Laserfiche WebLink
A FLAG NOTES: <br /> 1 DEMOLISH EXISTING MEDICAL VACUUM PUMP.MAINTAIN AND PROTECT EXISTING VECA <br /> CIRCUIT FROM SWITCHBOARD 4Y1 D.REFER TO FLAG NOTE 2 ON THIS SHEET FOR <br /> PANEL SCHEDULEPANELSPEC <br /> (EXISTING) BUS RATING: 225 AMPS LocnrloN: PANEL 41A YES NO RECONNECTION REQUIREMENTS. <br /> 480 <br /> 3-PHASE PNL.MFR.: MAN BKR: MLO MOUNTING: FEED-THRU LUGS X 2 EXTEND EXISTING CIRCUIT TO NEW MEDICAL VACUUM PUMP DISCONNECT.EXTEND ELECTRIC&TECHNOLOGIES <br /> 1 CONDUIT AND CONDUCTORS REQUIRED.REFER TO SHEETS ED1.3 AND E1.3 FOR <br /> 4-WIRE CAT.NO.: AI.C.RATING: A1C SYM FED FROM: SWBD 4Y1D DOUBLE LUGS X EXISTING MEDICAL VACUUM PUMP BRANCH CIRCUIT SIZE. <br /> 200%NEUTRAL X <br /> CKT CIRCUIT DESCRIPTION LOAD LOCATION CODE LOAD BKR PH BKR LOAD CODE CIRCUIT DESCRIPTION LOAD LOCATION CKT 3 REFER TO ONE-LINE DIAGRAM ON SHEET E1.3 FOR EXISTING BREAKER SIZE. <br /> NO. (ROOMNO./GRID) (kVA) AMPS AMPS (kVA) (ROOM NO./GRID) NO. 4 COORDINATE EXACT LOCATION OF NEW MEDICAL VACUUM PUMP DISCONNECT WITH <br /> 1# LTG ROOMS 125&129 L 1.92 2011 -A 20/1 1.92 L LTG ROOMS 125&129 2# OWNER PRIOR TO INSTALLATION.PROVIDE CONNECTION TO MEDICAL VACUUM <br /> CONSULTANTS <br /> 3# LTG ROOMS 154&158 L 1.92 2011 -B- 2011 1.92 L LTG BREAST C ROOM 132E 4# PUMPS AND CONTROLLER AS INDICATED. <br /> 5 SPARE 20/1 -C- 2011 SPARE 6 <br /> 7 SPARE 2011 -A 2011 SPARE 8 5 PROVIDE NEW BRANCH CIRCUIT IN EXISTING 3/4"CONDUIT. <br /> 9 SPARE 20/1 -B- 20/1 SPARE 10 <br /> 11 SPARE 20/1 -C- 2011 SPARE 12 <br /> PUMP 13 SPARE 20/1 -A 20/1 SPARE 14 <br /> 15 SPARE 2011 -B- 20/1 SPARE 16 EVIDENCE <br /> 17 SPARE 2011 -C- 20/1 SPARE 18 BASED <br /> EXISTING MEDICAL 21 SPACE -B- 70/3 13.33 Z 40kW UPS MDF 22# <br /> VACUUM PUMPS 2&3 __ BD � DESIGN <br /> (2)@ 1OHP,48OV/3P 23 SPACE -C- 13.33 Z - 24# SERVICES <br /> 25 SPACE -A. SPACE 26 <br /> 27 SPACE -B- SPACE 28 <br /> 29 SPACE -C- SPACE 30 <br /> ILL" <br /> 31 SPACE -A. SPACE 32 M <br /> 33 SPACE -B- SPACE 34 F WASyl�.�f <br /> 35 SPACE -C- SPACE 36 <br /> 37 SPACE -A SPACE 38 _ <br /> 39 SPP T -B- SPACE 40 <br /> 41 SPACE -C- SPACE 42 17724�,c0 <br /> CODES: CONNECTED LOAD CALCULATED DEMAND LOAD NOTES: <br /> H =HVAC LOADS 0.00 kVA 0.00 kVA (100%) 1.ASTERIK(.)NEXT TO CKT INDICATES NEW,ADDED,OR `sAONAL <br /> K =KITCHEN EQUIPMENT 0.00 kVA 0.00 kVA (100%) REVISEDLOAD 11 7 <br /> L =LIGHTING LOADS 7.68 kVA 9.60 kVA (125%) 2.EXISTING CIRCUITS MARKEDWITH# <br /> LM =LARGEST SINGLE MOTOR 0.00 kVA 0.00 kVA (125%) 3."EBNL"INDICATES AN EXISTING BREAKER WITH NEW LOAD MEDICAL VACUUM <br /> M =OTHER MOTOR LOADS 0.00 kVA 0.00 kVA (100%) 4."NBNL"INDICATES A NEW BREAKER W ITH NEW LOAD <br /> NC =NON-COINCIDENTAL LOADS 0.00 kVA 0.00 kVA (0%) PUMP REPLACEMENT <br /> LEVEL 1 - POWER DEMOLITION PLAN R =DEDICALDSECEPTACLELES 0.00 kVA 0.00 kVA (100%10kVP) <br /> S DEDICATED RECEPTACLES 0.00 kVA 0.00 kVA (100%) <br /> E1.1 CALE:1/4"=l'-O" EO.0 Z =MISC.OR APPLIANCES 40.00 kVA 40.00 kVA (100%) <br /> TOTALS: 47.68 kVA 49.60 kVA <br /> 57.4 AMPS 