My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bayley Construction LP 6/18/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Bayley Construction LP 6/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 10:03:31 AM
Creation date
7/3/2025 9:59:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Bayley Construction LP
Approval Date
6/18/2025
Council Approval Date
6/11/2025
Department
Administration
Department Project Manager
Scott Pattison
Subject / Project Title
Outdoor Event Center - Design Phase 1A of the project
Tracking Number
0004869
Total Compensation
$2,901,602.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Eligible reimbursables include: <br />● Gifts for Tribal partners (estimated at $500), in alignment with cultural protocols <br /> <br />● Mileage for travel, reimbursed at the Washington State rate (currently $0.67 per mile) <br /> <br />● Lodging, if overnight travel is required – $250 per night <br /> <br />● Meals, during travel or full-day engagements – $100 per day <br /> <br />● Printing and materials for meetings, presentations, or community engagement <br /> <br />● Other incidentals that support Tribal engagement and consultation <br /> <br />Not-to-Exceed Total for Reimbursables: $1,500 <br />Mileage and rates may be adjusted with client approval based on state guidelines <br />or project needs. <br /> <br />Exclusions & Additional Services <br />The following services are excluded from the $20,000 base fee. If any of these or other <br />unanticipated needs arise, they will require a separately approved Additional Service Request <br />(ASR) prior to beginning work. <br />● Payment or contracting of Tribal artists <br /> <br />● Event planning <br /> <br />● Major changes in project timeline or scope that require additional time <br /> <br />● Additional design or facilitation beyond what is included in scope of work <br /> <br />● Participation in project phases not currently defined <br /> <br />Each ASR will include scope, cost, and timeline for review and approval. <br /> <br />Project Team <br />Design-Build Contract for Everett Outdoor Events Center <br />Exhibit C - Phase 1A Work and Fee Proposal
The URL can be used to link to this page
Your browser does not support the video tag.