My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4326 CRESCENT AVE 2025-07-14
>
Address Records
>
CRESCENT AVE
>
4326
>
4326 CRESCENT AVE 2025-07-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2025 10:01:51 AM
Creation date
6/25/2025 3:36:05 PM
Metadata
Fields
Template:
Address Document
Street Name
CRESCENT AVE
Street Number
4326
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Acre Short Plat Stormwater Site Plan <br /> A standard flow control riser/structure assembly is proposed at the outlet of the detention tank to control <br /> the release rate of storm water to the off-site, downstream system.The size and number of control orifices on <br /> this riser have been designed such that developed stormwater discharges match the existing site durations for <br /> the range of existing discharge rates from the 10-year peak flow through the full 100-year peak flow. Peak <br /> runoff rates from the developed site shall not exceed existing site runoff rates in the 25-year and 100-year <br /> return intervals. <br /> Refer to the WWHM results in Appendix C for more thorough information regarding the pre-developed <br /> and developed peak flow rates. <br /> E. Stormwater Treatment Plan <br /> Since this project site discharges to the combined sewer system, water quality treatment is not required. <br /> The project also proposes less than 5,000sf of new pollution generating impervious surfaces within the project <br /> boundary. As such, a formal water quality facility is not required. The proposed detention tanks and catch <br /> basin structures will allow for some sediment storage. <br /> E. Conveyance Analysis <br /> Surface water collection and conveyance for the project is proposed by means of grading, grated inlets, <br /> and below grade pipes. The collection system is composed of roof drains,catch basins, and piping that <br /> discharges all water into a subsurface detention tank system. A control structure located outside this detention <br /> facility discharges site runoff to the public combined sewer system. All facilities have been sized and designed <br /> per COESWMM requirements. <br /> Rational and Backwater calculations will be provided upon request. <br /> G. Maintenance and Operation Plan <br /> The on-site storm drainage conveyance facilities for this project will be privately maintained. The facility <br /> has been designed in accordance with the COESWMM and a site—specific Maintenance and Operation Plan is <br /> provided in Appendix E. <br /> i <br /> October 15, 2021 <br /> Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.