Laserfiche WebLink
23 <br />Progressive Design Build Contract <br />In executing this Contract, Design-Builder declares under penalty of perjury under the law of Washington <br />and in accordance with RCW 39.04.350(2) that within the three-year period (or five-year period, if required <br />by City of Everett ordinance) immediately preceding the date of the Request for Qualifications issued in this <br />matter, it has not been determined by a final and binding citation and notice of assessment issued by the <br />department of labor and industries or through a civil judgment entered by a court of limited or general <br />jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of chapter 49.46, 49.48, <br />or 49.52 RCW. <br />This Contract may be signed with AdobeSign, which is fully binding. <br />OWNER: DESIGN-BUILDER: <br />CITY OF EVERETT BAYLEY CONSTRUCTION LP <br />Cassie Franklin, Mayor <br />Date: Date: <br />Attest: <br />_______________________________ <br />OFFICE OF THE CITY CLERK <br />Stephen Grasso, Chief Executive Officer <br />Stephen Grasso <br />06/18/202506/18/2025