Laserfiche WebLink
GENERAL PIPING SPECIALTIES ABBREVIATIONS GENERAL NOTES-MECHANICAL NON-STRUCTURAL MECHANICAL COMPONENT NOTES �'1 II U N <br /> C / EXISTING MECHANICAL TO BE 0 DIAMETER,PHASE F FAHRENHEIT,FIRE MAIN PIPING NA NOT APPLICABLE uvM..c.W <br /> ///// UNION EGO FLOOR CLEANOUT NC NORMALLY CLOSED,NOISE CRITERIA (p) srene,howl/lases.. <br /> REMOVED # 1.COORDINATE MECHANICAL WORK WITH THAT OF OTHER 1.THE COMPONENT IMPORTANCE FACTOR FOR ALL <br /> (� EXISTING MECHANICAL TO A AIR,AMPS FCU FAN COIL UNIT NIC NOT IN CONTRACT TRADES(ELECTRICAL ARCHITECTURAL,STRUCTURAL, NON-STRUCTURAL COMPONENTS SHALL BE: SAX �,�,y <br /> I REMAIN I FLANGE ppy AUTOMATIC AIR VENT FIRE DAMPER,RECOIL DRAIN,DRY SPRINKLER CIVIL,AECTURA,ND .STRUCTURAL,REFER CTIVIL,AND <br /> San Fn�m.uwiziai <br /> FD NO NORMALLY OPEN,NITROUS OXIDE ARCHITECTURAL, CIVIL,AND LANDSCAPE Ip=1.0 <br /> s 1 1 ABV ABOVE ROUTING NO. NUMBERBANS/MT.=0L - <br /> NEWMECHANICALWORK FLEX CONNECTOR FDC FIRE DEPARTMENT CONNECTION DRAWINGSOR TO ICATION COORDINATION SHALL uMrttVN,sp2pEmmr21D <br /> t ADA AMERICANS WITH DIS4BIL1TIE5 ACT NTS NOT TO SCALE OCCUR PRIOR TO FABRICATION,PURCHASE,AND/OR 2.THE FOLLOWING ITEMS ARE TAKEN DIRECTLY FROM THE <br /> $ _ MATCHLINE OR PROPERTY THERMA/SEISMIC FLEXIBLE AF AIRFOIL FF FOULING FACTOR,FLAT FILTER INSTALLATION OF ALL WORK 20181NTERNATIONAL BUILDING CODE AND FROM THE <br /> LINE LOOP AFF ABOVE FINISHED FLOOR FFD FUNNEL FLOOR DRAIN OC ON CENTER AMERICAN SOCIETY OF CIVIL ENGINEERS(ASCE) mnnv� <br /> € Z AFUE ANNUAL FUEL UTILIZATION EFFICIENCY FLA FULL LOAD AMPS OD OUTSIDE DIMENSION OR DIAMETER 2.COORDINATE PLUMBING,HVAC,AND FIRE PROTECTION STANDARD7.THE CONTRACTOR SHALL REFER TO THE <br /> ' ENLARGED PLAN BOUNDARY [] THERMAL EXPANSION JOINT FLEX FLEXIBLE SYSTEMS ROUTES PRIOR TO INSTALLATION.DURING ABOVE FOR ADDITIONAL INFORMATION,EXCEPTIONS.AND <br /> AG ABOVE GROUND yA ^ I $ <br /> 1 AHJ AUTHORITY HAVING JURISDICTION FLR FLOOR P PUMP,RESSUPRESSURE,PLUMBING DRAINFIXTURE LAYOUT COORDINATION,DUCTWORK TAKES PRECEDENCE FURTHER DESCRIPTIONS.THE AND AS <br /> ff V a <br /> e DETAIUPLAN IDENTIFIER .� STRAINER FLTR FILTER OVER PLUMBING,INCLUDING FIRE PROTECTION SYSTEMS. ADHERE TO REQUIREMENTS AND AS SUCH,SHALL BE y.ur <br /> % 5 ABS AMBIENT PO PRESSURE DROP,PUMPED DRAIN INCLUDED[WITHIN BID.ALSO REFER TO SPECIFICATION <br /> ¢ STRAINER WITH BLOW OFF AP ACCESS PANEL FMS FLOW MEASUREMENT STATION(HVAC,PLUMBING) pH PHASE 3.[REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS SECTION[15210]]230550]. <br /> g Y ' VALVE ABS AIR PRESSURE DROP FOR FUEL OIL RETURN PIPING PIV POST INDICATOR VALVE FOR LOCATIONS OF EXPANSION/SEISMIC JOINTS.PROVIDE <br /> E 2 QCV FOS FUEL OIL SUPPLY PIPING EXPANSIOWSEISMIC JOINTS FOR PIPING AND DUCTWORK 3.2018 IBC,1613.1,SCOPE:ARCHITECTURAL,MECHANICAL, <br /> SECTION IDENTIFIER - II PIPE ANCHOR ARCH ARCHITECT POC POINT OF CONNECTION mwyw.ro <br /> AMERICAN SOCIETY OF HEATING,REFRIGERATION FOT FUEL OIL TANK PR CONDENSATE PUMP RETURN CROSSING EXPANSION/SEISMIC JOINTS.][DELETE NOTE IF ELECTRICAL,AND NONSTRUCTURAL COMPONENTS THAT .. w-drew <br /> ASHRAE AND AIR-CONDITIONING ENGINEERS,INC. <br /> ASSY ASSEMBLY FP FIRE PUMP.FLOATING POINT CONTROL THERE ARE NO EXPANSION/SEISMIC JOINTS ON PROJECT- ARE PERMANENTLY ATTACHED TO STRUCTURES AND <br /> ALIGNMENT GUIDE PRV PRESSURE REDUCING VALVE <br /> PSIS POUNDS PER SQUARE VALVEINCH GE COORDINATE WITH THE STRUCTURAL ENGINEER.SHOW THEIR SUPPORTS AND ATTACHMENTS SHALL BE DESIGNED <br /> FPM FEET PER MINUTE <br /> tTv TEMPERATURE/PRESSURE ATM ATMOSPHERE FPS FEET PER SECOND ONDRAWINGS] <br /> EXPANSION/SEISMIC JOINTS FOR PIPING AND DUCTWORK AND CONSTRUCTED TO RESIST THE EFFECTS OF <br /> qq el ELEVATION IDENTIFIER ON DRAWINGS/ EARTHQUAKE MOTIONS IN ACCORDANCE WITH ASCE7, PROJECT <br /> E TEST PORT FS FLOOR SINK <br /> OTT QUANTITY EXCLUDING CHAPTER 14 AND APPENDIX ILA. <br /> THERMOMETER <br /> B BOILER F/S FIRE/SMOKE DAMPER 4.UNLESS OTHERWISE SPECIFIED,THE GENERAL Monte Cristo Hall and <br /> 1REVISION DEFINITION AREA, BF BELOW FLOOR FT FEET,FIN TUBE REF REFERENCE,RETURN/EXHAUST FAN CONTRACTOR(GC)SHALL BE RESPONSIBLE FOR PAINTING, 4.201618C,1704A.CONTRHCTOR RESPONSIBILITY:THE <br /> AREA ENCIRCLED CONTAINS BHP BRAKE HORSE POWER ETD FOOTING DRAIN CUTTING,AND PATCHING OF EXISTING FLOORS,WALLS, CONTRACTOR SHALL BE RESPONSIBLE FOR THE Annex Demolition <br /> 2 CHANGES MADE SUBSEQUENT PRESSURE GAGE RISC ROUGH IN AND CONNECT <br /> KW BELOW FTG FOOTING DRAIN AND PARTITIONS IN THE EXISTING BUILDING. CONSTRUCTION OF SEISMIC-FORCE-RESISTING SYSTEM, <br /> RlA RATED LOAD AMPS LOCATION <br /> S TO PREVIOUS ISSUE BOP BOTTOM OF PIPE FV