My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11622 SILVER LAKE RD 2023 Plans 2025-07-18
>
Address Records
>
SILVER LAKE RD
>
11622
>
Plans
>
11622 SILVER LAKE RD 2023 Plans 2025-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 3:37:09 PM
Creation date
7/1/2025 11:57:36 AM
Metadata
Fields
Template:
Address Document
Street Name
SILVER LAKE RD
Street Number
11622
Permit
B2305-012
Year
2023
Notes
REPLACE EXISTING MANUFACTURED HOME W/ NEW MANUFACTURED HOME
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> Diagonal and vertical ties • <br /> • <br /> 1H11 <br /> • <br /> • <br /> `T <br /> • <br /> Main beam --- Vertical tie • <br /> =0°-50° strapping <br /> Anchor aligned. <br /> with resultant of'---- <br /> combined forces <br /> • <br /> •; ��`•••r,\\•••�`• :� • :\A' • fit•'. <br /> '•• •��` �f 3 �r' 4.5• - ,fit ,'t •\�•'•`,�� <br /> Note- ��'•' <br /> gr <br /> 1. All anchoring parts must be certified to a 4,725-pound capacity. <br /> 2. The ground anchors must be sized in accordance with the direction of the load <br /> • <br /> and the type of soil. <br /> 3. The ground anchors'augers must be installed below the frost line. <br /> 4. Ground anchors may be installed vertically if either a t 0-inch x 18-inch(at a minimum) <br /> concrete collar or an approved metal stabilizing device is installed. • <br /> • <br /> • <br /> Picture 5-4--Proper alignment of straps and anchors . <br />
The URL can be used to link to this page
Your browser does not support the video tag.