Laserfiche WebLink
Exhibit A (Scope of Work) <br />SCOPE OF WORK <br />Scope of Services <br />One-Time Fee – $6,500 <br />● Contractor’s Erosion and Sediment Control Plan (CESCP): Developed per Section 3.05 of <br />Specification 01 57 23, the CESCP will include site-specific drawings and descriptions of <br />staging areas, BMP placement by phase, designated erosion control personnel, <br />inspection/maintenance schedules, and pollution control procedures. <br /> <br />● Spill and Pollution Prevention Plan (SPPP): Prepared to align with all provisions of the <br />Hydraulic Project Approval, the SPPP will outline preventive measures, emergency <br />response protocols, and Best Management Practices (BMPs) to protect surface and <br />groundwater during construction. <br />Monthly Services – $5,352 per month <br />Function as the project’s CESCP Coordinator by: <br />• Conducting weekly CESCL inspections in compliance with Section A.4.b. <br />• Providing training on the Western Washington Stormwater Management Manual BMPs <br />to contractor personnel designated as the CESCP Installer/Erosion and Sediment <br />Control Representative (likely the PM, Superintendent, or Foreman). <br />• Assisting with maintenance documentation requirements. <br />• Providing ongoing consultation and access to the Project OverSite compliance platform. <br />Monthly charges can be prorated based on the actual project timeline. Additional weeks beyond <br />a full month are billed at $1,338 per week. <br /> <br />Additional Services (if required) <br />• Additional Inspections (Post Storm Event): $770 per visit <br />• Stormwater Consultation: Billed at our standard hourly rate $220. <br />Expert guidance on stormwater strategy, BMP implementation, compliance support, and <br />system assessments for both new and existing sites. <br /> <br />