FACE VELOCITY DESIGNATED SEISMIC SYSTEM,OR SEISMIC-RESISTING <br /> RO REVERSE OSMOSIS 5.REFER TO STRUCTURAL DRAWINGS FOR ALLOWABLE COMPONENT LISTED IN THE STATEMENT OF SPECIAL <br /> I BDT BOTTOM 2000 Tower Street <br /> yRIBA REDUCED PRESSURE BACKFLOW ASSEMBLY STRUCTURAL <br /> FOR HANGING PIPING/DUCTS FROM INSPECTIONS AND SHALL SUBMRA WRITTEN STATEMENT <br /> E Q PUMPS BTUM BRITISH THERMAL UNIT PER HOUR G GAS <br /> REVISION CALLOUT RPBP REDUCED PRESSURE BACKFLOW PREVENTER STRUCTURALMEMBERS. OF RESPONSIBILITYTO <br /> THE <br /> ECEMENT OFWLRNDTHE Everett,WA 98201 <br /> BV BALL VALVE GA GAGE RPM REVOLUTIONS PER MINUTE OWNER PRIOR TO THE COMMENCEMENT OF WORK ON THE <br /> FLAG NOTE CALLOUT (]- CENTRIFUGAL PUMP GAL GALLONS RV SAFETY RELIEF VALVE 6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THESAFE SYSTEM OR COMPONENT.THE CONTRACTOR'S <br /> E g C CONDENSATE PIPING GALV GALVANIZED KEEPING OF HIS OWN PROPERTY ON THE JOB SITE. STATEMENT OF RESPONSIBILITY SHALL INCLUDE THE <br /> 1Q, CA AIR COMPRESSOR GC GAS COCK,GENERAL CONTRACTOR OWNER ASSUMES NO RESPONSIBILITY FOR PROTECTION FOLLOWING: , <br /> T Oi DEMOLITION NOTE TAG INLINE PUMP OF PROPERTIES AGAINST FIRE,THEFT,ANO <br /> y 3 CAP CAPACITY GFU GAS FIRED UNIT S SENSOR PREPARED FOR <br /> ); ENVIRONMENTAL CONDITIONS. A.ACKNOWLEDGEMENT OF OF THE <br /> { O+ EQUIPMENT TAG CBV CIRCUIT SETTING BALANCING VALVE OFF GALLONS PER FLUSH Community <br /> $ CIRCULATING PUMP SCH SCHEDULE STATEMREQUIREMENLINSPECTIONSNTHE Everett <br /> CD CEILING DIFFUSER,CONDENSATE DRAIN GPH GALLONS PER HOUR DENS SENSIBLE STATEMENT OF SPECIAL INSPECTIONS; <br /> CFM CUBIC FEET PER MINUTE GPM GALLONS PER MINUTE MECHANICAL EQUIPMENT INSTALLATION NOTES College <br /> le MECHANICAL EQUIPMENT TAG BASE MOUNTED PUMP CKV CHECK VALVE GPRV GAS PRESSURE REGULATING VALVE SF SUPPLY FAN,SQUARE FOOT B.ACKNOWLEDGEMENT THAT CONTROL WILL BE <br /> SEC ` , SHC STEAM HEATING COIL <br /> E6 EXERCISED TO OBTAIN CONFORMANCE WITH THE <br /> MECHANICAL EQUIPMENT TAG CLG CEILING,COOLING GV GATE VALVE,GLOEE VALVE SIM SIMILAR <br /> U CO CLEANOUT,CO SENSOR GW GREASE WASTE PIPING SOT SHUTOFF VALVE 1.ACCESS CLEARANCES FOR MAINTENANCE AND CONSTRUCTION OOC DOCUMENTS APPROVED BY THE <br /> g € CO2CO2SENSOR GWB GYPSUM WALLBOARD REPLACEMENT:VERIFY PHYSICAL DIMENSIONS OF BUILDING