My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2601 OAKES AVE 2023 Plans 2025-07-14
>
Address Records
>
OAKES AVE
>
2601
>
Plans
>
2601 OAKES AVE 2023 Plans 2025-07-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2025 1:06:43 PM
Creation date
6/27/2025 1:13:05 PM
Metadata
Fields
Template:
Address Document
Street Name
OAKES AVE
Street Number
2601
Permit
B2303-041
Year
2023
Notes
UNDERPINNING EXISTING 4 PLEX RESIDENCE FOUNDATION
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit#: B2303-041 <br /> Site Address: 2601 OAKES AVE <br /> Owner: GALE KEITH G&KIMBERLY S <br /> Tenant: <br /> GENERAL REQUIREMENTS SAFEBASE PUSH PIERS (CONT.) S. App.Date: 3/13/2023 <br /> REFER TO SUBSEQUENT PLAN AND DETAIL NOTES FOR VARIATIONS AND REQUIREMENTS SPECIFIC TO � a WASg IBC Proposed Use: PIN PILES/STRUCTURAL SLAB/ <br /> REFERENCED PROJECT. EXISTING UTILITY LINES: �� 40 FOUNDATION REPAIR <br /> CONTRACTOR TO REPAIR UTILITY LINES THAT MAY BE DAMAGED `� �2, Description: UNDERPINNING EXISTING 4 PLEX <br /> NOTES ON DRAWINGS TAKE PRECEDENCE OVER GENERAL STRUCTURAL NOTES. DURING INSTALLATION. �� / .ro; ��, RESIDENCE FOUNDATION <br /> DESIGN CRITERIA PUSH PIER SPLICING: „d :� <br /> PILES ARE TO BE GRAVITY SPLICED WITH FITTING COUPLERS. BUILDING 16` �40740 l Reviewed B�.� //'✓�-' Datecy <br /> ism ' .�� <br /> BUILDING CODE CONFORMANCE (MEETS OR EXCEEDS REQUIREMENTS): WEIGHT WILL ENSURE JOINTS DO NOT SEPARATE. <br /> s`SIONALyCs Office Set Job Site Set <br /> 2018 INTERNATIONAL BUILDING CODE (IBC) '�..----\,"�__'`---�`f <br /> 2018 INTERNATIONAL RESIDENTIAL CODE (IRC) TESTING & INSPECTION EXPIRES: 12/24/24 I Q <br /> 2018 WASHINGTON STATE BUILDING CODE U O <br /> 2018 WASHINGTON STATE RESIDENTIAL CODE CO INUOUS SPECIAL INSPECTI S REQUIRED DURING INSTALLATION PER 2018 IBC SECTION 1810.4.12. Z a <br /> E SPONSIBLE FOR VERIFYING AND RECORDING THE FOLLOWING: — D <br /> DEAD LOADS: Le ROOF DEAD LOAD 15 PSF • PROJECT DESCRIPTION (ADDRESS, INSTALLATION DATE, PERMIT NUMBER Cv <br /> FLOOR DEAD LOAD 15 PSF • PILE AND BRACKET CONFIGURATION < <br /> 0 t .3 <br /> WOOD WALL DEAD LOAD 12 PSF • PART DESCRIPTION (PRODUCT MANUFACTURER, BRACKET TYPE, PIER TYPE, PIER OUTSIDE DIAMETER, 0- _i o <br /> INTERIOR WOOD WALL DEAD LOAD 9 PSF PIER WALL THICKNESS) W W �- <br /> CONCRETE 150 PCF • PIER INCLINATION, LOCATION, DEPTH, AND INSTALLATION PRESSURE ACHIEVED CC °� LI N• a <br /> LIVE LOADS: LOAD TESTING SHALL BE PERFORMED IN ACCORDANCE WITH ASTM METHOD D1143 (QUICK METHOD) ON 20 z Z Q cos 0.o L a <br /> ROOF SNOW LOAD 25 PSF O Z Q Lii <br /> PERCENT OF PIERS AND WILL BE SELECTED BY THE SPECIAL INSPECTOR. AN ALIGNMENT LOAD (AL) SHALL I-- Z W 8 <br /> FLOOR LIVE LOAD (RESIDENTIAL) 40 PSF w .% <br /> BE APPLIED TO THE PILE PRIOR TO SETTING THE DEFLECTION MEASURING EQUIPMENT TO ZERO OR A Q Q ®„� <br /> REFERENCE POSITION. THE AL SHALL BE NO MORE THAN 10% OF THE DESIGN LOAD. INCREMENTAL a <br /> REFERENCE STANDARDS: O <br /> LOADING SHALL BE IN ACCORDANCE WITH THE FOLLOWING SCHEDULE. 