> Intake OK by: Date: Intake OK by: Assign To: Date: <br /> Intake Comments: Intake Comments: <br /> Zone <br /> Overlay/Agreement <br /> ❑ Route to Commercial Building Nonresidential Use Y <br /> ❑ Route to Residential Building Residential Use <br /> ❑ Make this a"W"Permit Proposed No.of Dwelling Units: <br /> B1dg/Tl/Addn/Rem Size Total No, of Dwelling Units: <br /> Garage/Accessory Struct. Size Planning/Landscape Inspection Required before Final? ❑Yes ❑No <br /> Number of Stories "In Lieu"Fee:Type: Amount$ <br /> Basement []No ❑Yes, Fin/Unfin School Impact Fee: Total $ <br /> Type of Construction Calculated: Credit: <br /> Occupancy Group El Everett School Dist ❑Mukiiteo School Dist <br /> Occupancy Load Park Impact Fees for permits applied for after 1/112022: <br /> Fire Sprinklers: []Update Existing❑New System ❑Not Req'd Park Impact Fee Total$ (net due after credit for existing uses) <br /> Reason Sprinklers Required: Fee Schedule Used For Calculation(Year): <br /> ......................................................................... .. <br /> Fire Alarm: ❑Update Existing ❑New System ❑Not Req'd Permit Technician Use Only:Apply Phase-In Credit Per EMC19.63.200 <br /> Reason Fire Alarm Required: ❑ 100%Credit-Issued 1/1/2022-9/2/2022 <br /> RCW 64.55 MF vlorksheet req'd for permit? []Yes ❑ No ❑ 50%Credit-Issued 9/3/2022-6/2/2023 <br /> Add'I RCW 64.55 docs required prior to final? ❑Yes ❑No ❑ 0%Credit-Issued 6/3/2023 or later <br /> VALUATION CALCULATION: Total$/0 v ok�2,0 Additional Notes: <br /> z <br /> Approved By: Date: <br /> PUBLIC WORK$ <br /> Additional Notes: Intake OK by: Date: <br /> .--------------------------- -- ----- --- <br /> Intake Comments: ;PW Worksheet Needed if <br /> ❑Sys Dev Eval(UHI/sW)ElTraffic Mit Eval <br /> Approved Date:ps Yp "bZo USite Work/Drainage l]Address Letter <br /> ❑Backflow Prevention for high hazard: <br /> (dental,medical,animals,mortuary,hospital, <br /> FIRE DEPARTMENT ;supportive housing) <br /> - -.-- <br /> Separate/Deferred Submittals Required: ❑Route this folder for PW Review at end ---PW Review Worksheet <br /> []Fire Sprinklers ❑Fire Alarm ❑Other: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND [ Create Green Folder []Submitted Previously ❑Deferred <br /> ❑This Permit is Approved by Public Works <br /> Fire Dept.Fees: ❑ See PW Review Worksheet and associated attached items <br /> ❑ Review of As-Built Plans-NO FIRE FEE ❑A Separate PW Permit is Required(Permit#:,PW ) <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE AND ❑ Is located in this folder <br /> ❑ Review/Inspection Scope-ADD FIRE FEE ❑ Is in a Separate Green Folder Qoin with this folderfor permit issuance) <br /> Approved By: Date: ❑ Will be issued separately(separate Green Folder,PW Issued ahead of Bldg) <br /> Opublic Works has no scope- PW Not Required <br /> El]FCTRICALIPLUMBING Additional Notes: <br /> Additional Notes: �.(oT r..► 2i,,,,f <br /> Approved By: Date: Completed Date: (o p <br />
The URL can be used to link to this page
Your browser does not support the video tag.