OFFICIAL; .34 C+4h. <br /> F i' /I SP STATIC PRESSURE EQUIPMENT TO ENSURE THAT ACCESS CLEARANCES CAN �QY OfW�: -F <br /> 1V' NORTH ARROW DOMESTIC WATER PIPING SYSTEM COMB COMBUSTION,COMBINATION SPS STATIC PRESSURE STATION BE MET.COORDINATE LOCATIONS OF MECHANICAL WORK C.PROCEDURES FOR EXERCISING CONTROL WITHIN THE `F V4'¢+ <br /> 1 / CONS CONDENSER,CONDENSATE H HUMIDISTAT,HEIGHT SS STAINLESS STEEL,SANITARY SEWER AND WORK OF OTHER TRADES TO PROVIDE ACCESS CONTRACTOR'S ORGANIZATION,THE METHOD AND <br /> 'g $ CONN CONNECTOR HORIZ HORIZONTAL STM STEAM. CLEARANCES FOR SERVICE AND MAINTENANCE, FREQUENCY OF REPORTING AND THE DISTRIBUTION '} <br /> g' LOCATION WHERE PICTURE - DOMESTIC COLD WATER <br /> O CONT CONTINUE,CONTROL HP HORSEPOWER,HEAT PUMP OF THE REPORTS; A '�+ cc`D <br /> WAS TAKEN AND DIRECTION S.TK STORAGE TANK °9 ly Jy <br /> COP COEFFICIENT OF PERFORMANCE HPC HIGH PRESSURE CONDENSATE RETURN ^O <br /> H i 8 INVERT ELEVATION OR POC - DOMESTIC HOT WATER COTG CLEANOUT TO GRADE HPS HIGH PRESSURE STEAM TD TRENCH DRAIN,TEMPERATURE DIFFERENCE PIPING NOTES D.IDENTIFICATION CASINGQUALIFICATIONS NTROFTHE ', '➢PC 51£E��'V <br /> 1 DOMESTIC HOT WATER CONDENSATE RECEIVER,CONDENSER WATER HRU HEAT RECOVERY UNIT PERSON(S)EXERCIDINGSUCHCONTROLAND THEIR ss, �0� <br /> I 1 j CR TDH TOTALDYNAMIC HEAD POSITION(S)IN THE ORGANIZATION. ` H• <br /> g CIRCULATION RETURN HE HOT WATER PIPING TEMP TEMPERATURE `YJ� <br /> 5 d CS CONDENSER WATER SUPPLY MNC HOT WATER CIRCU'ATWG PIPING 1.DISASSEMBLY PROVISIONS:PROVIDE UNIONS OR q-DIVISION 21,22,23 RESPONSIBILITIES: 1/4 DOMESTIC HOT WATER(TEMP. TOP TOP OF PIPE FLANGES AT PIPING CONNECTIONS TO EQUIPMENT,COILS, <br /> A i ELECTRICAL PROVISIONS FOR MECHANICAL WORK . C.TK COMPRESSION TANK HER HOT WATER RETURN <br /> fb £££ ) COD TOP OF STEEL TRAPS.CONTROL VALVES,AND OTHER COMPONENTS TO <br /> CU CONDENSING UNIT,CUBIC HES HOT WATER SUPPLY A.HANGERS AND SEISMIC BRACING FOR MECHANICAL <br /> LOCATION OF STARTER, Cv FLOW COEFFICIENT HX HEAT EXCHANGER TOF TOP OF FOOTING ALLOW DISASSEMBLY FOR MAINTENFWCE. SYSTEMS SHALL BE DESIGNED AND SPECIFIED BY <br /> DISCONNECT 8 CONTROLS TRAP STEAM TRAP DIVISION 21,22,23.DIVISKIN 21,22,23 SHALL REFER <br /> g CV CONSTANT VOLUME HZ HERTZ 2.REFRIGERANT PIPING:PROVIDE SIZING AND INSTALLATION <br /> $ 8 STEAM PIPING SYSTEM TSP TOTAL