Laserfiche WebLink
CENTER LEFT RIGHT . A&R SCOPE WYPA, <br /> SYNERGY UNITS _ <br /> STRING-1 STRING-2 STRING-3 STRING-4 STRING-5 STRING-6 STRING-7 STRING-8 STRING-9 <br /> 18 18 20 18 20 20 22 21 22 <br /> EXISTING OR ASERSOL_AR <br /> .0-0 MODULES MODULES MODULES MODULES MODULES MODULES MODULES MODULES MODULES OTHER SCOPE <br /> 3211 Martin Luther King Jr Way S. <br /> Seattle,WA 98144(206)707-9937 <br /> I% u u o 0 0 0 0 o II I <br /> ( ) TO UTILITY TRANSFORMER <br /> (TYP•) <br /> f' <br /> q\—:1) <br /> • ROOFTOP 4... <br /> ( ) ELECTRICAL800A3P ROOM THIS DRAWING CONSTITUTES THE <br /> / , ---- --- --- -----_---------- / / CONFFIDENTIAL INFORMATION OF A&R SOLAR <br /> GATEWAYMCB AND ITS RECEPTOR POSSESSION DOES NOT <br /> (TYP.) - IN 1_ERNET CONFER ANY RIGHT IN OR LICENSE TO USE IT <br /> DC Disconnect DC Disconnect (PROVIDED BY OTHERS) OR THE INFORMATTION DISCLOSED HERE IN <br /> NOR ANY RIGHT TO REPRODUCE THIS <br /> DRAWING OR ANY PART HERE IN WITHOUT <br /> �� + N +� N THE WRITTEN CONSENT OF A&R SOLAR. <br /> D 225A/3P <br /> � RACEWAY (FROM ROOF STUD-UP TO -- <br /> / \ ( ) ( ) A ELECTRICAL ROOM) TO BE DONE BY OTHERS z M <br /> 00 <br /> (50A/3P 175A/3P 1200A PANEL BHP1A F.. U Cr) <br /> D 208/120V 3P, 4W Z U D I <br /> \ 35,725 AFC W I <br /> 35K AIC 7 65,000 AIC <br /> ( ) 0 I off <br /> 0 <br /> E UIPMENT SCHEDULE m' Z, CC Q w <br /> Q U) '—I (— <br /> Electrical Schedule/ BOM 35K AIC W U Q <br /> Ref. Category Equipment QTY ZZ i z <br /> 1 Modules Q.Peak DUO XL-G10.2 475 179 •• w <br /> 0 cC � <br /> 2 Optimizers P960 SolarEdge Dual Optimizer 94 Output AC # of U co O 1 <br /> 3 Jbox Jbox TBD Watts (w) — OCPDco cC <br /> 4 Inverters SolarEdge SE14.4KUS 1 Inverter Specs (A) Voltage Inverters <br /> 5 Inverters SolarEdge SE5OKUS 1 SolarEdge SE5OKUS 50000 139.5 208 1 175 0i—I Q w <br /> 6 LoadCenters MLO, 200A, 208V, 3ph, Nema 1, 35K AIC 1 SolarEdge SE14.4KUS 14400 40 208 1 50 LL NI <br /> w o <br /> 7 Disconnect 400A 600V 3 Pole I Heavy Duty, Fuse, Lockable, 35K AIC 1 ****N/A**** 0 0 0 0 0 a co <br /> DisconnectFuse FLNR - 225 A Fuses for Disconnect (qty 1/pole) 3 Module Specs Watts (w) Imp Vmp Voc Isc <br /> Monitoring SolarEdge Integrated (inverter) Monitoring 1 Q.Peak DUO XL-G10.2 475 475 I 10.66 44.54 53.58 11.24 <br /> Breakers 50A/3P, 208V, 35k AIC 1 i l REVISIONS <br /> - Temp. Adjusted 0 0 40.8 57.9 0 REV. # DATE: <br /> Breakers 175A/3P, 208V, 35k AIC 1 — o Oct 26, 2021 <br /> Breakers 225A/3P, 208V, 65k AIC 1 } PROVIDED 1 May 17, 2022 <br /> A CONDUCTOR SCHEDULE BY OTHERS 2 J08, 2023 SINGLE LINE-BUILDING B 3 ]aann 05, 202 <br /> Summary Distance (ft) Current Operating Voltage Volt. Drop NTS <br /> @125% Voltage Drop (total) <br /> A (2)#10 CU, (1)#10 EGC, PV Wire 600V, AIR 150 22.5A 600V 0.98% GENERAL NOTES: <br /> B (10)#10 CU, (1)#10 EGC,THWN-2, 1.25"EMT(min) 90 22.5A 600V 0.59% 1.54% DC UTILITY: SNOPUD DESIGNED: DANIEL H. <br /> C (3)4/0 AL, (1)#6 N, (1)#6 EGC, THWN-2, 2"EMT(min) 10 174.38A 208V 0.12% 1. EGC WHERE EXPOSED TO PHYSICAL DAMAGE WILL BE PM: ANDREW HOULE <br /> D (3)#6 AL, (1)#10 N, (1)#10 EGC, THWN-2, 0.75"EMT(min) 10 50A 208V 0.27% 6AWG BARE CU CELL: (262) 331-0485 <br /> E (3)300 AL, (1)#4 N, (1)#4 EGC, THWN-2, 2.5"EMT(min) 10 224.38A 208V 0.11% 2. IF INSTALLING CONDUIT ON ROOF, MAINTAIN GREATER E1.2 SINGLE LINE- <br /> , THAN 7/8" ABOVE SURFACE <br /> F (3)300 AL, (1)#4 N, (1)#4 EGC, THWN-2, 2.5"EMT(min) 15 224.38A 208V 0.16% 0.66%AC 3. NEC 690.12: RAPID SHUTDOWN INITIATED BY LOSS OF BUILDING B <br /> GRID OR AC DISCONNECT <br />