My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fidalgo Paving & Construction LLC 7/2/2025
>
Contracts
>
Small Works Roster Contracts and Change Orders
>
Small Works Roster Contracts and Change Orders
>
Fidalgo Paving & Construction LLC 7/2/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 9:33:50 AM
Creation date
7/3/2025 9:33:37 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Fidalgo Paving & Construction LLC
Approval Date
7/2/2025
End Date
7/31/2025
Department
Finance
Department Project Manager
Jenny Chang
Subject / Project Title
Forest Park Entry Driveway Repave Project
Tracking Number
0004864
Total Compensation
$34,069.00
Contract Type
Small Works Roster Contracts and Change Orders
Contract Subtype
Small Works Roster Contracts and Change Orders
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Small Works Contract - 1 <br />SMALL WORKS CONTRACT <br /> <br />THIS CONTRACT is dated and effective as of the date of the Mayor’s signature below and is by <br />and between the City of Everett, a Washington municipal corporation (the “City”), and the Contractor <br />shown below in the Basic Provisions. <br /> <br />1. Basic Provisions: <br />Solicitation Name 2025-029 Forest Park Entry Driveway Repave Project <br />Brief Description of <br />Work <br />Area of resurfacing being 10’ x 500’ +/- 556 SY of grind, 65 tons HMA for a 2” <br />grind and repave. <br />Contractor <br />Fidalgo Paving & Construction LLC <br />16825 45 Road <br />Arlington, WA 98223 <br />office@fidalgopaving.com <br />City <br />Project <br />Manager <br />Lolly Huggins <br />City of Everett – Parks and Facilities <br />802 E Mukilteo Boulevard <br />Everett, WA 98203 lhuggins@everettwa.gov <br />Contract Time The Work shall be physically complete in all respects within 45 calendar days <br />from the date of issuance of the Notice to Proceed. <br />Contract Price $34,069.00 <br />Contract <br />Documents <br />The following documents (“Contract Documents”) are incorporated by <br />reference and are hereby made a part of this Contract: this Contract <br />document; Invitation for Quote and addenda thereto, including without <br />limitation any Instructions, General Conditions, Specifications, <br />Contractor Commitment and Information, Price Sheet, Certification of <br />Compliance, Minority Business Certification, Contractor References, and <br />any other document included in the Invitation to Quote ; change orders; <br />all provisions required by law, and the following document(s), if any: <br />N/A <br />Contractor’s response to the solicitation is a Contract Document, but only <br />
The URL can be used to link to this page
Your browser does not support the video tag.