STATIC PRESSURE TO THE MECHANICAL DRAWINGS FOR LOCATIONS OF <br /> t VARIABLE FREQUENCY DRIVE CW COLD WATER PIPING IN STRICT ACCORDANCE WITH MANUFACTURER'S <br /> Y ® TSTAT THERMOSTAT EQUIPMENT AND HUNG MECHANICAL SYSTEMS AS <br /> CWR CONDENSING WATER RETURN INSTRUCTIONS AND IN SUCH A WAY AS TO BE <br /> Y ' 1 M M D ND DRAIN TYP TYPICAL STRUCTURAL DRAWINGS DO NOT SHOW THE <br /> Fd 11-' -II SYMBOLS OR END OFFN PR- CONDENSATE PUMP RETURN CWS CONDENSING WATER SUPPLY E NVERT ELEVATION INCONSPICUOUS AND FREE FROM ANY POSSIBLE <br /> SYMBOLS END RUN CONDENSATION.PIPE SIZES NOTED ARE FOR REFERENCE LOCATIONS OF MECHANICAL EQUIPMENT,DUCTWORK, <br /> f <br /> E HIGH PRESSURE STEAM N. NCH UG UNDERGROUND AND SHALL BE INSTALLED PER MANUFACTURERS PIPING,AND OTHER COMPONENTS. <br /> -�- (ABOVE 75 PSIG) D DRAIN N.WG NCHES WATER COJIAIN LINO UNLESS NOTED OTHERWISE RECOMMENDATIONS.CONTRACTOR SHALL PROVIDE <br /> p DB DRY BULB(TEMPERATURE) RR RRIGATION PIPING CONTROL SG BETWEEN EQUIPMENT FOR AN B.DIVISION 21,22,23 SHALL COORDINATE THE SUPPORT <br /> B I I ACCESS,EXCAVATION,AND BACKFILLINGHIGH PRESSURE STEAM <br /> -IR- dB DECIBEL W NDIRECT WASTE PIPING OPERATIONAL SYSTEM. SYSTEMS AND DESIGN LOADS FOR HUNG PIPING AND <br /> ggp 2 E CONDENSATE RETURN DCVA DOUBLE CHECK VALVE ASSEMBLY V VENT PIPING VOLT OTHER MECHANICAL SYSTEMS(INCLUDING COMBINED <br /> % MEDIUM PRESSURE STEAM VA VALVE MULTIPLE PIPE RUNS)WITH THE GENERAL <br /> 3 ACCESS DOOR(SPECIFIED OR -� (18-75 PSIS) DDCV DOUBLE DETECTOR CHECK VALVE kW KILOWATT 3.PESSUREREMPERATURE TEST PORTS:PROVIDE AT <br /> DEG DEGREE VAV VARIABLE AIR VOLUME CONTRACTOR AND THE STEEL AND WOOD JOIST <br /> 3 e SUPPLY AND RETURN PIPING CONNECTIONS TO <br /> U $ 2 AS SHOWN ON DINGS) _,F_ MEDIUM PRESSURE STEAM VCD VOLUME CONTROL DEVICE EQUIPMENT. MANUFACTURERS IN ADDITION TO OTHER TRADES <br /> ee CONDENSATE RETURN DFU DRAINAGE FIXTURE UNIT L LENGTH THAT MAY BE IMPACTED. <br /> 4 p __ VD VOLUME DAMPER <br /> g MECHANICAL ACCESS LOW PRESSURE DTEAM DI DUCTILE IRON LAT LEAVING AIR TEMPERATURE VEL VELOCITY 4.PROVIDE AN INSULATED COPPER TRACER WIRE OR OTHER <br /> (SPECIFIED OR AS SHOWN ON W 015 PSIG DIA DIAMETER LB LINEAR BAR APPROVED CONDUCTOR ADJACENT TO UNDERGROUND <br /> g [ DINGS) ( ) VFD VARIABLE FREQUENCY DRIVE <br /> 6yg -- DIM DIMENSION LBS POUND VOLT VOLTAGE