My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2730 W MARINE VIEW DR 2019 Plans 2025-06-27 (2)
>
Address Records
>
W MARINE VIEW DR
>
2730
>
Plans
>
2730 W MARINE VIEW DR 2019 Plans 2025-06-27 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2025 1:41:18 PM
Creation date
6/27/2025 1:40:59 PM
Metadata
Fields
Template:
Address Document
Street Name
W MARINE VIEW DR
Street Number
2730
Permit
PW1909-040
Year
2019
Notes
RETAINING WALL & FILL TO LEVEL LOT
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> FIELD CONSTRUCTION MANUAL- STONE TERRA <br /> EXCAVATION <br /> Confirm location and elevation of walls.Width of excavation should allow for width of wall base <br /> and drainpipe.Note: all excavation should follow applicable WISHA or OSHA guidelines.If the <br /> wall steps up one block in height,the base blocks should be installed at the lowest level in order <br /> to establish grade and face location of the second level. <br /> BASE PREPARATION <br /> Consult engineer's wall design for a base material specification including type,width, depth and <br /> compaction. It is recommended to start at lowest wall level. Locate the front face of the wall and <br /> run a string line one-inch in front of the face-two-inches above the base. Make sure the base <br /> material is well compacted. Test if necessary.After compacting,screed off base material,fill in <br /> low spots, and screed again.Repeat procedure as necessary to achieve firm,compacted base. <br /> Do not disturb string line.It is best to prepare the entire base before setting the blocks. <br /> LEVELING PAD <br /> SETTING BLOCKS <br /> Before placing blocks,make sure the top and bottom surfaces of the respective blocks are clean. <br /> At one end of the wall,or at one end of the lowest base elevation,start the wall.At the start of the <br /> wall,mark a line perpendicular to the face of the wall. This line will help place the first block <br /> square to the wall face.Place the first block one inch from the string line. Set the next block <br /> beside the first block, taking care to align the face. <br /> r--1i—k t-k r--, <br /> '1 <br /> LEVELING PAD <br /> GEOGRID <br /> MSE walls are walls that have geogrid material sandwiched between.each row of block. A <br /> maximum of two courses can be built before the wall must be backfilled. Start with the base <br /> course and lay the specified geogrid over the keyway of the blocks so that the grid reaches the <br /> face of the block,and covers the male keyway. Place the upper block over the grid,locking it <br />
The URL can be used to link to this page
Your browser does not support the video tag.