60 AMPS PROVIDENCE REGIONAL MEDICAL <br /> CENTER <br /> PACIFIC CAMPUS <br /> 916 PACIFIC AVE <br /> PANEL SCHEDULE (REVISED) PANEL 4Y1A EVERETT,WA 98201 <br /> 480 Y/277 VOLTS CRITICAL POWER BUS RATING: 225 AMPS LOCATION: SPEC PANEL WITH: YES NO <br /> 3-PHASE PNL.MFR.: MAN BKR: MLO MOUNTING: FEED-THRU LUGS X <br /> 4-WIRE CAT.NO.: AI.C.RATING: AC SYM FED FROM: SWBD 4Y1D DOUBLE LUGS X <br /> 200%NEUTRAL X <br /> CKT CIRCUIT DESCRIPTION LOAD LOCATION CODE LOAD BKR PH BKR LOAD CODE CIRCUITDESCRIPTION LOAD LOCATION CKT <br /> NO. (ROOMNO./GRID) (kVA) AMPS AMPS (kVA) (ROOMNO./GRID) NO. <br /> 1# LTG ROOMS 125&129 L 1.92 20/1 -A. 20/1 1.92 L LTG ROOMS 125&129 2# <br /> 3# LTG ROOMS 154&158 L 1.92 2011 -B- 20/1 1.92 L LTG BREAST C ROOM 132E 4# <br /> 5* TEMP MEDICAL VACUUM PUMP(NBNL)PUMP ROOM Z 3.21 -C- 2011 SPARE 6 <br /> 7* - Z 3.21 20/3 -A 20/1 SPARE 8 <br /> 1 9* - Z 3.21 -B- 20/1 SPARE 10 <br /> PANEL 4YIA-5171 11 SPARE 20/1 -C- 20/1 SPARE 12 CONSTRUCTION <br /> TEMPORARY MEDICAL 314"C,3#12,&1#12G CU 13 SPARE 20/1 -A 2011 SPARE 14 <br /> VACUUM PUMP 15 SPARE 20/1 -B- 2011 SPARE 16 DOCUMENTS <br /> 480VI3P,11.6A <br /> TEMPORARY <br /> SPARE 2011 -C- 2011 SPARE 18 <br /> 19 SPACE -A. 13.33 Z 40kW UPS MDF 20# <br /> 21 SPACE -B- 70/3 13.33 Z 22# <br /> 30AS 23 SPACE -C- 13.33 Z 24# <br /> 20 25 SPACE -A SPACE 26 <br /> P EL4Y1A5,7,9 27 SPACE -B- SPACE 28 <br /> 29 SPACE -C- SPACE 30 <br /> 3/4"C,3#10,&1#1OG CU 31 SPACE -A. SPACE 32 <br /> NEW MEDICAL VACUUM PUMPS 33 SPACE -B- SPACE 34 <br /> &CONTROLLER 3OAAF F 35 SPACE -C- SPACE 36 <br /> (2)@ 7.SHP,480VI3P 30 <br /> 37 SPACE -A SPACE 38 <br /> 4 3 2 39 SPACE -B- SPACE 40 <br /> 41 SPACE EE -C- SPACE 42 <br /> CODES: CONNECTED LOAD CALCULATED DEMAND LOAD NOTES: <br /> H HVAC LOADS 0.00 kVA 0.00 kVA (100%) 1.ASTERIK(*)NEXT TO CKT INDICATES NEW,ADDED,OR <br /> K =KITCHEN EQUIPMENT 0.00 kVA 0.00 kVA (100%) REVISEDLOAD <br /> L =LIGHTING LOADS 7.68 kVA 9.60 kVA (125%) 2.EXISTING CIRCUITS MARKEDWITH# <br /> LM =LARGEST SINGLE MOTOR 0.00 kVA 0.00 kVA (125%) 3."EBNL"INDICATESAN EXISTING BREAKER WITH NEW LOAD <br /> M =OTHER MOTOR LOADS 0.00 kVA 0.00 kVA (100%) 4."NBNL"INDICATES A NEW BREAKER W ITH NEW LOAD <br /> NC =NON-COINCIDENTAL LOADS 0.00 kVA 0.00 kVA (0%) <br /> R =GENERAL USE RECEPTACLES 0.00 kVA 0.00 kVA (50%1101,VAQ <br /> S =DEDICATED RECEPTACLES 0.00 kVA 0.00 kVA (100%) <br /> Z =MISC.OR APPLIANCES 49.64 kVA 49.64 kVA (100%) <br /> TOTALS: 57.32 kVA 59.24 kVA <br /> 69.0 AMPS 71 AMPS 1 111/2 0 24 TEMPORARY MEDICAL VACUUM PUMP <br /> 10/18/2024 CONSTRUCTION DOCUMENTS <br /> MARK DATE DESCRIPTION <br /> LEVEL1 - POWER PLAN PROJECT NO:B24-1119 <br /> CAD DWG FILE:E11.DWG <br /> E11 CALE:1/4"=l'-O" EO.O <br /> DRAWN BY:CBS <br /> CHK'D BY:KMD <br /> LOAD SUMMARY-SWBD4YID COPYRIGHT: <br /> HP kVA A <br /> EXISTING MEDICAL VACUUM PUMPS 2&3 (2) 10 21.6 26 SHEET TITLE <br /> NEW MEDICAL VACUUM PUMPS (2)@7.5 1 15.8 19 LEVEL 1 - POWER <br /> NET LOAD REDUCTION -5.8 -7 <br /> FLOOR PLANS <br /> E1.1 <br />