My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
14 <br />Progressive Design Build General Conditions <br /> <br />2.12 Apprenticeship. <br />2.12.1 Apprentice Utilization. This Contract includes an Apprentice Utilization Requirement. <br />Fifteen percent or more of project Labor Hours shall be performed by Apprentices unless Good <br />Faith Efforts are accepted. Apprentice Utilization will be determined using the Department of <br />Labor and Industries (L&I) online Prevailing Wage Intent & Affidavit (PWIA) system. <br />2.12.2 Electronic Reporting. The Design-Builder shall use the PWIA System to submit the <br />“Apprentice Utilization Plan”. Reporting instructions are available in the application. <br />2.12.3 Apprentice Utilization Plan. The Design-Builder shall submit an “Apprentice Utilization <br />Plan” by filling out the Apprentice Utilization Plan Form (WSDOT Form 424-004 or other form <br />approved by the City) within 30 calendar days of Contract execution, however no later than the <br />preconstruction meeting, demonstrating how and when they intend to achieve the Apprentice <br />Utilization Requirement. The Plan shall be in sufficient detail for the City to track the Design- <br />Builder’s progress in meeting the utilization requirements. An Apprentice Utilization Plan shall be <br />updated and resubmitted as the Work progresses or when requested by the City. <br />If the Design-Builder is unable to demonstrate the ability to meet the Apprentice Utilization <br />Requirement with their initial Apprentice Utilization Plan submission, an effort must be made to <br />find additional registered apprentices to perform on the contract. If after attempts have been <br />made at every tier and every scope, the Design-Builder must submit GFE documentation to the <br />City. The Design-Builder shall actively seek out opportunities to meet the Apprentice Utilization <br />Requirement during the construction Work. <br />2.12.4 Contacts. The Design-Builder may obtain information on State-approved Apprenticeship <br />Training Programs by using the Apprentice Registration and Tracking System (ARTS) <br />https://secure.lni.wa.gov/arts-public/#/program-search or contacting the Department of Labor and <br />Industries directly at: <br />Specialty Compliance and Services Division, Apprenticeship Section, P.O. Box 44530, Olympia, <br />WA 98504-4530 or by phone at (360) 902-5320. <br />2.12.5 Compliance. The Design-Builder is expected to make attempts to employ Apprentices <br />and shall include the requirement in any subcontracts at any tier. In the event that the Design- <br />Builder is unable to achieve the Apprentice Utilization Requirement, the Design-Builder shall <br />submit GFE documentation demonstrating the efforts and attempts they made. Final GFE <br />documentation shall be submitted to the City after Substantial Completion but no later than 30 <br />days after Physical Completion. <br />If the Design-Builder fails to actively attempt to employ Apprentices, submit GFE documentation, <br />or if the Engineer does not approve the GFE, the Design-Builder will be assessed a penalty. The <br />City will provide the Design-Builder with a written notice at Final Acceptance of the project <br />informing the Design-Builder of the failure to comply with the Apprentice Utilization Requirement <br />which will include a calculation of the penalty to be assessed as provided for in the Payment <br />section in this special provision. <br />2.12.6 Good Faith Efforts. The GFE shall document the attempts (efforts) the Design-Builder <br />(and any subcontractor at any tier) made to meet the Apprentice Utilization Requirement. Emails, <br />letters, or other written communications with letterhead, titles, and contact information are <br />required. <br />Documentation must include one or more of the following accepted GFEs: <br />1. Demonstrated Lack of Availability of Apprentices. Correspondence from State-
The URL can be used to link to this page
Your browser does not support the video tag.