My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3817 SMITH AVE 2022 Plans 2025-06-27
>
Address Records
>
SMITH AVE
>
3817
>
Plans
>
3817 SMITH AVE 2022 Plans 2025-06-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2025 10:39:23 AM
Creation date
6/27/2025 10:39:16 AM
Metadata
Fields
Template:
Address Document
Street Name
SMITH AVE
Street Number
3817
Permit
M2210-064
Year
2022
Notes
REPLACE EXISTING RTU
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> { 031 Maltby'Rd <br /> Evergreen Stste,, <br /> Evergreen <br /> vv r e �&tomEvergreen State Snoho nish WA 95 <br /> i95 29 6 <br /> 1 + Heat&AC 11 A ElectServicesical - <br /> 42S 252.3114 <br /> 9 vww SmScom <br /> LIC-EVERGO220T <br /> Commercial -System Recommendation <br /> Proposal Date: Friday,October 7,2022 <br /> Service Address: Billing Contact/Authorized Representative: <br /> Royell Manufacturing Royall Manufacturing <br /> 3817 Smith Ave Everett WA 98201 3817 Smith Avenue Everett 98201 <br /> Dietrich Ahner Dietrich Ahner <br /> 559-940-0875 559-940-0875 <br /> Dietrich Ahner<DietrichA@Royell.com> Dietrich Ahner<DietrichA@Royell.com> <br /> Replace RTU <br /> Proposed Equipment: <br /> Trane 3ton Gas/Electric pkg RTU Roof <br /> Micrometl Low Leak Economizer RTU <br /> Columbia Adapter Curb Roof <br /> Filtration&Controls: <br /> Replace 3 ton package roof top gas/electric HVAC unit on 3817 Smith Ave Bldg.provide and install Low Leak economizer& <br /> roof curb adapter.Remove and recycle old Lennox unit,start tand test new unit and retrun to normal operating condition. <br /> Installation of the above to include the following: <br /> * 12 Months Parts&Labor Warranty <br /> * Apply/acquire/purchase necessary mechanical&electrical permits <br /> * Remove/haul away/recycle old equipment and debris <br /> * Technician fire off,start up,and test <br /> * Crane will be provided(and included in price)for all rooftop units. <br /> Exclusions: <br /> * Basic disconnect&reconnect is included in price below.If additional electrical work is determined necessary during layout or <br /> installation you will be notified. <br /> * If a structural engineer is required for permitting this will be billed separately. <br /> Price of Installation: plus sales tax& <br /> $16,745.00 permits <br /> Payment terms: <br /> 50%initial deposit recommended upon signing of contract,remainder due upon completion of work <br /> Cancellation fee: <br /> If equipment is ordered factory-direct and in the case of a cancellation,Customer will be responsible for the cost of <br /> equipment restock fee. <br /> Respectfully submitted, <br /> Accepted by: r�� TT <br /> Date: By: fill (Teem <br /> This recommendation is valid if signed within thirty(30)days and when accepted will constitute a contract between both parties. <br /> By signing above you are stating as the Authorized Representative of this property/company that this work may now commence and you agree to the terms <br /> stated within this contract and its attached"Notice to Customer." <br />
The URL can be used to link to this page
Your browser does not support the video tag.