My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
11 <br />Progressive Design Build General Conditions <br /> <br />Prevailing Wages on file with the public agency in accordance with RCW 39.12.04”. Each invoice <br />shall list sales tax as a separate line item. <br />Retainage shall be held by Owner in accordance with Chapter 60.28 RCW. <br />For projects over $10,000, the Design-Builder must post an approved copy of the Statement of <br />Intent, (listing the labor classification and wages used on the project) at the job site. In the event <br />the Statement of Intent has not been approved by the Department of Labor & Industries before <br />work begins, the complete listing of prevailing wage rates for that Owner may be posted and <br />distributed in lieu of the approved Statement of Intent. <br />The Design-Builder shall, within ten days after it receives a written request, file a certified copy of <br />the payroll records with Owner. <br />Upon completion of work, the Design-Builder and each and every Subcontractor (subject to pay <br />prevailing wage) shall file a sworn "AFFIDAVIT OF WAGES PAID" (L&I Form #F700-007-000) <br />with the Department of Labor and Industries certifying the rate of hourly wages paid each <br />classification of laborers, workers, or mechanics employed upon the work by the Design-Builder <br />or subcontractor which shall be not less than the prevailing rate of wage. Fringe benefits for each <br />job classification to be utilized shall also be included. <br />Upon completion of this contract, Owner must receive from the Design-Builder and each and <br />every Subcontractor (subject to prevailing wage) a copy of the "Affidavit of Wages Paid" approved <br />by the State Department of Labor & Industries. Retainage, or Bond, will be released upon receipt <br />of all necessary documentation (including but not limited to releases from the Department of <br />Labor & Industries, Department of Employment Security and, when applicable, Department of <br />Revenue), the settlement of any liens, and in accordance with Chapter 60.28 of the Revised <br />Code of Washington. <br />Owner is required by RCW 39.12.030 to include a provision stating the required prevailing rate(s) <br />in the solicitation and contract documents. To comply with this requirement, Owner is providing <br />the following applicable prevailing wage rate information: <br />A. State of Washington prevailing wage rates published by the Washington State <br />Department of Labor and Industries (L&I) are obtainable from the L&I website address: <br />https://www.lni.wa.gov/licensing-permits/public-works-projects/prevailing-wage-rates/ <br />B. The effective prevailing wage date is the same date as the Execution Date of the GMP <br />Amendment. <br />A copy of the applicable prevailing wage rates are also available for viewing at Owner’s office <br />located at City of Everett, 2930 Wetmore Ave, Everett, WA and the City will mail a hard copy of <br />the prevailing wage rates upon written request received within seven days of the Proposal <br />Submittal Date. <br /> Upon request, Owner will mail a hard copy of the applicable prevailing wage rates for this Project. <br />2.8 Design-Builder’s Responsibility for Project Safety. <br />2.8.1 Design-Builder recognizes the importance of performing the Work in a safe manner so as <br />to prevent damage, injury or loss to (i) all individuals at the Site, whether working or visiting, (ii) <br />the Work, including materials and equipment incorporated into the Work or stored on-Site or off- <br />Site, and (iii) all other property at the Site or adjacent thereto. Design-Builder assumes <br />responsibility for implementing and monitoring all safety precautions and programs related to the
The URL can be used to link to this page
Your browser does not support the video tag.