Laserfiche WebLink
- 1 2 3 4 5 6 <br /> DYKEMAN <br /> ARCHITECTURE + DESIGN I, <br /> PHASE II PLUMBING FIXTURES, <br /> PIPE CONNECTION(INCH) <br /> E TAG DESCRIPTION MANUFACTURER MODEL FLOW CW HW W V NOTES E <br /> FS-1 FLOOR SINK TBD TBD 0 GPM 0" 0" 0" 0" CONSULTANT: <br /> TD-1 TRENCH DRAIN TBD J7TBD 0 GPM 0" 0" 0" 0" <br /> PHASE III PLUMBING - FIXTURES " <br /> PIPE CONNECTION(INCH) - <br /> GT®P'E <br /> TAG DESCRIPTION MANUFACTURER MODEL- -- FLOW CW HW W V _NOTES <br /> FDA FLOOR DRAIN ZURN TBD 0 GPM 0" a. 0" 0" <br /> FS-1 FLOOR SINK ZURN TBD 0 GPM 0" 0" a, 0 <br /> L-1 LAVATORY KOHLER TBD 0 GPM 0" 0" 0" U, <br /> TD-1 TRENCH DRAIN IMC TEDDY TBD 0 GPM 0" 0" 0" 0" VARIOUS SIZES,SIZE PER FOOD <br /> SERVICE PLANS <br /> • <br /> WG1 WATER CLOSET AMERICAN STANDARD TBD 0 GPM 1" 0" 4" 2" _ <br /> ►NOOPF+t <br /> • z': Y <br /> 55 2s <br /> w�Ft�j.RCGISi�E�t�� <br /> D PROJECT IDENTIFICATION: D <br /> TENANT <br /> IMPROVEMENTS <br /> FOR <br /> HOPEWORKS <br /> AT <br /> 3315 BROADWAY <br /> EVERETT, WA <br /> PERMIT SET <br /> 08/29/2022 <br /> This drawing is: <br /> C i.Copyright 2017 Dykem an,Inc. C <br /> 2.The Architect's Instrument of Professional Service, <br /> 3.For use on this project only.Obtain Architect's <br /> written permission for any other use or reproduction. <br /> PROJECT <br /> 20121-031 <br /> • <br /> MARK DATE DESCRIPTION <br /> B B <br /> • <br /> PRINCIPAL IN CHARGE:I <br /> PROJECT MANAGER: I <br /> PROJECT ARCHITECT: <br /> JOB CAPTAIN: <br /> A PLUMBING - A <br /> SCHEDULES <br /> a <br /> 0 <br /> ■ <br /> 2 3 4 5 6 <br />