Laserfiche WebLink
Acre Short Plat Stormwater Site Plan <br /> ■ Activities where there is 100 percent infiltration of surface water runoff within the site in <br /> approved and installed erosion and sediment control facilities. <br /> Coordination with Utilities and Other Jurisdictions: <br /> • Care has been taken to coordinate with utilities, other construction projects, and the local <br /> jurisdiction in preparing this SWPPP and scheduling the construction work. <br /> Inspection and Monitoring: <br /> • All BMPs shall be inspected, maintained, and repaired as needed to assure continued <br /> performance of their intended function. Site inspections shall be conducted by a person who is <br /> knowledgeable in the principles and practices of erosion and sediment control. This person has the <br /> necessary skills to: <br /> ■ Assess the site conditions and construction activities that could impact the quality of <br /> stormwater, and <br /> ■ Assess the effectiveness of erosion and sediment control measures used to control the quality <br /> of stormwater discharges. <br /> • A Certified Erosion and Sediment Control Lead shall be on-site or on-call at all times. <br /> • Whenever inspection and/or monitoring reveals that the BMPs identified in this SWPPP are <br /> inadequate, due to the actual discharge of or potential to discharge a significant amount of any <br /> pollutant, appropriate BMPs or design changes shall be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP: <br /> • This SWPPP shall be retained on-site or within reasonable access to the site. <br /> • The SWPPP shall be modified whenever there is a change in the design, construction, operation, <br /> or maintenance at the construction site that has, or could have, a significant effect on the <br /> discharge of pollutants to waters of the state. <br /> • The SWPPP shall be modified if, during inspections or investigations conducted by the <br /> owner/operator, or the applicable local or state regulatory authority, it is determined that the <br /> SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater discharges <br /> from the site, The SWPPP shall be modified as necessary to include additional or modified BMPs <br /> designed to correct problems identified. Revisions to the SWPPP shall be completed within seven <br /> (7) days following the inspection. <br /> 13. Protect Low Impact Development BMPs <br /> LID BMP's are infeasible for this project site due to the steep slopes. <br /> I <br /> October 15, 2021 <br /> Page 12 <br />'E <br />