My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4849 SPIRE LN 2023 Plans 2025-06-27
>
Address Records
>
SPIRE LN
>
4849
>
Plans
>
4849 SPIRE LN 2023 Plans 2025-06-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2025 10:35:05 AM
Creation date
6/27/2025 10:34:33 AM
Metadata
Fields
Template:
Address Document
Street Name
SPIRE LN
Street Number
4849
Permit
B2305-034
Year
2023
Notes
TEMP FOUNDATION SUPPORT FOR REMOVAL OF CONTAMINATED SOIL
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Remedial Excavation: 4849 Spire Lane, Everett,WA <br /> December 8,2022 <br /> maximum dry density,as determined using test method ASTM D 1557. If large compaction <br /> equipment such as a hoe-pac is utilized for compaction, lift thicknesses may be increased <br />_... <br /> based on the soil type and actual size of compaction equipment.We recommend that hand- <br /> operated compaction equipment such as a jumping jack compactor be utilized within 5 feet <br /> of the adjacent structure, as large compaction equipment could create vibrations that may <br /> adversely affect the existing structure. <br /> WET WEATHER EARTHWORK <br /> In our opinion, the proposed excavation may be accomplished during wet weather without <br /> adversely affecting the site stability. However, earthwork construction performed during <br /> the drier summer months likely will be more economical. Winter/spring construction will <br /> require the implementation of best management erosion and sedimentation control practice <br /> to reduce the chances of off-site sediment transport. General recommendations relative to <br /> earthwork performed in wet conditions are presented below: <br /> • Sand bags or low berms should be used to prevent the flow of surface water <br /> into the excavation; <br /> • Surface water and groundwater that accumulates in the excavation should be <br /> pumped out of the excavation as soon as possible, to prevent the ponding of <br /> water; <br /> • Soil stockpiles should be covered with plastic sheeting; <br /> • Bales of straw, sandbags, and/or geotextile silt fences should be strategically <br /> located to control erosion and the movement of soil. Spilled soil should be <br /> swept off of the pavement areas to prevent the tracking of soil onto the right- <br /> of-way. <br /> CLOSURE <br /> We have prepared this report for use by 2018-2 IH Borrower LP, DBA, Invitation Homes, <br /> and the project team. Recommendations contained in this report are based on a site <br /> reconnaissance, the results of subsurface explorations conducted at the site, and our <br /> understanding of the project. The study was performed using a mutually agreed-upon <br /> scope of work. <br /> 22-389_4849 spire lane everett_rpt.docx Page I 0 PanGEO, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.