My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
3 <br />Progressive Design Build General Conditions <br /> <br />executed by both the Owner and Design-Builder, as part of the design review process <br />contemplated by Section 2.4 of these General Conditions of Contract. <br />1.2.13 Construction General Conditions Price is defined or described in Section 7.4 of the <br />Contract for the performance of the Construction General Conditions Work. <br />1.2.14 Construction General Conditions Work includes all work set forth in Exhibit D to the <br />Contract. <br />1.2.15 Contract refers to the Progressive Design-Build Contract between Owner and Design- <br />Builder for the Everett Outdoor Event Center (Modified DBIA 544), as negotiated. <br />1.2.16 Contract Documents are as defined in Article 3 of the Contract. <br />1.2.17 Contract Price is defined or described in Section 2.3.1.1 of the Contract. <br />1.2.18 Contract Time(s) are the dates for Substantial Completion and Final Completion set forth <br />in, or calculable from, Article 6 of the Contract. <br />1.2.19 Cost of the Phase 2 Work is defined or described in Section 7.6 of the Contract. <br />1.2.20 Day or Days shall mean calendar days unless otherwise specifically noted in the Contract <br />Documents. <br />1.2.21 Design-Build Team is comprised of the Design-Builder, the Design Consultant (Engineer <br />of Record), and Key Subcontractors (Key Firms) identified by the Design-Builder in its proposal in <br />response to the Owner’s Request for Proposals. The Key Firms are identified in Section 10.4 of <br />the Contract. <br />1.2.22 Design-Builder is Bayley Construction, LP. <br />1.2.23 Design-Builder’s Contingency is defined or described in Section 7.7.2 of the Contract. <br />1.2.24 Design-Build Fee is defined or described in Section 7.5 of the Contract. <br />1.2.25 Design-Builder’s Representative is defined or described in Section 10.2.2 of the Contract. <br />1.2.26 Design-Builder’s Principal-In-Charge is defined or described in Section 10.2.1 of the <br />Contract. <br />1.2.27 Design Consultant and/or Engineer of Record is Key Team Member procured as part of <br />the Design Builder’s Team, a licensed design professional or employed or retained to furnish <br />design services required under this Contract. A Design Sub-Consultant is a qualified, licensed <br />design professional who is not an employee of the Design Consultant but is retained by the <br />Design Consultant or employed or retained by anyone under contract to Design Consultant, to <br />furnish design services required under the Contract Documents. The Engineer of Record shall be <br />a professional engineer licensed in the state of Washington. <br />1.2.28 Differing Site Conditions are defined or described in Section 4.2.1 of these General <br />Conditions of Contract. <br />1.2.29 Electronic Data is defined or described in Section 12.1.1 of these General Conditions of <br />Contract. <br />1.2.30 Final Application for Payment is defined or described in Section 6.6 of these General
The URL can be used to link to this page
Your browser does not support the video tag.