NONMETALLIC(PLASTIC)PIPING.ACCESS SHALL BE <br /> Y LOW PRESSURE STEAM <br /> p Y -LfC- LOCATION OF STARTER,DISCONNECT AND PROVIDED TO THE TRACER WIRE OR THE TRACER WIRE <br /> CONDENSATE RETURN DISC IPS LOW PRESSURE STEM/ VTR VENT THRU ROOF ENERGY CODE NOTES <br /> 2§ CONTROLS LEA LOCKED ROTOR AMPS <br /> SHALL TERMINATE ABOVE GROUND AT EACH END OF THE <br /> 1 $ PIPING T STEAM RMroro 0.10 TX TAM EN DISCHARGE PIPING.THE TRACER LATIONWIRE YPESHLL NOT LLE LES UITAN NO, o n � <br /> LR LINEAR RETURN W WASTE,WATT,WIDE,WATER 18AWG AND THE INSULATION TYPE SHALL LESUITABLE <br /> ►2i ON DOWN 1.MOTORS:COMPLY WITH MINIMUM FULL LOAD <br /> PIPE ELBOW UP OR PIPE TEE DPV DIFFERENTIAL PRESSURE VALVE W/ WITH FOR BURIAL- EFFICIENCIES LISTED IN ENERGY CODE ENFORCED BY AHJ. <br /> O 18 - ANV MANUAL AIR VENT <br /> $ 1. UP AND DOWN DINGS DRAWINGS WB WET BULB(TEMPERATURE) <br /> 3 MAX MAXIMUM 5.PROVIDE 12'LONG,K-WIDE FLUORESCENT ORANGE TAPE 2,PIPING AND DUCT INSULATION:COMPLY WITH <br /> DV DRAIN VALVE WC WATER CLOSET,WATER COLUMN <br /> s $YP PIPE ELBOW DOWN MBH THOUSAND BTU PER HOUR AT CONCEALED VALVE LOCATIONS. THICKNESSES AND TYPES LISTED IN ENERGY CODE <br /> DEB DOMESTIC WATER BOOSTER WG WATER GAGE <br /> COMPRESSED AIR PIPING SYSTEM MC MECHANICAL CONTRACTOR ENFORCED BY AHJ UNLESS MORE STRINGENT <br /> MCA MINIMUM CIRCUIT WH WATER HEATER,WALL HYDRANT <br /> 8 - PIPE TEE UP - REQUIREMENTS ARE SPECIFIED.[PROVIDE SCHEDULES <br /> 2 n (E) EXISTING MECH MECHANICAL WHA WATER HAMMER ARRESTOR PLUMBING NOTES ON DRAWINGS IF REQUIRED BY AHJ] <br /> p e o A COMPRESSED AIR EA EXHAUST AIR WM WATER METER <br /> 8€ y€ • PIPE TEE DOWN MERV MINIMUM EFFICIENCY REPORTING VALUE <br /> e EAT ENTERING AIR TEMPERATURE WSEC WASHINGTON STATE ENERGY CODE 3.DUCT SEALING:SEAL DUCT TRANSVERSE JOINTS AND <br /> H E 0 COMPRESSED AIR DROP MIN MINIMUM LONGITUDINAL SEAMS PER ENERGY CODE ENFORCED BY <br /> Iy 1 E • PIPE RISE EER ENERGY EFFICIENCY RATIO WSFU WATER SUPPLY FIXTURE UNIT 1.WATER HAMMER ARRESTORS:PROVIDE AT THE END OF <br /> 9 COMPRESSED AIR PRESSURE EFF EFFICIENCY A10CP MAXIMUM PROTECTION WT WEIGHT HOT AND COLD WATER LINES SERVING TWO OR MORE <br /> ggAHJ UNLESS MORE STRINGENT REQUIREMENTS ARE <br /> t 9 PIPE CAP REGULATOR EL ELEVATION MOD MOTOR OPERATED DAMPER SPECIFIED. <br /> 2 MPC MEDIUM PRESSURE CONDENSATE RETURN