Laserfiche WebLink
<br />Page 48 of 58 <br /> <br />FCC: Federal Communications Commission. <br />FMVSS: Federal Motor Vehicle Safety Standards. <br />GASB: Governmental Accounting Standards Board. <br />GPS: Global Positioning System. <br />HTMA: Hydraulic Tool Manufacturer’s Association. <br />IFI: International Fastener Institute. <br />ISO: International Standard Organization. <br />JIC: Joint Industrial Council. <br />L&I: the Washington State Department of Labor and Industries. <br />Lower Tier Participant: see “Supplier”. <br />Mandatory Features: a condition set out in the scope of work or specifications that must be met without <br />alteration. Not meeting a mandatory requirement may be grounds for disqualification of a bid or proposal. <br />Must: see “Shall”. <br />NASSCO: National Association of Sewer Service Companies. <br />NATM: National Association of Trailer Manufacturers. <br />NBS: National Bureau of Standards. <br />NEC: National Electrical Code. <br />NFPA: National Fire Protection Agency. <br />NTEA: National Truck Equipment Association. <br />OEM: Original Equipment Manufacturer. <br />Offeror: see “Supplier”. <br />OSHA: Occupational Safety and Health Administration. <br />PACP: NASSCO’s Pipeline Assessment Certification Program. <br />Price Analysis: comparison of proposed price to comparable pricing data. <br />Prime Contractor: see “Supplier”. <br />Procurement Professional: the individual in Procurement assigned by the City of Everett who is responsible for <br />resolving contractual issues and supporting the Project Manager during Contract performance. This includes the <br />issuance of a written document to amend, modify, or deviate from the Contract terms, conditions, requirements, <br />specifications, details, or delivery schedule. <br />Project Manager: the individual assigned by the requesting department that is responsible for managing, <br />inspecting, and monitoring all Contractor work performed to ensure compliance with the contract requirements.