Laserfiche WebLink
evident until the time of construction, if variations appear evident} Ages Engineering, LLO <br /> should be requested to reevaluate the rc coininendations in this report prior to 'proceeding with <br /> construction. A contingency for unanticipated subsurface conditions should be included in the <br /> budget and schedule. Sufficient monitoring, testing and consultation should be provided by our <br /> 1%rin during construction to eonfinn that the conditions encountered are consistent with these <br /> indkated during our exploration. to provide recommendations for design changes should the <br /> conditions revealed during the work differ from those anticipated, and to evaluate whether <br /> earthwork and foundation installation activities comply with contract plans and specifications. <br /> The scope of our services does .not include services related to envirolnnental reiriediation and <br /> construction safety precautions. Our recommendations are not intended.to direct the contractors <br /> methods, techniques, sequences or procedures, except as specifically described in our report,for <br /> consideration in design. <br /> i <br /> Ages Engineering,L LC Page 13 <br /> i <br /> f <br /> i <br />