My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/07/02 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/07/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 11:21:56 AM
Creation date
7/3/2025 11:18:50 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/2/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Project title: Everett Transit Inductive Charging Infrastructure Field Installation Certificate of Completion <br />Council Bill # interoffice use <br /> Project: Installation of Inductive Charging Infrastructure at Seaway and College Transit Stations <br />Partner/Supplier: Valdez Construction, Inc. <br /> Location: Seaway Transit Center and College Transit Station <br />Preceding action: Change Order 1, 4/30/2025 <br />Fund: Transit 425 <br />Agenda dates requested: <br /> <br /> <br />Briefing <br />Proposed action <br />Consent 7/2/2025 <br />Action <br />Ordinance <br />Public hearing <br /> Yes X No <br /> <br />Budget amendment: <br /> Yes X No <br /> <br />PowerPoint presentation: <br /> Yes X No <br /> <br />Attachments: <br />Certificate of Completion <br /> <br />Department(s) involved: <br />Transit <br /> <br />Contact person: <br />Michael Schmieder, Director <br /> <br />Phone number: <br />425-257-7761 <br /> <br />Email: <br />mschmieder@everettwa.gov <br />Initialed by: <br />MS <br />Department head <br /> <br />Administration <br /> <br />Council President <br />Fiscal summary statement: <br />The Everett Transit Inductive Charging Infrastructure Field Installation project was Physically <br />Complete on May 13, 2025. The final contract sum was $3,596,078.60 <br />The project is funded in part through a Washington State Department of Transportation -Green <br />Transportation Grant in the amount of $1,824,000. Everett Transit local funds are allocated for <br />the balance of construction costs. <br />Project summary statement: <br />Everett Transit’s Inductive Charging Infrastructure Project provides for the installation of on- <br />demand inductive charging capability. Four inductive charging locations will be installed at two <br />primary station hubs: two charging bays at College Station at Everett Community College and two <br />charging bays at Seaway Transit Station in partnership with Community Transit. Each 300KW <br />charging bay will allow electric buses to continuously charge during layover periods, thereby <br />maintaining a more consistent level of charge and extending the serviceable range of the <br />vehicles. Since 2018, Everett Transit's electric buses have: Traveled more than 1.39 million clean <br />miles; Cut diesel fuel use by more than 290,000 gallons; Eliminated significant noise pollution. <br />Everett Transit is committed to creating a balanced and energy efficient fleet that provides <br />maximum value to our community and enhances the quality of life of all who live, work, leisure <br />and travel in Everett. This project directly supports these goals. <br />Recommendation (exact action requested of Council): <br />Accept the Everett Transit Inductive Charging Infrastructure Field Installation project as complete <br />and authorize the Mayor to sign the Certificate of Completion. <br /> <br />City Council Agenda Item Cover Sheet
The URL can be used to link to this page
Your browser does not support the video tag.