Laserfiche WebLink
Program Summary <br />Everett Multipurpose Stadium <br />Everett, WA <br />March 2025 <br />SQUARE FOOTAGE SUMMARY <br />Class <br />No.Class Type MLB Req'd <br />Building Building <br />Enclosed Not Enclosed <br />1.0 Site Requirements -47,850 SF <br />2.0 Spectator Seating -- <br />3.0 Spectator Facilities 18,755 NSF 37,500 SF <br />4.0 Food & Retail Facilities 7,760 NSF - <br />5.0 Media Facilities 1,590 NSF 736 SF <br />6.0 Administrative Facilities 3,850 NSF - <br />7.0 Team / Event Facilities 17,200 NSF - <br />8.0 Playing Field Facilities 2,560 NSF - <br />9.0 Service & Operations Facilities 8,150 NSF 200 SF <br />10.0 Sound System & Scoreboard -- <br />Subtotal Building Area 59,865 NSF 86,286 SF 13,690 NSF <br /> Seating Area - Concrete 31,650 SF <br /> Seating Area - Grass 5,000 SF <br /> Playing Field - Artificial Turf 125,000 SF <br /> Bullpens - Artificial Turf 2,400 SF <br /> Outdoor Equipment Storage 2,000 SF <br /> Loading Dock Area 800 SF <br />Total Building Area - Base Project 72,185 GSF 253,136 SF 146,170 GSF <br />3/6/2025 Prepared by DLR Group Page 8 of 8 <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit B - Owner's Initial Project Program