CENTER LEFT RIGHT . A&R SCOPE WYPA,
<br /> SYNERGY UNITS _
<br /> STRING-1 STRING-2 STRING-3 STRING-4 STRING-5 STRING-6 STRING-7 STRING-8 STRING-9
<br /> 18 18 20 18 20 20 22 21 22
<br /> EXISTING OR ASERSOL_AR
<br /> .0-0 MODULES MODULES MODULES MODULES MODULES MODULES MODULES MODULES MODULES OTHER SCOPE
<br /> 3211 Martin Luther King Jr Way S.
<br /> Seattle,WA 98144(206)707-9937
<br /> I% u u o 0 0 0 0 o II I
<br /> ( ) TO UTILITY TRANSFORMER
<br /> (TYP•)
<br /> f'
<br /> q\—:1)
<br /> • ROOFTOP 4...
<br /> ( ) ELECTRICAL800A3P ROOM THIS DRAWING CONSTITUTES THE
<br /> / , ---- --- --- -----_---------- / / CONFFIDENTIAL INFORMATION OF A&R SOLAR
<br /> GATEWAYMCB AND ITS RECEPTOR POSSESSION DOES NOT
<br /> (TYP.) - IN 1_ERNET CONFER ANY RIGHT IN OR LICENSE TO USE IT
<br /> DC Disconnect DC Disconnect (PROVIDED BY OTHERS) OR THE INFORMATTION DISCLOSED HERE IN
<br /> NOR ANY RIGHT TO REPRODUCE THIS
<br /> DRAWING OR ANY PART HERE IN WITHOUT
<br /> �� + N +� N THE WRITTEN CONSENT OF A&R SOLAR.
<br /> D 225A/3P
<br /> � RACEWAY (FROM ROOF STUD-UP TO --
<br /> / \ ( ) ( ) A ELECTRICAL ROOM) TO BE DONE BY OTHERS z M
<br /> 00
<br /> (50A/3P 175A/3P 1200A PANEL BHP1A F.. U Cr)
<br /> D 208/120V 3P, 4W Z U D I
<br /> \ 35,725 AFC W I
<br /> 35K AIC 7 65,000 AIC
<br /> ( ) 0 I off
<br /> 0
<br /> E UIPMENT SCHEDULE m' Z, CC Q w
<br /> Q U) '—I (—
<br /> Electrical Schedule/ BOM 35K AIC W U Q
<br /> Ref. Category Equipment QTY ZZ i z
<br /> 1 Modules Q.Peak DUO XL-G10.2 475 179 •• w
<br /> 0 cC �
<br /> 2 Optimizers P960 SolarEdge Dual Optimizer 94 Output AC # of U co O 1
<br /> 3 Jbox Jbox TBD Watts (w) — OCPDco cC
<br /> 4 Inverters SolarEdge SE14.4KUS 1 Inverter Specs (A) Voltage Inverters
<br /> 5 Inverters SolarEdge SE5OKUS 1 SolarEdge SE5OKUS 50000 139.5 208 1 175 0i—I Q w
<br /> 6 LoadCenters MLO, 200A, 208V, 3ph, Nema 1, 35K AIC 1 SolarEdge SE14.4KUS 14400 40 208 1 50 LL NI
<br /> w o
<br /> 7 Disconnect 400A 600V 3 Pole I Heavy Duty, Fuse, Lockable, 35K AIC 1 ****N/A**** 0 0 0 0 0 a co
<br /> DisconnectFuse FLNR - 225 A Fuses for Disconnect (qty 1/pole) 3 Module Specs Watts (w) Imp Vmp Voc Isc
<br /> Monitoring SolarEdge Integrated (inverter) Monitoring 1 Q.Peak DUO XL-G10.2 475 475 I 10.66 44.54 53.58 11.24
<br /> Breakers 50A/3P, 208V, 35k AIC 1 i l REVISIONS
<br /> - Temp. Adjusted 0 0 40.8 57.9 0 REV. # DATE:
<br /> Breakers 175A/3P, 208V, 35k AIC 1 — o Oct 26, 2021
<br /> Breakers 225A/3P, 208V, 65k AIC 1 } PROVIDED 1 May 17, 2022
<br /> A CONDUCTOR SCHEDULE BY OTHERS 2 J08, 2023 SINGLE LINE-BUILDING B 3 ]aann 05, 202
<br /> Summary Distance (ft) Current Operating Voltage Volt. Drop NTS
<br /> @125% Voltage Drop (total)
<br /> A (2)#10 CU, (1)#10 EGC, PV Wire 600V, AIR 150 22.5A 600V 0.98% GENERAL NOTES:
<br /> B (10)#10 CU, (1)#10 EGC,THWN-2, 1.25"EMT(min) 90 22.5A 600V 0.59% 1.54% DC UTILITY: SNOPUD DESIGNED: DANIEL H.
<br /> C (3)4/0 AL, (1)#6 N, (1)#6 EGC, THWN-2, 2"EMT(min) 10 174.38A 208V 0.12% 1. EGC WHERE EXPOSED TO PHYSICAL DAMAGE WILL BE PM: ANDREW HOULE
<br /> D (3)#6 AL, (1)#10 N, (1)#10 EGC, THWN-2, 0.75"EMT(min) 10 50A 208V 0.27% 6AWG BARE CU CELL: (262) 331-0485
<br /> E (3)300 AL, (1)#4 N, (1)#4 EGC, THWN-2, 2.5"EMT(min) 10 224.38A 208V 0.11% 2. IF INSTALLING CONDUIT ON ROOF, MAINTAIN GREATER E1.2 SINGLE LINE-
<br /> , THAN 7/8" ABOVE SURFACE
<br /> F (3)300 AL, (1)#4 N, (1)#4 EGC, THWN-2, 2.5"EMT(min) 15 224.38A 208V 0.16% 0.66%AC 3. NEC 690.12: RAPID SHUTDOWN INITIATED BY LOSS OF BUILDING B
<br /> GRID OR AC DISCONNECT