DRAINAGE INSTITUTE(POI)REQUIREMENTS.IMBING AND <br /> S E ELEC ELECTRIC MPG MEDIUM PRESSURE GAS 4.RECORD DRAWINGS:SUBMIT TO THE BUILDING OWNER E 5 t 4 PIPE PLUG EMCS ENERGY MANAGEMENT AND CONTROL SYSTEM MPS MEDIUM PRESSURE STEAM 2.REDUCED PRESSURE BACKFLOW PREVENTERS(RPBP): PER ENERGY CODE ENFORCED BY THE LOCAL AHJ. <br /> I z' F EQUIV EQUIVALENT PROVIDE INDIRECT DRAIN PIPING FROM RPBP TO NEAREST oc.. <br /> FLOW DIRECTION FIRE PROTECTION SYSTEM 5.OPERATION AND MAINTENANCE MANUALS:SUBMIT TO THE <br /> ` ESP EXTERNAL STATIC PRESSURE DRAIN.INSTALL FUNNEL AT RPBP IF REQUIRED. HARGIS <br /> ET EXPANSION TANK BUILDING OWNER PER ENERGY CODE ENFORCED BY THE <br /> E EVAP EVAPORATOR,EVAPORATIVE 3.ACCESS PANELS:PROVIDE IN NON ACCESSIBLE CEILINGS LOCAL AHJ. <br /> PIPE BREAK ! FIRE SPRINKLERBC <br /> a EWC ELECTRIC WATER COOLER AND WALLS FOR VALVES,HR WATEITEMS HAT REQUIRE <br /> ARRESTERS, 6.SYSTEM BALANCING:BALANCE HVAC SYSTEMS PER ^'g' ' <br /> CLEANOUTS,AND OTHER ITEMS THAT REQUIRE ACCESS <br /> 'E a PIPE CONNECTION -fY- FIE MAIN EWT ENTERING WATER TEMP ENERGY CODE ENFORCED BY THE LOCAL AHJ AND SUBMIT CC <br /> TO PROPERLY MAINTAIN OR SERVICE THE BUILDING. <br /> ss IXT EXTERIOR,EXTERNAL REFER TO SPECIFICATIONS. A WRITTEN REPORT TO THE BUILDING OWNER.REFER TO rR <br /> SPECIFICATIONS FOR ADDITIONAL TESTING,ADJUSTING. RR <br /> g ; -,D DRY SPRINKLER 4.CLE/WOUTS:PROVIDE AT THE BASE OF SANITARY AND BALANCING(TAB)REQUIREMENTS. wa* r.co <br /> s E 3 VALVES S RECESSED SPRINKLER HEAD DRAINAGE,PROCESS WASTE,AND RAINLEADER RR r.� <br /> CONDUCTORS, 7.MECHANICAL SYSTEMS COMMISSIONING AND COMPLETION <br /> i T VALVE:GATE,BALL. REQUIREMENTS:TEST SYSTEMS TO ENSURE THAT <br /> a 2' BUTTERFLY(REFER TO O SEMI-RECESSED SPRINKLER BC <br /> HEAD 5,WATER SUPPLY DISINFECTION TEST,REFER TO SCHEDULE BUILDING SYSTEMS HAVE BEEN DESIGNED,INSTALLED, <br /> 1 { SPECIFICATIONS) •A^ON PUBLIC HEALTH SEATTLE KING COUNTY'S(PHSKC) AND FUNCTION PROPERLY,EFFICIENTLY,AND CAN BE per,/: <br /> E S Cd - GLOBE VALVE G UPRIGHT SPRINKLER HEAD WEBSRE FOR DISINFECTION OF POTABLE WATER SYSTEM MAINTAINED IN ACCORDANCE WITH THE CONTRACT ' FREE(/,I„_42'F <br /> ® IN ACCORDANCE WITH SEATTLE PLUMBING CODE(SPC) DOCUMENTS IN ORDER TO SATISFY THE BUILDING R0 'I;ECT <br /> n S € W SOLENOID VALVE DOUBLE DETECTOR CHECK SECTION 609.9.NOTE:PLUMBING