0 W W124 _ <br /> CONFORM TO IBC CHAPTER 18 "SOILS & FOUNDATIONS" ° O cc m z <br /> TEST LOADING SCHEDULE HOLD TIME MAX DEFLECTION D N > a 01 0 z <br /> DESIGN SOIL VALUES: AL (.10 DL MAX) 0 MIN. W W 2 ¢ ' 3; <br /> ALLOWABLE FOUNDATION PRESSURE (ASSUMED) 1500 PSF 0.25 DL UNTIL STABLE O U E L <br /> 411 <br /> 0.50 DL UNTIL STABLE Z E <br /> SAFEBASE PUSH PIERS 0.75 DL UNTIL STABLE >" 0 <br /> 1.00 DL UNTIL STABLE LU 15 °' <br /> MATERIALS: 1.25 DL UNTIL STABLE W g Z <br /> BRACKET PLATES - ASTM A36 1.50 DL HOLD FOR CREEP TEST (SEE BELOW) 0.04 INCHES Q W o <br /> (MIN YIELD STRESS, Fy = 36 KSI / MIN TENSILE STRESS, Fu = 58 KSI) 1.25 DL UNTIL STABLE W <br /> PIER TUBES - ASTM A500 GRADE B OR C 1.00 DL UNTIL STABLE 2 Q <br /> (MIN YIELD STRESS, Fy = 50 KSI / MIN TENSILE STRESS, Fu = 55 KSI) 0.75 DL UNTIL STABLE 0 <br /> EXTERNAL SLEEVE - ASTM A500 GRADE B 0.50 DL UNTIL STABLE CITY OF EVERETT <br /> (MIN YIELD STRESS, Fy = 50 KSI / MIN TENSILE STRESS, Fu = 62 KSI) 0.25 DL- UNTIL STABLE REVIEWED FOR E MIT <br /> PIER CAP - ASTM A529 GRADE 50 <br /> (MIN YIELD STRESS, Fy = 50 KSI / MIN TENSILE STRESS, Fu = 65 KSI) LOAD TESTING CREEP ACCEPTANCE CRITERIA SHALL BE NO GREATER THAN 0.04 INCHES WITHIN A 10 GENERAL NOTES <br /> COIL ROD - ASTM A193 GRADE B7 MINUTE PERIOD. IF MOVEMENT IS OBSERVED GREATER THAN 0.04 INCHES WITHIN THE 10 MINUTE PERIOD <br /> (MIN YIELD STRESS, Fy = 105 KSI / MIN TENSILE STRESS, Fu = 125 KSI) THE LOAD TEST SHALL BE HELD FOR AN ADDITIONAL 50 MINUTES, THE PIER IS TO BE DEEPENED AND <br /> STEEL ANGLE SHAPES - ASTM A36 RE-TESTED, OR THE PIER IS TO BE ABANDONED AND REPLACED WITH A NEW PIER. IF THE LOAD TEST IS REVISIONS <br /> TO BE HELD THE PIER MOVEMENTS SHALL BE MEASURED AT 15, 20, 30 40, 50, AND 60 MINUTES. THE r 1 <br /> (MIN YIELD STRESS, Fy = 36 KSI / MIN TENSILE STRESS, Fu = 58 KSI) CREEP VERSUS THE LOGARITHM OF TIME SHALL BE PLOTTED. IF THE CREEP RATE IS LESS THAN 0.080 W N <br /> WELDING NOTES: INCHES BETWEEN 6 AND 60 MINUTES, THE LOAD TEST SHALL BE CONSIDERED SUCCESSFUL. Pg c'' °4 a) <br /> CONFORM TO AWS D1.1. WELDERS SHALL BE CERTIFIED IN ACCORDANCE WITH AWS REQUIREMENTS. USE o W v <br /> CV <br /> E70 ELECTRODES OF TYPE REQUIRED FOR MATERIALS TO BE WELDED. PUSH PIER TEST PRESSURE (PSI): [DESIGN LOAD] X 1.5 / [AREA OF HYDRAULIC RAM]. L-- <br /> CORROSION PROTECTION: PROJECT NO: W <br /> SACRIFICIAL DESIGN THICKNESS - CAPACITIES INCLUDE A SCHEDULED LOSS IN STEEL THICKNESS DUE TO �//// �//7// MFR22-280 cl. l'- <br /> I 7\ I DO NOT PLACE PIERS DESIGNED BY: V �- O <br /> CORROSION FOR BLACK, UNCOATED STEEL. ANCHORS ARE DESIGNED FOR 50-YEAR SCHEDULED SACRIFICIAL X� / \ THIS ZONE W/O DIRECTION BE Q a> <br /> THICKNESS LOSS IN ACCORDANCE WITH ICC-ES AC358. DRAWN BY: VV H a. <br /> INSTALLATION: DO NOT PLACE PIERS \ FROM ENGINEER BE 0 <br /> / CHECKED BY: ►�"� <br /> SYSTEM TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS. MINIMUM THIS ZONE ENGINEER DIRECTION \ / CONTRACTOR TO NOTIFY JLD,CVR I (� <br /> INSTALLATION PRESSURE IS TO BE DETERMINED BY THE FOLLOWING EQUATION: FROM FOR IF (E) FOUNDATION DATE:02.24.2023 <br /> CRACK IS PRESENT IN THE <br /> PUSH PIER INSTALLATION PRESSURE (PSI): [DESIGN LOAD] X 2 / [AREA OF SPAN BETWEEN FOUNDATION SHEET NO: <br /> BRACKETS <br /> HYDRAULIC RAM]. NO PIER PLACEMENT ZONE <br /> MINIMUM INSTALLATION DEPTH IS 10'-0„± UNO. 0 S1 .1 <br /> SCALE: NTS itIEDVIE <br /> NOTIFY ENGINEER IF MINIMUM INSTALLATION CONDITIONS CANNOT BE ACHIEVED. E <br /> MAR 13 2023 J <br /> CITY OF EVERETT <br /> Permit Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.