My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
6 <br />Progressive Design Build Contract <br /> <br /> <br />Article 3 <br />Contract Documents <br />The Contract Documents are comprised of the following, which are incorporated herein by this reference. <br />In the event of a conflict or discrepancy among or in the Contract Documents that cannot be resolved by <br />interpreting the Contract Documents as a single, integrated document and giving effect to each provision <br />therein, interpretation shall be governed in the following priority: <br /> <br />3.1 All written and fully executed modifications, amendments (including the GMP Amendment), minor <br />changes, and Change Orders to this Contract issued in accordance with the General Conditions, with more <br />recent documents taking preference; <br /> <br />3.2 The GMP Amendment including the Basis of Design Documents and including the Project Labor <br />Agreement attached thereto, if any; <br /> <br />3.3 This Contract, including all exhibits and attachments but excluding the Owner Initial Programming <br />and Overview and Provided Information attached to this Contract. The Owner Initial Programming and <br />Overview and Provided Information are not Contract Documents, and are provided for information only; <br /> <br />3.4 The General Conditions; <br /> <br />3.5 Construction Documents prepared and approved in accordance with Section 2.4 of the General <br />Conditions; <br /> <br />3.6 Owner’s Request for Qualifications, its Request for Proposals, and Addenda thereto, if any; and <br /> <br />3.7 Design-Builder’s Statement of Qualifications, Proposal, and Attachments accepted by Owner. <br /> <br />Article 4 <br />Interpretation and Intent <br />4.1 Design-Builder and Owner, at the time of acceptance of the Phase 2 Proposal by Owner in full, <br />shall carefully review all the Contract Documents, including the various documents comprising the Basis of <br />Design Documents for any conflicts or ambiguities. Design-Builder and Owner will discuss and resolve any <br />identified conflicts or ambiguities prior to execution of the GMP Amendment. <br /> <br />4.2 The Contract Documents are intended to permit the parties to complete the Work and all obligations <br />required by the Contract Documents within the Contract Time(s) for the Contract Price. The Contract <br />Documents are intended to be complementary and interpreted in harmony to avoid conflict, with words and <br />phrases interpreted in a manner consistent with construction and design industry standards. In the event <br />inconsistencies, conflicts, or ambiguities between or among the Contract Documents discovered after <br />Owner’s acceptance of the Proposal, Design-Builder and Owner shall attempt to resolve any ambiguity, <br />conflict, or inconsistency informally, recognizing that the Contract Documents shall take precedence in the <br />order in which they are listed in Article 3 herein. <br /> <br />4.3 Terms, words, and phrases used in the Contract Documents, including this Contract, shall have <br />the meanings given them in the General Conditions. <br /> <br />4.4 Design-Builder may propose modifications to and expansion of the Owner’s Initial Programming <br />and Overview. Prior to presenting its Phase 2 Proposal, the Design-Builder shall identify any items in the <br />Owner’s Initial Programming and Overview. that conflict with or in any way impede Design-Builder’s ability <br />to meet any Performance Standards set forth in the Owner’s Initial Programming and Overview. <br />
The URL can be used to link to this page
Your browser does not support the video tag.