My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Program Summary <br />Everett Multipurpose Stadium <br />Everett, WA <br />March 2025 <br />8.0 PLAYING FIELD FACILITIES <br />Class <br />No.Space Type Units SF Total SF Description MLB Req'd <br />8.1 PLAYING FIELD 125,000 125,000 <br />8.1.1 Playing Field 1 125,000 Provide drainage and infrastructure for change overs.125,000 <br />8.1.2 Playing Field Dimensions Comply with NAPBL minimums: 325' at foul poles, 400' at center field. <br />8.1.3 Field Wall Minimum 8' tall, padding. Make outfield wall unique. <br />8.2 BULLPENS 2,400 2,400 <br />8.2.1 Bullpens 2 1,200 2,400 Provide based on PDL requirements, covered seating area.2,400 <br />8.2.2 Bullpen Toilets 0 80 0 Provide adjacent to bullpens if too remote from dugouts. <br />8.3 DUGOUTS 2,560 2,280 <br />8.3.1 Dugouts 2 1,000 2,000 Each to include 45-person bench, bat/helmet rack, elec. water cooler, house phone.2,000 <br />8.3.2 Dugout Storage 2 80 160 Locate within dugout (at end) or adjacent to Player Dugout Access.160 <br />8.3.3 Dugout Toilets 2 60 120 Locate within dugout (at end) or adjacent to Player Dugout Access.120 <br />8.3.4 Bat Swing Areas 2 140 280 Locate along Player Dugout Access. <br />8.4 FIELD EQUIPMENT 2,000 2,000 <br />8.4.1 Field Equipment Storage 1 2,000 2,000 Outdoor area for batting cage, field screens, drags, and marking equipment.2,000 <br />8.4.2 Batter's Eye Screen Monochromatic background in center field. Minimum size of 16' high x 32' tall. <br />8.4.3 Foul Poles 2 Recommended minimum 45' tall. <br />8.4.4 Flag Poles 3 Provide 3 flagpoles. <br />8.4.5 Backstop 1 Cable-supported. Foul pole to foul pole. <br />8.4.6 Playing Field Tarp Determine safe area in foul territory, or create cut-out in seating bowl. <br />8.5 SPORTS LIGHTING - <br />8.5.1 Sports Lighting System Provide A standards as minimum - 120 fc infield, 70 fc outfield. USL is uniform. <br />Total - Enclosed Areas 2,560 NSF 2,280 NSF <br /> Net to gross 10%260 SF 230 SF <br />Total - Outdoor Areas 129,400 SF 129,400 SF <br />TOTAL 132,220 GSF 131,910 GSF <br />3/6/2025 Prepared by DLR Group Page 6 of 8 <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit B - Owner's Initial Project Program
The URL can be used to link to this page
Your browser does not support the video tag.