Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
19 <br />Progressive Design Build General Conditions <br /> <br /> <br />4.1.8.3 WORKING HOURS: No hazardous materials work shall occur when building <br />users have access to work areas. Schedule all hazardous materials work to occur in <br />accordance with schedule requirements outlined elsewhere in the Contract Documents, <br />and when work areas have been vacated by building users. <br /> <br />4.1.8.4 EMERGENCY CONTACTS: Designated qualified representatives of the <br />Design-Builder and specific hazardous materials Subcontractors are to be available on a <br />24-hour emergency basis for the duration of the Work. Provide contact information to <br />Owner’s Representative for inclusion in the Project emergency contact list. <br /> <br />4.1.8.5 GENERAL HAZARDOUS MATERIALS SUBMITTALS: Design-Builder shall <br />review the scope of work and submittal requirements outlined in the Contract Documents. <br />Design-Builder shall submit and require all subcontractors performing the work of <br />handling or disposing of any hazardous materials to submit, pertinent information <br />required by the Contract Documents. Examples of work and impact may include <br />abatement, demolition, saw cutting, roto-hammering, welding, sanding, drilling, scraping <br />or other remodeling and metals-related impact, impact of asbestos-containing joint <br />compound or other material with <1% asbestos, PCB ballast removal or light tube <br />removal and disposal. <br /> <br />4.1.8.6 REGULATIONS, LAWS, and ORDINANCES: Design-Builder shall comply <br />with all applicable regulations, laws and ordinances concerning the impact, removal, <br />handling, storage, disposal, monitoring and protection against exposure or environmental <br />pollution related to hazardous or regulated materials and conditions. Impacts to <br />hazardous or regulated materials that may be required by the Work may include, but are <br />not limited to: manual demolition, mechanical demolition, cutting, sawing, drilling, <br />sanding, scraping, welding, power-washing or torch-cutting. Confirm required impacts <br />with other applicable specification sections and drawing sheets. Design-Builder shall <br />furnish all labor, materials, equipment, services, and insurance that is specified, shown, <br />or reasonably implied for the removal and handling of hazardous materials as part of the <br />Work. <br /> <br />4.2 Differing Site Conditions. <br />4.2.1 Differing Site Conditions. If Design Builder encounters conditions that were concealed <br />physical conditions that could not have reasonably been discovered, which differ materially from <br />those indicated in the Validation Report, Contract Documents, or unknown physical conditions of <br />an unusual nature which differ materially from those ordinarily found to exist and generally <br />recognized as inherent in construction activities of the character provided for in the Contract <br />Documents (collectively, a “Differing Site Condition”), then Design Builder shall give written notice <br />to Owner within 24 hours after becoming aware of or having encountered such condition. Design- <br />Builder shall not perform any Work in connection therewith (except for an emergency) until receipt <br />of written order to do so. After receipt of such written notice, Owner will promptly review the <br />pertinent condition. <br />4.2.2 Possible GMP and Contract Time Adjustments <br />4.2.2.1 If Design-Builder seeks to have the GMP or the Contract Time, or both, adjusted <br />due to the existence of a Differing Site Condition, Design-Builder shall comply with the <br />provisions of Article 9 in addition to the requirements of this Section 4.2. <br />4.2.2.2 Design-Builder shall not be entitled to any adjustment in the Contract Price or <br />Contract Time if:
The URL can be used to link to this page
Your browser does not support the video tag.