My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
21 <br />Progressive Design Build General Conditions <br /> <br />6.3 Withholding of Payments. <br />6.3.1 On or before the date established in the Contract, Owner shall pay Design-Builder all <br />amounts properly due, less statutory retainage. If Owner determines that Design-Builder is not <br />entitled to all or part of an Application for Payment because of Design-Builder’s failure to meet its <br />obligations hereunder, it will notify Design-Builder in writing at least five (5) days prior to the date <br />payment is due. The notice shall indicate the specific amounts Owner intends to withhold, the <br />reasons and contractual basis for the withholding, and the specific measures Design-Builder must <br />take to rectify Owner’s concerns. Design-Builder and Owner will attempt to resolve Owner’s <br />concerns prior to the date payment is due. If the parties cannot resolve such concerns, Design- <br />Builder may pursue its rights under the Contract Documents, to resubmit disputed amounts. <br />6.3.2 Notwithstanding anything to the contrary in the Contract Documents, Owner shall pay <br />Design-Builder all undisputed amounts in an Application for Payment within the times required by <br />the Contract. <br />6.4 Design-Builder’s Payment Obligations. <br />6.4.1 Design-Builder will pay Design Consultants and Subcontractors, in accordance with its <br />contractual obligations to such parties, all the amounts Design-Builder has received from Owner <br />on account of their work. Design-Builder will impose similar requirements on Design Consultants <br />and Subcontractors to pay those parties with whom they have contracted. Design-Builder will <br />indemnify and defend Owner against any claims for payment and mechanic’s liens as set forth in <br />Section 7.3 hereof. <br />6.5 Substantial Completion. <br />6.5.1 Design-Builder shall notify Owner when it believes the Work, or to the extent permitted in <br />the Contract Documents, a portion of the Work, is Substantially Complete. Within five (5) days of <br />Owner’s receipt of Design-Builder’s notice (and all required documents and information), Owner <br />and Design-Builder will jointly inspect such Work to verify that it is Substantially Complete in <br />accordance with the requirements of the Contract Documents. If such Work is Substantially <br />Complete, Owner shall prepare and issue a Certificate of Substantial Completion that will set forth <br />(i) the date of Substantial Completion of the Work or portion thereof, (ii) the remaining items of <br />Work that have to be completed before final payment, (iii) provisions (to the extent not already <br />provided in the Contract Documents) establishing Owner’s and Design-Builder’s responsibility for <br />the Project’s security, maintenance, utilities and insurance pending final payment, and (iv) an <br />acknowledgment that warranties commence to run on the date of Substantial Completion, except <br />as may otherwise be noted in the Certificate of Substantial Completion. Design-Builder’s notice <br />shall include the following documents and information: <br />6.5.1.1 An affidavit certifying that there are no claims, obligations or liens outstanding or <br />unsatisfied for labor, services, material, equipment, taxes or other items performed, <br />furnished or incurred for or in connection with the Work through the date of the notice <br />which will in any way affect Owner’s interests; <br />6.5.1.2 All operating manuals, warranties, record documents and other deliverables <br />required by the Contract Documents; and <br />6.5.1.3 A signed and stamped set of all calculations supporting the design of the Project. <br />6.5.2 Upon Substantial Completion of the entire Work or, if applicable, any portion of the Work, <br />Owner shall release to Design-Builder all retained amounts relating, as applicable, to the entire <br />Work or completed portion of the Work, less an amount equal to the reasonable value of all
The URL can be used to link to this page
Your browser does not support the video tag.