Laserfiche WebLink
City of EverettEverett Transit College Plug-In Bus ChargerDimitri Siaterlis Dean Ralphs Curtis Smith Derek RajahAngel Venegas Shay Witten7-May-25 ProjectManager QA/QC Jr. Manager-Sr. Designer EE Designer I AutoCAD Admin DEA Billing Rate (2025)301.00$ 320.00$ 207.00$ 150.00$ 152.00$ 114.00$ Task #Scope of Services1Project Management (internal)8 12 201.1 Project Administration (internal)8 81.2 QA/QC (internal)4 41.3 Bi-weekly Team Coordination Meetings with City Staff16162 Electrical Engineering and Design2.1 Prepare site and building electrical plan showing one electrical vehicle charging station including one-line, electrical site plan, switchgear and equipment layout, schedules, details, and ROM construction estimate. Submittals include 90%, and 100%.8 12 12 322.2 Engineering calculations include load analysis, voltage drop and short circuit calculations.4 8 122.3 Project coordination including site visit, coordination with Everett Transit, Snohomish PUD and ChargePoint.8 4 16 283 Construction Bid Documents3.1 Provide construction bid document deliverables including specifications and final signed and sealed drawings for IFB.8 12 8 12 404 Construction Management4.1 Review electrical submittals and respond to RFIs.6 16 8 304.2 Two (2) Onsite visits during construction. 8 84.3 Change order management including reviewing and responding to contractor requests for field modifications as requested. 2 8 104.4 Assist with final acceptance testing, project closeout and document transfer.2 8 4 14Total Hours 62 8 88 16 24 2422218,662.00$ 2,560.00$ 18,216.00$ 2,400.00$ 3,648.00$ 2,736.00$ 48,222.00$ ExpensesMileage:500.00$ David Evans and Associates, Inc's Subtotal Budget (Not to Exceed)48,722.00$ Civil Subconsultant KPFF Engineers 28,575.32$ 4% OH on KPFF's Fee Proposal 1,143.01$ Total Project Budget (Not to Exceed)78,440.33$ Total Cost by StaffTotalHours