My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Pacific Northwest Stormwater LLC 6/20/2025
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Pacific Northwest Stormwater LLC 6/20/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 12:06:42 PM
Creation date
7/3/2025 12:06:15 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Pacific Northwest Stormwater LLC
Approval Date
6/20/2025
End Date
6/26/2026
Department
Parks & Community Services
Department Project Manager
Lolly Huggins
Subject / Project Title
Environmental consulting services
Tracking Number
0004890
Total Compensation
$11,852.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />SCOPE OF WORK <br />Scope of Services <br />One-Time Fee – $6,500 <br />● Contractor’s Erosion and Sediment Control Plan (CESCP): Developed per Section 3.05 of <br />Specification 01 57 23, the CESCP will include site-specific drawings and descriptions of <br />staging areas, BMP placement by phase, designated erosion control personnel, <br />inspection/maintenance schedules, and pollution control procedures. <br /> <br />● Spill and Pollution Prevention Plan (SPPP): Prepared to align with all provisions of the <br />Hydraulic Project Approval, the SPPP will outline preventive measures, emergency <br />response protocols, and Best Management Practices (BMPs) to protect surface and <br />groundwater during construction. <br />Monthly Services – $5,352 per month <br />Function as the project’s CESCP Coordinator by: <br />• Conducting weekly CESCL inspections in compliance with Section A.4.b. <br />• Providing training on the Western Washington Stormwater Management Manual BMPs <br />to contractor personnel designated as the CESCP Installer/Erosion and Sediment <br />Control Representative (likely the PM, Superintendent, or Foreman). <br />• Assisting with maintenance documentation requirements. <br />• Providing ongoing consultation and access to the Project OverSite compliance platform. <br />Monthly charges can be prorated based on the actual project timeline. Additional weeks beyond <br />a full month are billed at $1,338 per week. <br /> <br />Additional Services (if required) <br />• Additional Inspections (Post Storm Event): $770 per visit <br />• Stormwater Consultation: Billed at our standard hourly rate $220. <br />Expert guidance on stormwater strategy, BMP implementation, compliance support, and <br />system assessments for both new and existing sites. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.