My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Proposal for Design Consultation Services <br />Project: Everett Multi-Purpose Stadium <br />Client: DLR Group & SOJ <br />Submitted by: Headwater People <br /> <br />Headwater People is pleased to submit this proposal to provide design consultation services for <br />the new multi-purpose stadium in Everett, Washington. Our work will focus on engagement with <br />the Tulalip Tribes and other regional tribes, incorporating Coast Salish and Tulalip art and <br />design into the project. <br />Our team has extensive experience in leading Tribal engagement and cultural design <br />integration, with successful collaborations on projects such as the Seattle Aquarium, Elliott Bay <br />Connections, and the Pacific Science Center. We bring deep relationships with Indigenous <br />communities and a proven track record of ensuring authentic representation in public spaces. <br />Headwater People excels at bridging the gap between a Western design perspective and Coast <br />Salish-informed artists, designers, and Tribal leaders. We foster meaningful collaboration by <br />supporting and working alongside architects and planners, ensuring they feel engaged and <br />confident in incorporating Indigenous perspectives. At the same time, we provide crucial support <br />for Native artists and designers by facilitating pathways for their work to be showcased in a <br />significant public venue, ensuring their contributions are recognized and valued. Our goal is to <br />cultivate an inclusive and enriching process where all parties feel connected to a shared vision <br />and take pride in their collective contribution. <br /> <br />Scope of Work <br />Headwater People will lead the engagement with the Tulalip Tribes and other tribes that may be <br />identified during the course of the project. Our work will include: <br />1. Tribal Engagement & Relationship Building <br />○ Establish and maintain communication with the Tulalip Tribes and other <br />Indigenous communities. <br />○ Facilitate discussions to ensure Tribal voices are represented in the stadium <br />design process. <br />2. Identification of Indigenous Designers & Artists <br />○ Work with the Tulalip Tribes and other stakeholders to identify designers and <br />artists specializing in Coast Salish and Tulalip art. <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.