Laserfiche WebLink
<br />Page 41 of 58 <br /> <br />d. Allow option to only Export tasks when <br />there is an associated inspection. <br />e. Allow mapping between other fields in the <br />two systems. <br />Modification of the layout of Cityworks Office or <br />Respond UI with a custom button or other user <br />interface control to open the completed inspection <br />in the inspection software for further examination <br />and review. <br />D <br /> <br /> <br /> <br />4. Reporting requirements <br />Functionality <br />D = Desired <br />R = Required <br />No Partial Full <br />Individual inspection summary reports must be <br />available, and tabulate pipe survey results. R <br />Reports showing all defects in an inspection must <br />be available and programmable to list specific <br />defects observed with corresponding footage, <br />starting and ending manhole ID numbers, <br />structural pipe defects, laterals, collapsed pipes, <br />and other asset properties. <br />R <br /> <br />Grading reports must be included that show pipe <br />material and diameter, as well as grade scores for <br />each survey with totals. <br />R <br /> <br />Allow users to make or create their own reports. If <br />third-party software is necessary for report <br />creation, the supplier must specify this and what <br />additional software or systems are required to <br />produce such reports. <br />R <br /> <br /> <br />5. Scheduling export and import of data <br />Functionality <br />D = Desired <br />R = Required <br />No Partial Full