Laserfiche WebLink
10 of 23 <br /> Thursday, July 20, 2023 <br /> JOB PHOTOS <br /> - <br /> - i% I <br /> R + <br /> Helical piles 41-3 will be placed along the North side of Helical piles 114-5v will be installed here along the East side <br /> home's foundation.Crew will need to remove and of home's foundation.Crew will lay plastic out for all <br /> replace 8 2x2 sections in slab walkway at the excavated soils and debris.Crew will attempt to match <br /> designated locations specified on the elevation map to concrete finish to the best of there abilities. <br /> drill and mount helical piles to home's foundation. <br /> i <br /> 1•s• • �� <br /> W7 <br /> 'a�b W!, <br /> Picture for reference. Homeowner will need to clear furniture out and remove <br /> Flooring to expose interior slab at the highlighted locations. <br /> Crew will drill 3/8"every 2'-3'to allow crew to inject a <br /> polyurethane foam to lift and void fill to maximum <br /> allowable recovery. <br /> Photographs provided by R&R Foundation Specialists. Note that analysis assumptions such as <br /> building geometry, tributary areas, and loading were determined through examination of these <br /> photographs and industry knowledge of standard construction practices. - L120 <br />