PERMITS WILL NOT BE OWNER'S DESIGN INTENT AND OPERATIONAL <br /> T -YQRO4 ASSEMBLYDOUBLE CHECK VALVE APPROVED FOR FINAL INSPECTION UNTIL DISINFECTION REQUIREMENTS PER ENERGY CODE ENFORCED BY THE �,�,�' <br /> # R CHECK VALVE TEST MEETS DRINKING WATER QUALITY. LOCAL AHJ,REFER TO SPECIFICATIONS FOR ADDITIONAL ��V <br /> 3 1 COMMISSIONING REQUIREMENTS <br /> WI BALANCING VALVE 8.THIS BUILDING AND ITS ENERGY SYSTEMS HAVE BEEN -"-y�L'� <br /> s I HYDRONIC PIPING SYSTEM r DESIGNED TO COMPLY WITH ENERGY ENFORCED BY ST/T i,A51111,CTOI'. <br /> 'se 1 g e IS PRESSURE REDUCING VALVE Additional Permits Are Required CTHE ORRECT <br /> T INSTALLATION <br /> ENE RESPONSIBLE CODEENFORR <br /> E yE CORRECT INSTALLATION OF ENERGY CONSERVATION <br /> REDUCED PRESSURE - MEASURES. <br /> Ea4 BACKFLOW ASSEMBLY -C CONDENSATE DRAIN I <br /> 41 1 For This Project To Include: Permit#: M2304-070 ONLINE APP <br /> E I b, -t PRESSURE RELIEF VALVE -1M- HEATING WATER SUPPLY <br /> ii r E 3 _� TEMPERATURE AND PRESSURE HEATING WATER RETURN Site Address: 2000 TOWER ST <br /> a 3 J SAFETY RELIEF VALVE p, D� I//-TT���_ A ■ . *_-.. <br /> SAFETY RELIEF VALVE TT AUTOMATICI AIRVENT/MANUgI El Plumbing El Sprinkler Owner: EVERETT COMMUNITY COLLEGE M01 EC LE ` :RE Lr� .Bc ry <br /> BALANCING/MEASURING Tenant: EVCC-MONTE CRISTO HALL&ANNEX MD1.0 EC E �+ /...SIT■■- A l <br /> r la VALVE <br /> AUTOMATIC FLOW CONTROL ❑ Mechanical ❑ Fire Alarm �i1 <br /> � ) TM VALVE App. Date: 4/20/2023 ¢ ` <br /> g APPROVED <br /> g <br /> Electrical Permit Type: MECHANICAL OCT 3 0 ? 3 I ` <br /> i <br /> Office of Community,Planning&Economic DevelopmE„� illSubtype: COMMERCIAL MECHANICAL(PLAN REVIEW u MECHANICAL LEGEND, <br /> $ PLANNfNG QEPARTMENT REQUIRED) ABBREVIATIONS,& <br /> 1 8 i ' GENERAL NOTES <br /> 1 ,(,_. . p..:r Description: Mechanical work related to Demolition of �.TT� ®� �� �g,p <br /> I i i NAME. (�/�j� ` �� ,.,e» t K Monte Cristo Hall&Annex Bldg Permit service 79D99 <br /> 2 1. pe p g+m p FOR <br /> PER <br /> My t -I /�l y.�, -( 28 NOVFa16ER 2022 <br /> 91� ag rL� 7; I $35� '3 PF'Gf 45 Si Reviewed B,• \_ _Date O�/S j(N - 4 <br /> E _ <br /> S <br /> yy 1- I <br /> NOT ALL SYMBOLS MAY <br /> 4 i �OfflCe Set __.lob Slte Jet APPEAR ON THE DRAWINGS AO.oA <br /> I i 6 11 _ A PERMIT SET <br /> I <br /> 1 ®xulcwmuxwc. <br />