My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
E-mail from Rich Carlson dated 4.18.25 <br />Novo <br />Top of the morning bud, Hopefully this beats you to the office! <br />The refined estimate is below. Not cut in half but this is getting pretty lean, ~$4,000 per <br />building on average is tight. CA # is periodic monitoring as needed so it didn't change <br />much. Our fee is typically T&M NTE so we only bill for what we actually use. <br />Task 1 - Inspection and Design <br />AHERA Building inspection $16,000 <br />Report Development $10,000 <br />Preparation of Summary of Hazmat Requirements $6,000 <br />Preparation of Abatement Drawings $10,000 <br />Cost estimate $1,500 <br />QC/review $1,500 <br />Lab Analysis (Asbestos) $12,000 <br />Lab Analysis (lead paint) $2,000 <br />Lab Analysis (other) $1,000 <br />Sub-Total Task 1 - $60,000 <br />Task 2 - Periodic Abatement Monitoring and Administration <br />Project Management $14,000 <br />On site monitoring $14,000 <br />Lab Analysis (bulk / air, etc) $2,000 <br />Sub-Total Task 2 - $30,000 <br />Total Tasks 1 & 2 - $90,000 <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.