Laserfiche WebLink
Program Summary <br />Everett Multipurpose Stadium <br />Everett, WA <br />March 2025 <br />8.0 PLAYING FIELD FACILITIES <br />Class <br />No.Space Type Units SF Total SF Description MLB Req'd <br />8.1 PLAYING FIELD 125,000 125,000 <br />8.1.1 Playing Field 1 125,000 Provide drainage and infrastructure for change overs.125,000 <br />8.1.2 Playing Field Dimensions Comply with NAPBL minimums: 325' at foul poles, 400' at center field. <br />8.1.3 Field Wall Minimum 8' tall, padding. Make outfield wall unique. <br />8.2 BULLPENS 2,400 2,400 <br />8.2.1 Bullpens 2 1,200 2,400 Provide based on PDL requirements, covered seating area.2,400 <br />8.2.2 Bullpen Toilets 0 80 0 Provide adjacent to bullpens if too remote from dugouts. <br />8.3 DUGOUTS 2,560 2,280 <br />8.3.1 Dugouts 2 1,000 2,000 Each to include 45-person bench, bat/helmet rack, elec. water cooler, house phone.2,000 <br />8.3.2 Dugout Storage 2 80 160 Locate within dugout (at end) or adjacent to Player Dugout Access.160 <br />8.3.3 Dugout Toilets 2 60 120 Locate within dugout (at end) or adjacent to Player Dugout Access.120 <br />8.3.4 Bat Swing Areas 2 140 280 Locate along Player Dugout Access. <br />8.4 FIELD EQUIPMENT 2,000 2,000 <br />8.4.1 Field Equipment Storage 1 2,000 2,000 Outdoor area for batting cage, field screens, drags, and marking equipment.2,000 <br />8.4.2 Batter's Eye Screen Monochromatic background in center field. Minimum size of 16' high x 32' tall. <br />8.4.3 Foul Poles 2 Recommended minimum 45' tall. <br />8.4.4 Flag Poles 3 Provide 3 flagpoles. <br />8.4.5 Backstop 1 Cable-supported. Foul pole to foul pole. <br />8.4.6 Playing Field Tarp Determine safe area in foul territory, or create cut-out in seating bowl. <br />8.5 SPORTS LIGHTING - <br />8.5.1 Sports Lighting System Provide A standards as minimum - 120 fc infield, 70 fc outfield. USL is uniform. <br />Total - Enclosed Areas 2,560 NSF 2,280 NSF <br /> Net to gross 10%260 SF 230 SF <br />Total - Outdoor Areas 129,400 SF 129,400 SF <br />TOTAL 132,220 GSF 131,910 GSF <br />3/6/2025 Prepared by DLR Group Page 6 of 8 <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit B - Owner's Initial Project Program